Docks, Hasting Village Marina North and South Side

The County of Northumberland and Municipality of Trent Hills propose the construction of two docks on the north and south shores of the Trent River at the Hastings Village Marina.
 
On the north shore: Construction of a dock approximately 90m long parallel to the existing stone retaining wall. Project provisionally includes up to seven floating "finger" docks 6.1m in length. The dock will consist of treated timber and/or composite PVC decking and steel.
 
On the south shore: Construction of a dock adjacent to an existing boat launch. The dock will be approximately 26m long and will run parallel to the existing concrete pad. The dock shall be consist of treated timber and/or composite PVC decking and steel. A new concrete ballast wall/footing will be constructed where the deck adjoins the existing concrete boat launch ramp.


Disclaimer

This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.

 

Latest update

The assessment is in progress.

Contacts

  • Transport Canada
  • 4900 Yonge Street
  • Toronto, ON, M2N 6A5
  • Telephone: 416-952-0491
  • Fax: 416-952-0514
  • Email: enviroont@tc.gc.ca

  • Location

    • Hastings Village Marina (Ontario)
  • Project Type

    • Recreation and Tourism
  • Status

    In progress
  • Start Date

    2020-05-06
  • Proponent

    County of Northumberland & Muncipality of Trent Hills
  • Authorities

    • Transport Canada
  • Assessment Type

    Project on federal lands
  • Reference Number

    80656