Beach Revitalization and New Boardwalk Trail
The Rouge Beach Improvements project features a revitalization of the Beach Day Use Area within Rouge National Urban Park; a new signature trail that will provide an in-park connection from Rouge Beach to the existing Mast trail; improvements to the existing Mast Trail trailhead, as well as emergency work on the lower beach area to combat climate change, flooding, and erosion. The primary goals of the project are community improvements to the beach area, climate change adaptation and community safety, and enhance ecological restoration and conservation. This project will enhance the natural and cultural integrity of the area and foster meaningful connections to its natural beauty and rich history.
Disclaimer
This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.
Latest update
Key documents
Document Number | Document Title | File | Date |
---|---|---|---|
1 | Beach Revitalization and New Boardwalk Trail - Public comments invited from 17 November to 17 December 2020 | - | November 17, 2020 |
List all records
Contacts
Rouge National Urban Park105 Guildwood Parkway
PO Box 11024
Toronto, Ontario M1E 1N0
Telephone: 416-264-2020
Fax: 416-264-2167
Email: pc.rouge.pc@canada.ca
-
Location
- Detailed Impact Assessment, Rouge National Urban Park (Ontario)
-
Project Type
- Building and Property Development
- Recreation and Tourism
-
Status
In progress -
Start Date
2020-11-17 -
Proponent
Parks Canada -
Authorities
- Parks Canada Agency
-
Assessment Type
Project on federal lands -
Reference Number
81149
Nearby projects
..within 200 kilometres-
Glen Rouge Campground Revitalization
Rouge National Urban Park -
Pre-Fabricated Office Installation
Rouge National Urban Park -
Trans Northern Pipeline Integrity Digs
Rouge National Urban Park -
Municipal Water Infrastructure, City of Pickering Zone 4 and 5
City of Pickering -
Wheelhouse Marine Supply, Brougham, Ontario
Brougham, Ontario -
Agricultural Drainage System Expansion, Pickering Township Concession 7, Lot 19-22
City of Pickering -
Deer Exclusion Fencing
Rouge National Urban Park -
Boyles Cemetery to Bob Hunter Trail Construction
Rouge National Urban Park -
Septic System Replacements
Rouge National Urban Park -
Eastern Mainline Project
Markham -
Removal of two underground concrete tanks
Oshawa -
Port of Oshawa Salt Terminal
Oshawa -
Eastern Mainline Project
Bowmanville -
Refurbishment and Continued Operation of the Darlington Nuclear Generating Station
Darlington -
Keswick Post Office Site Remediation
Keswick -
Junior Commissariat Officers' Quarters - Recapitalization Project
Niagara National Historic Sites -
Pefferlaw Small Craft Harbour Tree & Brush Removal
Pefferlaw -
Port Weller Water Level Gauge Station Shoreline Reinforcement Project
St. Catharines -
The Proposal by Cameco Corporation for the Redevelopment of its Port Hope Conversion Facility (Vision 2010)
Port Hope -
Dalhousie Yacht Club - Travel Lift
Dalhousie Yacht Club, Port Dalhousie, ON -
Milton Logistics Hub Project
Milton -
Trent-Severn Waterway Durham Regional Road 50 Bridge
Trent-Severn Waterway National Historic Site -
Boat Slip Sediment Remediation Project
Hamilton Harbour -
Reid Road Reservoir Quarry Project
Milton -
Randle Reef Contaminated Sediment Remediation Project
Hamilton Harbour -
Installation of Beaver Baffles in Range and Training Area B2, at Canadian Forces Base Borden
Canadian Forces Base Borden -
Grey and Simcoe Foresters Storage Compound Building, Borden - Ontario
Canadian Forces Base Borden -
Construction and Operation of a Transition Centre at CFB Borden, Ontario
Canadian Forces Base Borden -
Soil Remediation at CFB Borden Firefighter Training Area
CFB Borden Firefighter Training Area which is approximately 3.6 km southeast of Lisle, Ontario -
Construction of 400 Squadron Transition Infrastructure (H-18), CFB Borden
Canadian Forces Base Borden -
Standing Offer for General Construction at CFB Borden, Ontario
Canadian Forces Base Borden -
Construction of a Winter Maintenance Yard, Canadian Forces Base (CFB) Borden
CFB Borden (the Site). The Site is located approximately 3 km southwest of Angus, ON. -
Fire Pump and Generator Replacement at John Weir Foote Armoury
John Weir Foote Armoury, 200 James Street North in Hamilton -
Paudash Street Reconstruction
Hiawatha -
Hiawatha First Nation Water Systems Upgrade
Hiawatha First Nation -
Beaver Creek Institution - New/Existing Pump Station Upgrade
Beaver Creek -
Private Landowner Shoreline stabilization, Trent-Severn Waterway, Shoreline Works Permit 190274
Trent-Severn Waterway National Historic Site -
Town of Shelburne Long-Term Well Project
Shelburne -
Eastern Mainline Project
Cobourg -
Bobcaygeon Beach Park Redevelopment, Trent Severn Waterway, Bobcaygeon
Bobcaygeon -
1965 Pinehurst Ave., Selwyn, Upper Chemong Lake - Wet Slip Infill
Trent-Severn Waterway National Historic Site -
TSW Water Soldier Herbicide Control 2020
Trent-Severn Waterway National Historic Site -
Docks, Hasting Village Marina North and South Side
Hastings Village Marina -
Couchiching Lock 42 and Bridge 56 Rehabilitation
Trent-Severn Waterway National Historic Site -
Private Landowner Shoreline stabilization, Shore wall, Trent-Severn Waterway, Shoreline Works Permit 200013
Trent-Severn Waterway National Historic Site -
Burleigh Falls Dam Replacement, Trent-Severn Waterway
Trent-Severn Waterway National Historic Site -
Warkworth Institution - Wastewater Treatment System- Pipe Cleaning and Replacement
Warkworth Institution -
Six Nations of the Grand River Territory - Bridge #7 Replacement
Six Nations of the Grand River -
Lighting and Pathway Upgrades
Woodside National Historic Site -
Dockside Dredge Trent-Severn In-Water and Shoreline Works Permit 190113
Trent-Severn Waterway National Historic Site -
Nappan Island Bridge Replacement, Municipality of Trent Hills
Municipality of Trent Hills -
Trans Northern Pipelines Inc. (TNPI) Trent River Crossing Repair
Trent-Severn Waterway National Historic Site -
Remediate Boxcar Road Culvert at 8 Wing Trenton
Boxcar Road, 8 Wing Trenton Ontario -
Reconfigure South Side Entrance at 8 Wing Trenton, Trenton Ontario
Anson Ave, 8 Wing Trenton from Old Highway 2, Quinte West to Yukon St, 8 Wing Trenton -
Impeed the Reed
Georgian Bay Islands National Park -
Bala North Dam Waterpower, Lake Muskoka, Township of Muskoka Lakes
Bala -
Upgrading of Roadways in Beausoleil First Nation
Beausoleil First Nation Reserve -
Port Dover Search and Rescue Station Floating Dock Repairs
Port Dover -
Fisheries Habitat Construction at Big Island Marsh
Trent-Severn Waterway National Historic Site -
Mohawks of the Bay of Quinte Remedial Action Plan
Parcel 5A/C -
Mohawks of the Bay of Quinte Remedial Action Plan
Parcel 12 -
Mohawks of the Bay of Quinte Remedial Action Plan
Parcel 10 -
Mohawks of the Bay of Quinte Remedial Action Plan
Parcel 1 -
Eastern Mainline Project
Belleville -
Reconstruction of a Section of York Road and Rehabilitation of the Mud Creek Bridge
Reconstruction of a Section of York Road and Rehabilitation of the Mud Creek Bridge -
Mohawks of the Bay of Quinte First Nation - Watermain Extension Phase III
Mohawks of the Bay of Quinte First Nation, Ontario -
Mohawks of the Bay of Quinte - Elder and Disabled Care Home Construction
Mohawks of the Bay of Quinte First Nation -
10th Street Bridge Reconstruction, Owen Sound
Owen Sound -
Replacement of Big Creek Bridge on Long Point Causeway
Replacement of Big Creek Bridge on Long Point Causeway -
Potable Water Well Installation; private residence well.
Public Port of Owen Sound -
Napanee Generating Station Project
13 kilometres south of Napanee -
Canadian Coast Guard Parry Sound Base Helipad Area Repair Project
Parry Sound -
Dock Removal - Georgian Bay Islands National Park
Georgian Bay Islands National Park -
Chippewas of Nawash First Nation Water System Upgrades
Chippewas of Nawash -
Reconstruction of Nawash Unceded First Nation Roads and Culverts
Neyaashiinigmiig