Glen Rouge Campground Revitalization
The broader objective of this project is the full scale revitalization of the Glen Rouge Campground including all utility infrastructure and amenities within the existing campground footprint with intended increased service offers. The project will also involve consideration of interpretation programs as well as with facilities for interpretation within the campground, trail head, interpretation and basic orientation information facilities external to the campground. Given the broader objective, the specific objectives of the project will include: Recapitalize existing public washroom/shower facility, recapitalize existing staircase access to washroom/shower facility to improve visitor safety, replace or recapitalize campground gatehouse within existing footprint to improve operational functionality and security, recapitalize existing storage/maintenance facility and immediate surrounding area, reorient boundaries and layout of individual campsites to improve demarcation with renewed ID posts, fire pits, picnic tables, etc., addition of temporary crush gravel parking spaces near temporary accessible washroom unit and visitor reception kiosk within campground interior.
Disclaimer
This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.
Latest update
Key documents
Document Number | Document Title | File | Date |
---|---|---|---|
1 | New project being assessed by Parks Canada - Public comments invited from 13 November to 13 December 2020 | - | November 13, 2020 |
List all records
Contacts
Rouge National Urban Park105 Guildwood Parkway
PO Box 11024
Toronto, Ontario M1E 1N0
Telephone: 416-264-2020
Fax: 416-264-2167
Email: pc.rouge.pc@canada.ca
-
Location
- Rouge National Urban Park (Ontario)
-
Project Type
- Building and Property Development
- Recreation and Tourism
-
Status
In progress -
Start Date
2020-11-13 -
Proponent
Parks Canada -
Authorities
- Parks Canada Agency
-
Assessment Type
Project on federal lands -
Reference Number
81140
Nearby projects
..within 200 kilometres-
Beach and Boardwalk to 401
Detailed Impact Assessment, Rouge National Urban Park -
Pre-Fabricated Office Installation
Rouge National Urban Park -
Trans Northern Pipeline Integrity Digs
Rouge National Urban Park -
Municipal Water Infrastructure, City of Pickering Zone 4 and 5
City of Pickering -
Wheelhouse Marine Supply, Brougham, Ontario
Brougham, Ontario -
Agricultural Drainage System Expansion, Pickering Township Concession 7, Lot 19-22
City of Pickering -
Deer Exclusion Fencing
Rouge National Urban Park -
Boyles Cemetery to Bob Hunter Trail Construction
Rouge National Urban Park -
Septic System Replacements
Rouge National Urban Park -
Eastern Mainline Project
Markham -
Removal of two underground concrete tanks
Oshawa -
Port of Oshawa Salt Terminal
Oshawa -
Eastern Mainline Project
Bowmanville -
Refurbishment and Continued Operation of the Darlington Nuclear Generating Station
Darlington -
Keswick Post Office Site Remediation
Keswick -
Pefferlaw Small Craft Harbour Tree & Brush Removal
Pefferlaw -
Junior Commissariat Officers' Quarters - Recapitalization Project
Niagara National Historic Sites -
Port Weller Water Level Gauge Station Shoreline Reinforcement Project
St. Catharines -
The Proposal by Cameco Corporation for the Redevelopment of its Port Hope Conversion Facility (Vision 2010)
Port Hope -
Dalhousie Yacht Club - Travel Lift
Dalhousie Yacht Club, Port Dalhousie, ON -
Milton Logistics Hub Project
Milton -
Trent-Severn Waterway Durham Regional Road 50 Bridge
Trent-Severn Waterway National Historic Site -
Installation of Beaver Baffles in Range and Training Area B2, at Canadian Forces Base Borden
Canadian Forces Base Borden -
Reid Road Reservoir Quarry Project
Milton -
Boat Slip Sediment Remediation Project
Hamilton Harbour -
Grey and Simcoe Foresters Storage Compound Building, Borden - Ontario
Canadian Forces Base Borden -
Construction and Operation of a Transition Centre at CFB Borden, Ontario
Canadian Forces Base Borden -
Construction of 400 Squadron Transition Infrastructure (H-18), CFB Borden
Canadian Forces Base Borden -
Soil Remediation at CFB Borden Firefighter Training Area
CFB Borden Firefighter Training Area which is approximately 3.6 km southeast of Lisle, Ontario -
Standing Offer for General Construction at CFB Borden, Ontario
Canadian Forces Base Borden -
Randle Reef Contaminated Sediment Remediation Project
Hamilton Harbour -
Construction of a Winter Maintenance Yard, Canadian Forces Base (CFB) Borden
CFB Borden (the Site). The Site is located approximately 3 km southwest of Angus, ON. -
Fire Pump and Generator Replacement at John Weir Foote Armoury
John Weir Foote Armoury, 200 James Street North in Hamilton -
Beaver Creek Institution - New/Existing Pump Station Upgrade
Beaver Creek -
Paudash Street Reconstruction
Hiawatha -
Hiawatha First Nation Water Systems Upgrade
Hiawatha First Nation -
Town of Shelburne Long-Term Well Project
Shelburne -
Private Landowner Shoreline stabilization, Trent-Severn Waterway, Shoreline Works Permit 190274
Trent-Severn Waterway National Historic Site -
Bobcaygeon Beach Park Redevelopment, Trent Severn Waterway, Bobcaygeon
Bobcaygeon -
Eastern Mainline Project
Cobourg -
1965 Pinehurst Ave., Selwyn, Upper Chemong Lake - Wet Slip Infill
Trent-Severn Waterway National Historic Site -
TSW Water Soldier Herbicide Control 2020
Trent-Severn Waterway National Historic Site -
Couchiching Lock 42 and Bridge 56 Rehabilitation
Trent-Severn Waterway National Historic Site -
Docks, Hasting Village Marina North and South Side
Hastings Village Marina -
Private Landowner Shoreline stabilization, Shore wall, Trent-Severn Waterway, Shoreline Works Permit 200013
Trent-Severn Waterway National Historic Site -
Burleigh Falls Dam Replacement, Trent-Severn Waterway
Trent-Severn Waterway National Historic Site -
Lighting and Pathway Upgrades
Woodside National Historic Site -
Six Nations of the Grand River Territory - Bridge #7 Replacement
Six Nations of the Grand River -
Dockside Dredge Trent-Severn In-Water and Shoreline Works Permit 190113
Trent-Severn Waterway National Historic Site -
Warkworth Institution - Wastewater Treatment System- Pipe Cleaning and Replacement
Warkworth Institution -
Nappan Island Bridge Replacement, Municipality of Trent Hills
Municipality of Trent Hills -
Trans Northern Pipelines Inc. (TNPI) Trent River Crossing Repair
Trent-Severn Waterway National Historic Site -
Impeed the Reed
Georgian Bay Islands National Park -
Remediate Boxcar Road Culvert at 8 Wing Trenton
Boxcar Road, 8 Wing Trenton Ontario -
Reconfigure South Side Entrance at 8 Wing Trenton, Trenton Ontario
Anson Ave, 8 Wing Trenton from Old Highway 2, Quinte West to Yukon St, 8 Wing Trenton -
Bala North Dam Waterpower, Lake Muskoka, Township of Muskoka Lakes
Bala -
Upgrading of Roadways in Beausoleil First Nation
Beausoleil First Nation Reserve -
Port Dover Search and Rescue Station Floating Dock Repairs
Port Dover -
Fisheries Habitat Construction at Big Island Marsh
Trent-Severn Waterway National Historic Site -
Mohawks of the Bay of Quinte Remedial Action Plan
Parcel 5A/C -
Mohawks of the Bay of Quinte Remedial Action Plan
Parcel 12 -
Mohawks of the Bay of Quinte Remedial Action Plan
Parcel 10 -
Mohawks of the Bay of Quinte Remedial Action Plan
Parcel 1 -
Eastern Mainline Project
Belleville -
Reconstruction of a Section of York Road and Rehabilitation of the Mud Creek Bridge
Reconstruction of a Section of York Road and Rehabilitation of the Mud Creek Bridge -
Mohawks of the Bay of Quinte First Nation - Watermain Extension Phase III
Mohawks of the Bay of Quinte First Nation, Ontario -
10th Street Bridge Reconstruction, Owen Sound
Owen Sound -
Mohawks of the Bay of Quinte - Elder and Disabled Care Home Construction
Mohawks of the Bay of Quinte First Nation -
Potable Water Well Installation; private residence well.
Public Port of Owen Sound -
Replacement of Big Creek Bridge on Long Point Causeway
Replacement of Big Creek Bridge on Long Point Causeway -
Canadian Coast Guard Parry Sound Base Helipad Area Repair Project
Parry Sound -
Napanee Generating Station Project
13 kilometres south of Napanee -
Dock Removal - Georgian Bay Islands National Park
Georgian Bay Islands National Park -
Chippewas of Nawash First Nation Water System Upgrades
Chippewas of Nawash -
Reconstruction of Nawash Unceded First Nation Roads and Culverts
Neyaashiinigmiig -
Highway 69 Four-Laning from North of Highway 559 to North of Woods Road (Project 1)
Carling