Stormwater Drainage Associated with the Parliament Welcome Centre, Ottawa Lockstation, Ottawa Ontario

The project entails the installation of a new stormwater drain for the future Parliament Welcome Centre as part of the Center Block Rehabilitation Program. Perimeter drainage of the future below-grade building will be drained downslope to the Ottawa Lockstation where it will connect to an existing City of Ottawa manhole. The new drain will enter the lockstation property through the adjacent slope (via horizontal directional drilling), where it will enter a receiving pit with an oil and grit separator. Localized trenching will be required to install drainage pipe between the receiving pit and the discharge manhole. Associated works include re-paving the roadway and landscape reinstatement. The project will take place entirely on land and is approximately 15 m to the closest waterbody. Construction is anticipated to begin in the late fall/winter of 2024-25 with completion in spring 2025


Latest update

April 30, 2025 - The assessment decision statement has been issued to the proponent.

Participate

Contacts

Rideau Canal National Historic Site
34 Beckwith Street South
Smiths Falls, Ontario K7A 2A8
Telephone: 613-283-5170 or 1-888-773-8888
Fax: 613-283-0677
Email: rideau@pc.gc.ca


Disclaimer

This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.

  • Location

    • Rideau Canal National Historic Site of Canada (Ontario)
  • Nature of Activity

    • Water Management
  • Assessment Status

    Completed
  • Start Date

    2024-11-22
  • Proponent

    Parks Canada
  • Authorities

    • Parks Canada Agency
  • Assessment Type

    Project on federal lands
  • Reference Number

    89072