Divert Water Runoff from Downspouts - Armco Building

Remove existing eavestrough and downspout and dispose. Remove affected asphalt and dispose. Remove existing underground soil and keep a side for backfill. Supply and install new rainwater drainage system. Supply and install new geotextile membrane. Supply and install new 0-3/4" crushed stone. Supply and install SDR35 4" piping and fitting. Supply and install new heat trace base on 5W/foot and power in the building for a maximum of 60 feet. Supply and install new 6" eavestrough with 3"x3" downspout and connect to the SDR piping. Backfill the ground soil back in place. Supply and install 2" of 12.5 Level B asphalt paving. Paint the parking line as original.


Latest update

July 30, 2024 – The authorities intends to make a determination regarding whether the carrying out of the project is likely to cause significant adverse environmental effects. To help inform this determination, the authorities are inviting public comments until August 30, 2024 respecting that determination.

Participate

Key documents

Key documents
Document Number Document Title File Date
1 Divert Water Runoff from Downspouts - Armco Building - July 31, 2024

Contacts

Environment, Health and Safety
Public Services and Procurement Canada
11 Laurier Street
Portage III, Place du Portage
Gatineau, Quebec K1A 0S5
Email: TPSGC.RCNLVEEListedeControle-NCRECMPChecklist.PWGSC@tpsgc-pwgsc.gc.ca


  • Location

    • Armco Building (Ontario)
  • Nature of Activity

    • Water Management
  • Assessment Status

    In progress
  • Start Date

    2024-07-30
  • Proponent

    PSPC
  • Authorities

    • Natural Resources Canada
  • Assessment Type

    Project on federal lands
  • Reference Number

    88776