Alexandra Bridge Replacement Project

Public Services and Procurement Canada, in collaboration with the National Capital Commission, is proposing the construction and operation, including maintenance of an interprovincial bridge that would span the Ottawa River between Ottawa, Ontario, and Gatineau, Quebec. As proposed, the Alexandra Bridge Replacement Project would replace the existing Royal Alexandra Interprovincial Bridge that connects Sussex Drive and Des Allumettières Boulevard with a new three-lane bridge. The new bridge would support vehicular traffic (two lanes) and active transportation (one lane).


Disclaimer

This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.

 

Latest update

June 7, 2022 — The Impact Assessment Agency of Canada has suspended the timeline for the impact assessment at the request of the proponent.

Participate

Key documents

Key documents
Document Number Document Title File Date
46 Notice Time Limit Suspension with Reasons - June 7, 2022
45 Summary of Issues PDF (585 KB) May 4, 2022
3 Initial Project Description of a Designated Project - March 24, 2022
2 Summary of an Initial Project Description of a Designated Project PDF (2.9 MB) March 24, 2022

Contacts

Alexandra Bridge Replacement Project
Impact Assessment Agency of Canada
600-55 York Street
Toronto, Ontario M5J 1R7
Telephone: 416-952-1576
Email: Alexandra@iaac-aeic.gc.ca


  • Location

    • Spans the Ottawa River between Gatineau (Quebec) and Ottawa (Ontario)
  • Nature of Activity

    • Bridges
  • Assessment Status

    Suspended
  • Start Date

    2022-03-24
  • Proponent

    Public Services and Procurement Canada, in collaboration with the National Capital Commission
  • Authorities

    • Impact Assessment Agency of Canada
  • Assessment Type

    Planning Phase for Impact Assessment
  • Reference Number

    83444

Nearby assessments

..within 200 kilometres
Date modified: