Alexandra Bridge Replacement Project

Comment Search Mobile

Comment Search

Skip to filters

74 results

Attachment From the Ministry of Heritage, Sport, Tourism and Culture Industries to the Impact Assessment Agency of Canada - Provincial Regulator Advice Record for the Designation Request for the Alexandra Bridge Replacement Project

  • Alexandra Bridge Replacement Project
  • Author: Administrator on behalf of Ministry of Heritage, Sport, Tourism and Culture Industries
  • Reference number: 39
  • Submitted: 2022-04-26
  • Project phase: Planning
  • Participation notice: Public Notice - Public Comments Invited on a Summary of the Initial Project Description
  • Please see the attached submission.
  • Attachment included
  • Alexandra Bridge Replacement Project Page 1 of 2 CIAR reference number: 83444 Provincial Advice Record – Information to Inform the Summary of Issues Project: Alexandra Bridge Replacement Project Proponent: Public Services and Procurement Canada and National Capital Commission CIAR No.: 83444 Response invited by: April 24, 2022 All comments should be submitted via the Submit a Comment feature available on the Project’s Canadian Impact Assessment Registry page (Reference 83444 at http://iaac- aeic.gc.ca/050/evaluations/proj/83444?culture=en-CA). Letters and forms can be uploaded using this feature. If you have any difficulties submitting this way, please contact the Agency at Alexandra@iaac-aeic.gc.ca. 1. Confirm whether your ministry or agency would like to participate in the federal impact assessment process for this Project. X Yes No If yes, please provide contact details for the person(s) who will be working with the Agency. Ministry/Agency: Ministry of Heritage, Sport, Tourism and Culture Industries (Tourism Policy & Research Branch) Primary Contact Details: Contact Name: James Antler Telephone: 705-493-0880 Address: 447 McKeown Avenue, Ste 203, North Bay, ON P1B 9S9 Fax: N/A Email: james.antler@ontario.ca Alternate Contact Details (if applicable): Contact Name: Telephone: Address: Fax: Email: 2. Identify your ministry’s contact information for the public. This could be a generic email box or specific to your ministry’s role on the project (e.g. permits, authorizations, guidance or funding within your ministry’s mandate.) The above is the primary contact from a tourism policy perspective. Culture staff have provided information separately as it ...

Report

Attachment From Employment and Social Development Canada to the Impact Assessment Agency of Canada - Review Table for the Alexandra Bridge Replacement Project

  • Alexandra Bridge Replacement Project
  • Author: Administrator on behalf of Employment and Social Development Canada
  • Reference number: 33
  • Submitted: 2022-04-26
  • Project phase: Planning
  • Participation notice: Public Notice - Public Comments Invited on a Summary of the Initial Project Description
  • Please see the attached submission.
  • Attachment included
  • Enclosure 3: Review Table for the for Alexandra Bridge Replacement Project - Initial Project Description (IPD) IPD submitted on March 15, 2022, by Public Services and Procurement Canada and National Capital Commission (the Proponent). Please use this document to provide comments on the Alexandra Bridge Replacement Project (the Project). The document consists of two tables. Table 1 will enable you to describe potential project effects.1 The Impact Assessment Agency of Canada (the Agency) requires detailed advice to inform the Summary of Issues provided to the Proponent pursuant to subsection 14(1) of the Impact Assessment Act (IAA). Please refer to prompts in the table to guide your responses. Table 2 will facilitate the collection of general or editorial comments. Table 1: Description of the potential effects of the Project 1 effects in this context means changes to the environment or to health, social or economic conditions and the positive and negative consequences of these changes. Comment ID Document Reference Valued Compone nt Project Component Description of the Potential Effect (Context and Rationale) Powers, Duties and Functions Risk Charac terizati on Rating Instructions to the Proponent Summary of the Issue Organizati on and comment number. (e.g. title, section, subheading, page number). Identify the valued component(s) —within the mandate of your department, ministry or agency—to which the effect applies. If applicable, please indicate the project component that could cause the described effect. If the effect is linked to a power, duty or function, ...

Report

Attachment From Algonquins of Pikwakanagan to the Impact Assessment Agency of Canada - Response to the Request for Input on the Alexandra Bridge Replacement Project

  • Alexandra Bridge Replacement Project
  • Author: Administrator on behalf of Algonquins of Pikwakanagan
  • Reference number: 32
  • Submitted: 2022-04-26
  • Project phase: Planning
  • Participation notice: Public Notice - Public Comments Invited on a Summary of the Initial Project Description
  • Please see the attached submission.
  • Attachment included
  • 1 AOPFN Preliminary Comments on the Initial Project Description for the Alexandra Bridge Project Algonquins of Pikwakanagan (AOPFN) provides the following comments on the Initial Project Description (IPD). AOPFN considers these comments preliminary as AOPFN has not had opportunity to resolve concerns with PSPC prior to publicly providing comment. AOPFN looks forward to further engagement with PSPC and IAAC regarding these comments. Table 1 provides a list of concerns and recommendations for information to be provided in the Detailed Project Description and or Tailored Impact Statement guidelines and Table 2 provides information regarding initial concerns with the Project based on information received to-date. Table 1 AOPFN comments on the IPD including recommendations for the DPD and/or TISG Comment # IPD Reference Concern AOPFN Recommendation 1 Project Description Part A, Section 1 p. 2 PSPC on this page and throughout the document refers to ‘Indigenous Partners’. AOPFN requests in future all reference to Indigenous Partners be removed in future documents and be replaced with “Affected Indigenous Nations” – while participating in the impact assessment AOPFN has not provided Free, Prior, and Informed Consent to the Project and should not be considered a “Partner” 2 Project Description Part A, Section 4.7, Table 4-2, p. 65 AOPFN is concerned that Indigenous Participation in Bridge alignment and alternative means assessment is not explicitly included as part of future engagement activities. AOPFN Algonquin Knowledge must inform the development of criteria and weighting for the selection process for bridge alignment. AOPFN requires participation in the ...

Report

Attachment MHSTCI Comments - IDP

  • Alexandra Bridge Replacement Project
  • Author: Ministry of Heritage, Sport, Tourism and Culture Industries submitted by Jack Mallon
  • Reference number: 30
  • Submitted: 2022-04-25 - 11:54 AM
  • Project phase: Planning
  • Please see attached letter. 
  • Attachment included
  • Alexandra Bridge Replacement Project Page 1 of 5 CIAR reference number: 83444 Provincial Advice Record – Information to Inform the Summary of Issues Project: Alexandra Bridge Replacement Project Proponent: Public Services and Procurement Canada and National Capital Commission CIAR No.: 83444 Response invited by: April 24, 2022 All comments should be submitted via the Submit a Comment feature available on the Project’s Canadian Impact Assessment Registry page (Reference 83444 at http://iaac- aeic.gc.ca/050/evaluations/proj/83444?culture=en-CA). Letters and forms can be uploaded using this feature. If you have any difficulties submitting this way, please contact the Agency at Alexandra@iaac-aeic.gc.ca. 1. Confirm whether your ministry or agency would like to participate in the federal impact assessment process for this Project. Yes No If yes, please provide contact details for the person(s) who will be working with the Agency. Ministry/Agency: Ministry of Heritage, Sport, Tourism and Culture Industries (MHSTCI) Primary Contact Details: Contact Name: Jack Mallon Telephone: 437-522-6582 Address: 400 University Ave, 5th Floor - Toronto, ON Fax: Email: jack.mallon@ontario.ca Alternate Contact Details (if applicable): Contact Name: Karla Barboza Telephone: 416-660-1027 Address: 400 University Ave, 5th Floor - Toronto, ON Fax: Email: karla.barboza@ontario.ca Contact Name: James Hamilton Telephone: 416-995-8404 Address: 400 University Ave, 5th Floor - Toronto, ON Email: james.hamilton@ontario.ca 2. Identify your ministry’s contact information for the public. This could be a generic email box or specific to your ministry’s role on the project (e.g. permits, ...

Report

Attachment From Kebaowek First Nation to the Impact Assessment Agency of Canada - Response to the Request for Input on the Alexandra Bridge Replacement Project

  • Alexandra Bridge Replacement Project
  • Author: Administrator on behalf of Kebaowek First Nation
  • Reference number: 34
  • Submitted: 2022-04-25
  • Project phase: Planning
  • Participation notice: Public Notice - Public Comments Invited on a Summary of the Initial Project Description
  • Please see the attached submissions.
  • Attachment included
  • KEBAOWEK FIRST NATION 110 OGIMA STREET KEBAOWEK (QUEBEC) J0Z 3R1 TEL: (819) 627-3455 FAX: (819) 627-9428 April 24, 2022 Dietrich Maahs Project Analyst, Ontario Region Impact Assessment Agency of Canada 160 Elgin Street, 22nd floor Ottawa, Ontario K1A 0H3 Via email: Dietrich.Maahs@iaac-aeic.gc.ca Re: Comments on the Draft Initial Project Description – Alexandra Bridge Replacement Project Dear Mr. Maahs, This report is submitted by the Algonquin First Nation of Kebaowek in response to the Initial Project Description of the Alexandra Bridge Designated Project (IPD) released by the Impact Assessment Agency of Canada (IAAC) on March 24, 2022. Please find our comments on the document attached for your review and development into the Summary of Issues. Kebaowek First Nation recommends a full environmental assessment be undertaken for this project. Kebaowek First Nation along with the Algonquin Anishinaabeg Nation asserts and exercise authority, jurisdiction and stewardship over the Ottawa River watershed and lands threatened by the proposed project. We do not consent to the Algonquin’s of Ontario involvement in the project assessment. We along with Wolf Lake First Nation and Temiskaming First Nation have raised these concerns with Minister Gilbeault in a letter sent March 24, 2022 and are awaiting his response. Related Kebaowek has both verbally and in writing on numerous occasions requested that the Impact Assessment Act 2019 (IAA) responds immediately to the realities of our Algonquin jurisdiction being acknowledged within the ...
  • Attachment included
  • Summary of Kebaowek First Nation Key Interests and Concerns with the Alexandra Bridge Replacement Project Initial Project Description Topic Project Aspects of Interest/Concern Specific feedback provided by Kebaowek on this interest/concern Response to the interest/concern by PSPC and NCC Status of the Concern Consultation Engagement with Indigenous Partners Meaningful Indigenous participation and adequate Crown consultation in environmental assessments for the Alexandra Bridge Replacement Project October 30, 2020 KFN receives letter request from Alana Jorgensen (PSPC) and Luc Fournier (NCC) requesting how KFN would like to be engaged and consulted. KFN responds November 24, 2020 “We would like to be engaged through a fully resourced Letter of Intent (LOI) that would guide the development of “proponent process agreement(s) modeled after the PSPC-TDQRP project.” KFN requests confidentiality agreement be signed by PSPC to share existing KFN agreement templates. AANTC requires mandate and resolution from Chiefs to enter into funding arrangements representing community rights holders in the consultation. PSPC-NCC Response: No response from PSPC and NCC between November 24, 2020 and December 15, 2021 where KFN raises the LOI and Process Agreement / Confidentiality Agreement request subject in zoom meeting organized by PSPC and NCC. January 20, 2022 PSPC and NCC provide letter request to KFN for feedback ...

Report

Attachment From Nation Huronne-Wendat to the Impact Assessment Agency of Canada - Response to the Request for Input on the Alexandra Bridge Replacement Project

  • Alexandra Bridge Replacement Project
  • Author: Administrator on behalf of Nation Huronne-Wendat
  • Reference number: 35
  • Submitted: 2022-04-25
  • Project phase: Planning
  • Participation notice: Public Notice - Public Comments Invited on a Summary of the Initial Project Description
  • Veuillez consulter la pièce jointe.
  • Attachment included
  • 255, Place Chef Michel-Laveau, Wendake (Québec) G0A 4V0 Canada Téléphone : (418) 843-3767 Télécopieur : (418) 842-1108 Sans frais : 1-877-712-3767 Wendake, le 25 avril 2022 Anjala Puvananathan Directrice Région de l’Ontario Agence d’évaluation d’impact du Canada 600-55, rue York Toronto (Ontario) M5J 1R7 Objet: Projet de remplacement du pont Alexandra – Examen de la description initiale de projet Madame Puvananathan, La présente concerne l’objet en titre et fait suite à la lettre que vous avez adressée au Grand Chef de la Nation huronne-wendat, Monsieur Rémy Vincent, le 24 mars 2022. Tout d’abord, nous vous réitérons que le gouvernement du Canada est tenu de consulter les Autochtones, et donc notre Nation, sur l’ensemble du Nionwentsïo, lorsqu’il y a modification ou adoption d’un projet de loi, de règlement ou de politique, de même en ce qui concerne les projets de planification, d’aménagement, de développement et d’émission de baux sur le territoire, ou l’adoption de toute autre mesure susceptible d’avoir des effets sur nos droits et intérêts, et ce, tout au long du processus concerné. Cette obligation découle de plusieurs jugements de la Cour suprême du Canada en matière de consultation, tels Haïda, Taku River et Mikisew. En ce qui concerne le pont Alexandra, il s’agit d’un projet situé à l’ouest du Nionwentsïo, soit le territoire coutumier de la Nation huronne-wendat rattaché au Traité Huron-Britannique de 1760, mais localisé sur le territoire ancestral de la Nation en Ontario, appelé Wendake Sud. Le projet est donc susceptible d’avoir des impacts sur les droits, activités et intérêts de la Nation. Le Bureau du Nionwentsïo porte un grand ...

Report

Attachment From Canadian Heritage to the Impact Assessment Agency of Canada - Federal Authority Advice Record and Review Table for the Alexandra Bridge Replacement Project

  • Alexandra Bridge Replacement Project
  • Author: Administrator on behalf of Canadian Heritage
  • Reference number: 43
  • Submitted: 2022-04-25
  • Project phase: Planning
  • Participation notice: Public Notice - Public Comments Invited on a Summary of the Initial Project Description
  • Please see the attached submission.
  • Attachment included
  • Enclosure 3: Review Table for the for Alexandra Bridge Replacement Project - Initial Project Description (IPD) IPD submitted on March 15, 2022, by Public Services and Procurement Canada and National Capital Commission (the Proponent). Response due by: April 18, 2022. Please use this document to provide comments on the Alexandra Bridge Replacement Project (the Project). The document consists of two tables. Table 1 will enable you to describe potential project effects.1 The Impact Assessment Agency of Canada (the Agency) requires detailed advice to inform the Summary of Issues provided to the Proponent pursuant to subsection 14(1) of the Impact Assessment Act (IAA). Please refer to prompts in the table to guide your responses. Table 2 will facilitate the collection of general or editorial comments. Table 1: Description of the potential effects of the Project 1 effects in this context means changes to the environment or to health, social or economic conditions and the positive and negative consequences of these changes. Comment ID Document Reference Valued Component Project Component Description of the Potential Effect (Context and Rationale) Powers, Duties and Functions Risk Characterization Rating Instructions to the Proponent Summary of the Issue Please identify comments by organization and comment number. If the comment is related to a specific section of the documentation, please provide a reference (e.g. title, section, subheading, page number). You may also choose to copy the relevant text here. Identify the valued component(s)— within the mandate of your department, ministry ...
  • Attachment included
  • Alexandra Bridge Replacement Project Page 1 of 2 CIAR reference number: 83444 Enclosure 1: Federal Authority Advice Record: Authority and Summary of Issues Project: Alexandra Bridge Replacement Project Proponent: Public Services and Procurement Canada and National Capital Commission CIAR No.: 83444 Part A - Summary of Issues, Permitting Plan and Tailored Impact Statement Guidelines Response due by: April 18, 2022 All comments should be submitted via the Submit a Comment feature available on the Project’s Canadian Impact Assessment Registry page (Reference 83444 at http://iaac-aeic.gc.ca/050/evaluations/proj/83444?culture=en-CA. Letters and forms can be uploaded using this feature. If you have any difficulties submitting this way, please contact the Agency at Alexandra@iaac- aeic.gc.ca for assistance. Department/Agency: PCH (Dept of Canadian Heritage) Primary Contact Details: Contact Name: John Ward Telephone: Address: 1030 Innes Road, Ottawa, ON Fax: Email: john.ward@pch.gc.ca Alternate Contact Details (if applicable): Contact Name: Paul Marcon Telephone: Address: 1030 Innes Road, Ottawa, ON Fax: Email: paul.marcon@pch.gc.ca 1. Identify and describe the specialist or expert information or knowledge within your department or agency that would be relevant to the conduct of the impact assessment of the Project, should a federal impact assessment be required. John Ward, Preservation Development Advisor: Trained as a conservation architect, experienced in advising on the conservation of federal built heritage in Ottawa, Parliament Hill, Judicial Precinct, conservation and relocation of monuments in downtown Ottawa. Paul Marcon, Civil Engineer-Scientist: Trained as a civil ...

Report

Attachment From Women and Gender Equality Canada to the Impact Assessment Agency of Canada - Federal Authority Advice Record and Review Table for the Alexandra Bridge Replacement Project

  • Alexandra Bridge Replacement Project
  • Author: Administrator on behalf of Women and Gender Equality Canada
  • Reference number: 36
  • Submitted: 2022-04-25
  • Project phase: Planning
  • Participation notice: Public Notice - Public Comments Invited on a Summary of the Initial Project Description
  • Please see the attached submission.
  • Attachment included
  • Enclosure 3: Review Table for the for Alexandra Bridge Replacement Project - Initial Project Description (IPD) IPD submitted on March 15, 2022, by Public Services and Procurement Canada and National Capital Commission (the Proponent). Response due by: April 18, 2022. Please use this document to provide comments on the Alexandra Bridge Replacement Project (the Project). The document consists of two tables. Table 1 will enable you to describe potential project effects.1 The Impact Assessment Agency of Canada (the Agency) requires detailed advice to inform the Summary of Issues provided to the Proponent pursuant to subsection 14(1) of the Impact Assessment Act (IAA). Please refer to prompts in the table to guide your responses. Table 2 will facilitate the collection of general or editorial comments. Table 1: Description of the potential effects of the Project 1 effects in this context means changes to the environment or to health, social or economic conditions and the positive and negative consequences of these changes. Comment ID Document Reference Valued Component Project Component Description of the Potential Effect (Context and Rationale) Powers, Duties and Functions Risk Characterization Rating Instructions to the Proponent Summary of the Issue Please identify comments by organization and comment number. If the comment is related to a specific section of the documentation, please provide a reference (e.g. title, section, subheading, page number). You may also choose to copy the relevant text here. Identify the valued component(s)— within the mandate of your department, ministry ...
  • Attachment included
  • Alexandra Bridge Replacement Project Page 1 of 6 CIAR reference number: 83444 Enclosure 1: Federal Authority Advice Record: Authority and Summary of Issues Project: Alexandra Bridge Replacement Project Proponent: Public Services and Procurement Canada and National Capital Commission CIAR No.: 83444 Part A - Summary of Issues, Permitting Plan and Tailored Impact Statement Guidelines Response due by: April 18, 2022 All comments should be submitted via the Submit a Comment feature available on the Project’s Canadian Impact Assessment Registry page (Reference 83444 at http://iaac-aeic.gc.ca/050/evaluations/proj/83444?culture=en-CA. Letters and forms can be uploaded using this feature. If you have any difficulties submitting this way, please contact the Agency at Alexandra@iaac- aeic.gc.ca for assistance. Department/Agency: Women and Gender Equality Canada Primary Contact Details: Contact Name: Denise Gareau Telephone: 419-729-6969 Address: 22 Eddy St., Gatineau QC Fax: Email: CFC.EvaluationImpacts-ImpactsAssessment.SWC@cfc-swc.gc.ca Alternate Contact Details (if applicable): Contact Name: Jessica Bialek Telephone: Address: 22 Eddy St., Gatineau QC Fax: Email: Jessica.Bialek@fegc-wage.gc.ca 1. Identify and describe the specialist or expert information or knowledge within your department or agency that would be relevant to the conduct of the impact assessment of the Project, should a federal impact assessment be required. The mandate of Women and Gender Equality Canada (WAGE) is to advance equality with respect to sex, sexual orientation, and gender identity or expression through the inclusion of people of all genders, including women, in Canada’s economic, social, and ...

Report

Attachment Alexandra Bridge Replacement Project (Reference # 83444)

  • Alexandra Bridge Replacement Project
  • Author: Transport Action Canada submitted by David Jeanes
  • Reference number: 27
  • Submitted: 2022-04-24 - 9:37 PM
  • Project phase: Planning
  • Participation notice: Public Notice - Public Comments Invited on a Summary of the Initial Project Description
  • Transport Action Canada's comments on the Alexandra Bridge Replacement Project and the opportunity to rehabilitate the existing bridge as a green active transportation facility are attached.
  • Attachment included
  • CP/Box 858, Station B Ottawa, ON K1P 5P9 Tel: 613-594-3290 TRANSPORT ACTION CANADA info@transportaction.ca www.transportaction.ca formerly/anciennement TRANSPORT 2000 CANADA April 24, 2022 e-mail to: Impact Assessment Agency of Canada 22nd Floor, Place Bell 160 Elgin St. Ottawa ON K1A 0H3 Subject: Alexandra Bridge Replacement Project (Reference # 83444) Dear Agency Members: Transport Action Canada is a national advocacy group for promoting public transportation. It was founded in 1976 and is a federal not-for-profit corporation and a registered charity. We have participated extensively in consultation processes related to the Alexandra Bridge and other capital transportation planning subjects for many years. Transport Action Canada is a member of the Alexandra Bridge Coalition. We are pleased to respond to the Impact Assessment Agency of Canada's request for comment with respect to the Alexandra Bridge Replacement Project (reference # 83444), being undertaken by Public Services & Procurement Canada (PSPC) in collaboration with the National Capital Commission. We were glad to hear recently that PSPC has re-examined the possibility of rehabilitating the existing bridge as a green transportation facility; even though they still conclude that this is not feasible. The usage statistics show how important this bridge is for pedestrian and cycling access, and how relatively unimportant for car use, carrying only 9% of the cross-river road traffic. The load limits and the extended road closures, while preserving pedestrian and cycling use, have shown the potential for this as a permanent role for the bridge. The centre ...

Report

Attachment Comment Form - Information to Inform the Summary of Issues - Alexandra Bridge - IPD

  • Alexandra Bridge Replacement Project
  • Author: City of Ottawa submitted by Elizabeth Murphy
  • Reference number: 25
  • Submitted: 2022-04-24 - 7:15 PM
  • Project phase: Planning
  • Participation notice: Public Notice - Public Comments Invited on a Summary of the Initial Project Description
  • To Whom It May Concern,  Please see the attached Comment Form  - Infromation to Inform the Summary of Issues for the Alexandra Bridge Project - IPD on behalf of the City of Ottawa.   Sincerely,     Elizabeth Murphy, P.Eng., Program Manager of Transportation Engineering Services City of Ottawa, Planning, Real Estate and Economic Development Deparment cell number:  613 355 8465 email:  Elizabeth.Murphy@ottawa.ca  
  • Attachment included
  • Alexandra Bridge Replacement Project Page 1 of 5 CIAR reference number: 83444 Comment Form – Information to inform the Summary of Issues Project: Alexandra Bridge Replacement Project Proponent: Public Services and Procurement Canada and National Capital Commission Canadian Impact Assessment Registry No.: 83444 Comment period end date: April 24, 2022 Municipality Name: City of Ottawa Primary Contact Contact Name: Jeff McEwen, P.Eng. Telephone:613 580 2424 x 16597 Address: City of Ottawa, 100 Laurier West, Ottawa, Ontario Fax (optional): Email: Jeff.McEwen@ottawa.ca Alternative Contact (optional) Contact Name: Elizabeth.Murphy, P.Eng. Telephone:613 580 2424 x 15397 Address: City of Ottawa, 100 Laurier West, Ottawa, Ontario Fax (optional): Email: Elizabeth.Murphy@ottawa.ca The Impact Assessment Agency of Canada invites your municipality to provide information it has available at this time on the Project and its potential effects or impacts (both positive and negative) to the environmental, health, social and economic conditions of your community. Your comments will inform the Summary of Issues1 with respect to the Project and will be provided to the Proponent to address. You may use this form or use another format of your choice. You may find Figure 1 on page 10 of the Summary of the Initial Project Description useful in situating the Project. All comments should be submitted via the Submit a Comment feature available on the Project’s Canadian Impact Assessment Registry page (Reference 83444 at: http://iaac-aeic.gc.ca/050/evaluations/proj/83444?culture=en-CA). Letters and forms can be uploaded using this feature. If you have any difficulties submitting this way, please ...

Report

Attachment Climate crisis makes it imperative to conserve and rehabilitate the bridge

  • Alexandra Bridge Replacement Project
  • Author: Kae Elgie
  • Reference number: 24
  • Submitted: 2022-04-24 - 3:05 PM
  • Project phase: Planning
  • Participation notice: Public Notice - Public Comments Invited on a Summary of the Initial Project Description
  • It is foolhardy to needlessly demolish structures which embody as much carbon as this bridge unless you have proved beyond all doubts there is no other alternative.  Please continue to investigate other options, as was recommended by the project proponent's own consultants (MMM 2018),  As well, in a climate crisis, with Canada's record of failing to meet all its previous carbon reduction targets, it is just UNFORGIVABLE to build a bridge which will encourage automobile traffic over other lreduced carbon or even carbon-neutral modes. We should be doing everything possible to persuade citizens to switch to carbon-neutral transportation methods.  Decades of superhighway construction shows expanding highways only invites more and more and more vehicles, the vast majoriy of which are fossil-fuel-dependent.   For the future of Canadians, please choose conservation and rehabilition, not demolition.    that recommended that additional studies be completed before a final decision is made (on whether to rehabilitate or replace the existing bridge)   The Alexandra Bridge Coalition believes that the retention and rehabilitation this iconic bridge is the best option for protecting the historic, engineering, and environmental values of the bridge, best supports the Government of Canada’s prioritization of sustainability, and represents the most effective use of public funds.

Report

Attachment Concerns regarding the impact of the Alexandra Bridge Project on the Ottawa River

  • Alexandra Bridge Replacement Project
  • Author: Ottawa Riverkeeper submitted by Laura Reinsborough
  • Reference number: 23
  • Submitted: 2022-04-24 - 8:39 AM
  • Project phase: Planning
  • Participation notice: Public Notice - Public Comments Invited on a Summary of the Initial Project Description
  • As an advocate of the protection and health of the Ottawa River watershed since 2001, Ottawa Riverkeeper would like to ensure that the impacts of the Alexandra Bridge Project are recognized and would like to suggest potential actions to be considered to mitigate any damage that may result from the activities associated with the project. The attach letter outlines these actions as well as potential opportunities to improve ecosystem health. 
  • Attachment included
  • Alexandra Bridge Replacement Project Impact Assessment Agency of Canada 600-55 York Street Toronto, Ontario M5J 1R7 April 22, 2022 Re: Alexandra Bridge Replacement Project; Reference # 83444 The Alexandra Bridge Replacement Project would replace the existing Royal Alexandra Interprovincial Bridge that crosses the Ottawa River and would connect Sussex Drive and Des Allumettières Boulevard with a new three-lane bridge. As an advocate of the protection and health of the Ottawa River watershed since 2001, Ottawa Riverkeeper would like to ensure that the impacts of the aforementioned project are recognized and would like to suggest potential actions to be considered to mitigate any damage that may result from the Alexandra Bridge Replacement Project. Ottawa Riverkeeper is a not-for-profit organization dedicated to protecting the health and future of the Ottawa River and its tributaries. We work with individuals, community groups, and all levels of government to promote river stewardship and collective action on issues that affect our ability to safely swim, drink, and fish from our local waterways. Ottawa Riverkeeper fulfils its mission by raising awareness, educating, inspiring action, disseminating science-based information, and encouraging responsible use of the Ottawa River for the enjoyment and benefit of all. The summary of the project discusses numerous measures that may be taken to address any anticipated impacts on the river. As we await the Environmental Protection Plan associated with this project, our main concerns are focused on the construction phase and the possible impacts on the water quality and aquatic species in this section of this river. Ottawa RIverkeeper believes that: ● the ...

Report

Attachment IAAC Submission - Alexandra Bridge Replacement

  • Alexandra Bridge Replacement Project
  • Author: Administrator on behalf of Heritage Ottawa
  • Reference number: 40
  • Submitted: 2022-04-24
  • Project phase: Planning
  • Participation notice: Public Notice - Public Comments Invited on a Summary of the Initial Project Description
  • Please see the attached submission.
  • Attachment included
  • April 24, 2022 Sent by e-mail to: Impact Assessment Agency of Canada 22nd Floor, Place Bell 160 Elgin St. Ottawa ON K1A 0H3 From: Heritage Ottawa, 2 Daly Avenue, Ottawa, ON K1N 6E2 Tel. 613-230-8841, e-mail: info@heritageottawa.org RE: Alexandra Bridge Replacement Project (Reference # 83444) Heritage Ottawa is pleased to respond to the Impact Assessment Agency of Canada request for comment with respect to the Alexandra Bridge Replacement Project (reference # 83444) that is being undertaken by Public Services & Procurement Canada in collaboration with the National Capital Commission It is our opinion that the rationale for the project to demolish and replace the Alexandra Bridge is fundamentally incomplete and has not reasonably assessed the option to rehabilitate the existing bridge, which would avoid the environmental, financial, heritage and social impacts of the proposed project. This position is supported by the Project Proponent’s own consultants (MMM 2018) that recommended that additional studies be completed before a final decision is made (on whether to rehabilitate or replace the existing bridge). To date, no additional studies have been made public to support the decision to demolish and replace the existing bridge. Heritage Ottawa believes that the retention and rehabilitation this iconic bridge is the best option for protecting the historic, engineering, and environmental values of the bridge, best supports the Government of Canada’s prioritization of sustainability, and represents the most effective use of public funds. We therefore recommend that a full Impact Assessment of the project take place, and ...

Report

Attachment From Timiskaming First Nation to the Impact Assessment Agency of Canada - Response to the Request for Input on the Alexandra Bridge Replacement Project

  • Alexandra Bridge Replacement Project
  • Author: Administrator on behalf of Timiskaming First Nation
  • Reference number: 38
  • Submitted: 2022-04-24
  • Project phase: Planning
  • Participation notice: Public Notice - Public Comments Invited on a Summary of the Initial Project Description
  • Please see the attached submission.
  • Attachment included
  • Band Council 24 Algonquin Avenue Tel: 819-723-2370 Timiskaming First Nation, QC Fax: 819-723-2799 J0Z3B0 NI DAKINAN Tel: 819-723-2291 13 Kateri Street Timiskaming First Nation, QC J0Z3B0 April 24, 2022 General comments from Timiskaming First Nation The Timiskaming First Nation (TFN) wants to state that participating in the process of commenting on documentation from the Impact Assessment Agency of Canada, does not mean that in any way that TFN agrees with the timeframe or budget that the Federal government has provided. Both are minimal to allow for meaningful review of the impact assessment of the Initial Project Description for the Alexandra Bridge Project. Furthermore, TFN considers the Impact Assessment process to be an information sharing process to which we can assess the project and is not yet consultation in which TFN can deem satisfactory. TIMISKAMING FIRST NATION 24, Algonquin Ave. Tel : (819) 723-2370 T.F.N Fax: (819) 723-2799 Notre Dame du Nord, QC J0Z 3B0 Ni Dakinan Tel : (705) 647-4969 #1B, 213 Whitewood Avenue New Liskeard, ON P0J 1P0 Comment Form – Information to Inform the Summary of Issues Project: Alexandra Bridge Replacement Project Proponent: Public Services and Procurement Canada and National Capital Commission CIAR No.: 83444 End of comment period: April 24, 2022 Indigenous Group Name: ...

Report

Attachment Étude d'impact complète demandée considérant l'alternative de réhabilitation du pont.

  • Alexandra Bridge Replacement Project
  • Author: Coalition pour le pont Alexandra - Alexandra Bridge Coalition submitted by Claude Royer
  • Reference number: 22
  • Submitted: 2022-04-23 - 8:52 PM
  • Project phase: Planning
  • Participation notice: Public Notice - Public Comments Invited on a Summary of the Initial Project Description
  • La Coalition pour le pont Alexandra (http://heritageottawa.ca/fr/pont-alexandra) a le plaisir de répondre à l’appel de commentaires de l’Agence d’évaluation d’impact du Canada (AEIC) sur le Projet de remplacement du pont Alexandra (référence no 83444) entrepris par Services publics et Approvisionnement Canada en collaboration avec la Commission de la Capitale nationale (ci-après nommés conjointement les Promoteurs du projet). La Coalition pour le pont Alexandra (CPA) considère que la justification de la démolition et du remplacement du pont Alexandra est incomplète et n’a pas évalué de façon satisfaisante l’option de réhabiliter le pont existant, ce qui amoindrirait les répercussions environnementales, financières, patrimoniales et sociales du projet. La position de la CPA est appuyée par les experts-conseils des Promoteurs du projet (MMM 2018) qui recommandaient que d’autres études soient faites avant qu’une décision finale soit prise sur la réhabilitation ou le remplacement du pont. Aucune nouvelle étude justifiant la démolition et le remplacement du pont n’a jusqu’à maintenant été rendue publique. La Coalition pour le pont Alexandra croit que la sauvegarde et la réhabilitation de ce pont emblématique constituent l’alternative qui préserve le mieux les valeurs historiques, techniques et environnementales du pont en plus de correspondre aux objectifs ...
  • Attachment included
  • ALEXANDRA BRIDGE COALITION | COALITION DU PONT ALEXANDRA April 24, 2022 Impact Assessment Agency of Canada 22nd Floor, Place Bell 160 Elgin St. Ottawa ON K1A 0H3 Sent by email to: RE: Alexandra Bridge Replacement Project (Reference # 83444) The Alexandra Bridge Coalition is pleased to respond to the Impact Assessment Agency of Canada request for comment with respect to the Alexandra Bridge Replacement Project (reference # 83444) that is being undertaken by Public Services & Procurement Canada in collaboration with the National Capital Commission (hereafter jointly referred to as the Project Proponents). It is the view of the Alexandra Bridge Coalition (ABC) that the rationale for the project to demolish and replace the Alexandra Bridge is fundamentally incomplete and has not reasonably assessed the option to rehabilitate the existing bridge, which would avoid the environmental, financial, heritage and social impacts of the proposed project. The ABC’s position is supported by the Project Proponent’s own consultants (MMM 2018) that recommended that additional studies be completed before a final decision is made (on whether to rehabilitate or replace the existing bridge). To date, no additional studies have been made public to support the decision to demolish and replace the existing bridge. The Alexandra Bridge Coalition believes that the retention and rehabilitation this iconic bridge is the best option for protecting the historic, engineering, and environmental values of the bridge, best supports the Government of Canada’s prioritization of sustainability, and represents the most effective use of public funds. The Alexandra Bridge Coalition therefore recommends ...

Report

Attachment Due Process Requested for Considering Alternative to Demolition

  • Alexandra Bridge Replacement Project
  • Author: Alexandra Bridge Coalition - Coalition pour le pont Alexandra submitted by Claude Royer
  • Reference number: 21
  • Submitted: 2022-04-23 - 8:40 PM
  • Project phase: Planning
  • Participation notice: Public Notice - Public Comments Invited on a Summary of the Initial Project Description
  • The Alexandra Bridge Coalition (http://heritageottawa.ca/alexandra-bridge) is pleased to respond to the Impact Assessment Agency of Canada request for comment with respect to the Alexandra Bridge Replacement Project (reference # 83444)  that is being undertaken by Public Services & Procurement Canada in collaboration with the National Capital Commission (hereafter jointly referred to as the Project Proponents). It is the view of the Alexandra Bridge Coalition (ABC) that the rationale for the project to demolish and replace the Alexandra Bridge is fundamentally incomplete and has not reasonably assessed the option to rehabilitate the existing bridge, which would avoid the environmental, financial, heritage and social impacts of the proposed project. The ABC’s position is supported by the Project Proponent’s own consultants (MMM 2018) that recommended that additional studies be completed before a final decision is made (on whether to rehabilitate or replace the existing bridge).  To date, no additional studies have been made public to support the decision to demolish and replace the existing bridge. The Alexandra Bridge Coalition believes that the retention and rehabilitation this iconic bridge is the best option for protecting the historic, engineering, and environmental values of the bridge, best supports the Government of Canada’s prioritization of sustainability, and represents the most effective use of public funds. The Alexandra Bridge Coalition therefore recommends that a full Impact Assessment of the project take place, and additionally that : the ...
  • Attachment included
  • ALEXANDRA BRIDGE COALITION | COALITION DU PONT ALEXANDRA April 24, 2022 Impact Assessment Agency of Canada 22nd Floor, Place Bell 160 Elgin St. Ottawa ON K1A 0H3 Sent by email to: RE: Alexandra Bridge Replacement Project (Reference # 83444) The Alexandra Bridge Coalition is pleased to respond to the Impact Assessment Agency of Canada request for comment with respect to the Alexandra Bridge Replacement Project (reference # 83444) that is being undertaken by Public Services & Procurement Canada in collaboration with the National Capital Commission (hereafter jointly referred to as the Project Proponents). It is the view of the Alexandra Bridge Coalition (ABC) that the rationale for the project to demolish and replace the Alexandra Bridge is fundamentally incomplete and has not reasonably assessed the option to rehabilitate the existing bridge, which would avoid the environmental, financial, heritage and social impacts of the proposed project. The ABC’s position is supported by the Project Proponent’s own consultants (MMM 2018) that recommended that additional studies be completed before a final decision is made (on whether to rehabilitate or replace the existing bridge). To date, no additional studies have been made public to support the decision to demolish and replace the existing bridge. The Alexandra Bridge Coalition believes that the retention and rehabilitation this iconic bridge is the best option for protecting the historic, engineering, and environmental values of the bridge, best supports the Government of Canada’s prioritization of sustainability, and represents the most effective use of public funds. The Alexandra Bridge Coalition therefore recommends ...

Report

Attachment Preserve and rehabilitate the bridge

  • Alexandra Bridge Replacement Project
  • Author: James Maddigan
  • Reference number: 20
  • Submitted: 2022-04-23 - 5:13 PM
  • Project phase: Planning
  • Participation notice: Public Notice - Public Comments Invited on a Summary of the Initial Project Description
  • The Alexandra Bridge should be preserved and rehabilitated for continued use as it is a significant piece of national engineering history, and has high heritage value to the community.  The basis of the decision to replace the bridge should be reviewed given: The interest by citizens to preserve this bridge. It is part of the skyline and a feature identified with Ottawa and Gatineau, much like bridges in other cities. It is feasible to restore the bridge based on other examples of historic bridges being restored in Canada and around the world. The economic reasons and conditions for the replacement have changed since the original studies and analysis were made, where it may make more economic sense to keep the bridge. The parameters for rehabilitating this bridge can be readily determined, and a team engaged rapidly to work on it, versus the time it would take to have an international design competition, undertake the design, and build an innovative bridge design. There are risks to pursuing an innovative bridge design that may lead to longer delivery times, costs overruns, and possibly having to deal with design and construction defects that come with innovative designs. It is possible that contemporary bridge designs and materials would not last as long as the Alexandra bridge under the same use conditions, and/or failure to do regular maintenance. A rehabilitated Alexandra Bridge with improvements to details, materials and maintenance procedures could last longer, based on other historic bridges that are even older and are still in use. A Life Cycle Costing Analysis has been ...

Report

Attachment ECCC IPD Review - Alexandra Bridge Replacement Project

  • Alexandra Bridge Replacement Project
  • Author: Environment and Climate Change Canada submitted by Venita Harry
  • Reference number: 19
  • Submitted: 2022-04-22 - 11:32 AM
  • Project phase: Planning
  • Participation notice: Public Notice - Public Comments Invited on a Summary of the Initial Project Description
  • Enclosure 3 - ECCC Initial Project Description (IPD) Review -  Alexandra Bridge Replacement Project
  • Attachment included
  • Enclosure 3: Review Table for the for Alexandra Bridge Replacement Project - Initial Project Description (IPD) Proponent: Public Services and Procurement Canada and National Capital Commission Comments provided by: Environment and Climate Change Canada (ECCC) Date of Submission: April 22, 2022 Primary Contact: Venita Harry, e-mail: venita.harry@ec.gc.ca Alternate Contact: Denise Fell, e-mail: denise.fell@ec.gc.ca Table 1: Description of the potential effects of the Project Comment ID Document Reference Valued Component Project Component Description of the Potential Effect (Context and Rationale) Federal Jurisdiction Powers, Duties and Functions Instructions to the Proponent Summary of the Issue ECCC - 1 Section 14 of the Initial Project Description (IPD) states that existing conditions and predicted effects on water quality will be compared against the Canadian Council of Ministers of the Environment (CCME) Canadian Water Quality Guidelines for the protection of freshwater aquatic life (CWQG-FAL) In Section 14.1.4.2 Mitigation and Protective Measures (Pg. 133), the proponent indicated that the stormwater management system will be developed in later stages of the Project and it will include details on stormwater discharge monitoring, including location, frequency, duration, and volume, among other measures. Fish and Fish Habitat (water quality) Stormwater Management Structures The Proponent has not adequately articulated the effect of stormwater on surface water quality pertaining to stormwater management structures and Contaminants of Concern (COCs). The staging locations have not been confirmed and soil analysis has not been provided to assess ...

Report

Attachment ECCC Federal Authority Advice Record: Authority and Summary of Issues: Alexandra Bridge IPD

  • Alexandra Bridge Replacement Project
  • Author: Environment and Climate Change Canada submitted by Venita Harry
  • Reference number: 18
  • Submitted: 2022-04-22 - 11:13 AM
  • Project phase: Planning
  • Participation notice: Public Notice - Public Comments Invited on a Summary of the Initial Project Description
  • Enclosure 1 - ECCC Federal Authority Advice Record Authority and Summary of Issues: Alexandra Bridge IPD
  • Attachment included
  • Alexandra Bridge Replacement Project Page 1 of 4 CIAR reference number: 83444 Enclosure 1: Federal Authority Advice Record: Authority and Summary of Issues Project: Alexandra Bridge Replacement Project Proponent: Public Services and Procurement Canada and National Capital Commission CIAR No.: 83444 Part A - Summary of Issues, Permitting Plan and Tailored Impact Statement Guidelines Response due by: April 22, 2022 All comments should be submitted via the Submit a Comment feature available on the Project’s Canadian Impact Assessment Registry page (Reference 83444 at http://iaac-aeic.gc.ca/050/evaluations/proj/83444?culture=en-CA. Letters and forms can be uploaded using this feature. If you have any difficulties submitting this way, please contact the Agency at Alexandra@iaac- aeic.gc.ca for assistance. Department/Agency: Environment and Climate Change Canada (ECCC) Primary Contact Details: Contact Name: Venita Harry Telephone: (416) 739 - 5863 Address: 4905 Dufferin Street, Toronto ON M3H 5T4 Fax: Email: venita.harry@ec.gc.ca Alternate Contact Details (if applicable): Contact Name: Denise Fell Telephone: (647) 524 - 1207 Address: 867 Lakeshore Road, Burlington ON L7S 1A1 Fax: Email: denise.fell@ec.gc.ca 1. Identify and describe the specialist or expert information or knowledge within your department or agency that would be relevant to the conduct of the impact assessment of the Project, should a federal impact assessment be required. ECCC has specialist or expert information that may be relevant to the impact assessment in the areas listed below; in each of these subject areas we have expertise related to establishing an adequate baseline, assessing potential effects to ...

Report

Attachment Letter from the Ministère de l'Environnement et de la Lutte contre les changements climatiques related to the Alexandra Bridge Replacement Project

  • Alexandra Bridge Replacement Project
  • Author: Administrator on behalf of Ministère de l'Environnement et de la Lutte contre les changements climatiques
  • Reference number: 44
  • Submitted: 2022-04-22
  • Project phase: Planning
  • Participation notice: Public Notice - Public Comments Invited on a Summary of the Initial Project Description
  • Veuillez consulter la pièce jointe.
  • Attachment included
  • 2DLA?NDIH @A FSTP=FO=NDIH AHPDLIHHAGAHN=FA @AM JLIEANM CR@LDKOAM ,-+% >IOFAP=L@ :AHT&6TPAMKOA 3MN 9OT>A? #9OT>A?$ 4(: +<- 0;4;73652 . )&, *'&$(-((# 769:2 +'*% ;TFT?IJDAOL / *(. ,**&.))) 1IOLLDAF / 5HNALHAN / QQQ'AHPDLIHHAGAHN'BIOP'K?'?= ?[aILJ% RL ** H\XPR *(** ;UTYPL[X 1LTUdZ 3[IXL[PR 3PXLJZL[X% XaNPUT K[ ?[aILJ 0NLTJL Kga\HR[HZPUT KgPSVHJZ K[ 2HTHKH -()&),((% H\LT[L Kg4YZPSH[\PRRL ?[aILJ #?[aILJ$ 6)9 (2) ,386? # -;:? $96@2:5=2 A '6>4=7<?7;: 7:7?7296 56 <=;86? ;UTYPL[X% :H VXaYLTZL MHPZ Y[PZL ` \UZXL JUXXLYVUTKHTJL K[ *+ SHXY *(**% JUTJLXTHTZ RH KLYJXPVZPUT PTPZPHRL K[ VXUQLZ KL XLSVRHJLSLTZ K[ VUTZ 0RL]HTKXH' f RH RLJZ[XL KL RH KLYJXPVZPUT PTPZPHRL K[ VXUQLZ% PR HVVHXHdZ W[g[TL HZZLTZPUT VHXZPJ[RPbXL KL\XHPZ cZXL VUXZaL Y[X RgHJJLVZHIPRPZa YUJPHRL K[ VXUQLZ LZ RH JUTY[RZHZPUT K[ V[IRPJ% TUZHSSLTZ JUTYPKaXHTZ RgPTZaXcZ VHZXPSUTPHR LZ OPYZUXPW[L K[ VUTZ 0RL]HTKXH% YUT [YHNL LZ YH RUJHRPYHZPUT LT SPRPL[ [XIHTPYa' :LY T[PYHTJLY JH[YaLY VHX RLY ZXH\H[] VU[XXHPLTZ H[YYP JUTYZPZ[LX [T PSVHJZ Y[X RH W[HRPZa KL \PL KLY XaYPKLTZY LZ [YHNLXY K[ YLJZL[X #L]' . IX[PZ% JPXJ[RHZPUT% W[HRPZa KL RgHPX% LZJ'$' :H SUKPMPJHZPUT K[ XaNPSL O^KXH[RPW[L% LT XHPYUT LTZXL H[ZXLY KLY VXUIRaSHZPW[LY KgPTUTKHZPUTY Y[X RH XP\PbXL KLY =[ZHU[HPY% HPTYP W[L RH VXaYLX\HZPUT KLY SPRPL[] THZ[XLRY YUTZ aNHRLSLTZ KLY LTQL[] ` JUTYPKaXLX KHTY RL JHKXL K[ VXUQLZ' >HX HPRRL[XY% HMPT KgH\UPX [TL PKaL VR[Y VXaJPYL KLY VUZLTZPLRY LTQL[]% PSVHJZY LZ T[PYHTJLY% TU[Y YU[OHPZLXPUTY JUTTHdZXL RLY Y[VLXMPJPLY KLY ZXH\H[] KL KaIRHPY LZ XLSIRHPY XaHRPYaY ` RgPTZaXPL[X KL RH RPSPZL KLY PTUTKHZPUTY KL XaJ[XXLTJL KL KL[] HTY KL RH XP\PbXL KLY =[ZHU[HPY Y[X RL ZLXXPZUPXL K[ ?[aILJ' :LY Y[VLXMPJPLY HYYUJPaLY H[] U[\XHNLY VLXSHTLTZY LZ ZLSVUXHPXLY YUTZ aNHRLSLTZ ...

Report

Attachment Health Canada's Comments on the Initial Project Description for the Alexandra Bridge

  • Alexandra Bridge Replacement Project
  • Author: Health Canada submitted by Joel Kaushansky
  • Reference number: 16
  • Submitted: 2022-04-21 - 4:05 PM
  • Project phase: Planning
  • Participation notice: Public Notice - Public Comments Invited on a Summary of the Initial Project Description
  • Health Canada’s Comments on the Initial Project Description for the Alexandra Bridge. Should you have any follow-up questions, please contact Joel Kaushansky (joel.kaushansky@hc-sc.gc.ca (mailto:joel.kaushansky@hc-sc.gc.ca))
  • Attachment included
  • Enclosure 3: Review Table for the Alexandra Bridge Replacement Project - Initial Project Description (IPD) IPD submitted on March 15, 2022, by Public Services and Procurement Canada and National Capital Commission (the Proponent). Response due by: April 21, 2022. Please use this document to provide comments on the Alexandra Bridge Replacement Project (the Project). The document consists of two tables. Table 1 will enable you to describe potential project effects.1 The Impact Assessment Agency of Canada (the Agency) requires detailed advice to inform the Summary of Issues provided to the Proponent pursuant to subsection 14(1) of the Impact Assessment Act (IAA). Please refer to prompts in the table to guide your responses. Table 2 will facilitate the collection of general or editorial comments. Table 1: Description of the potential effects of the Project 1 effects in this context means changes to the environment or to health, social or economic conditions and the positive and negative consequences of these changes. Comment ID Document Reference Valued Component Project Component Description of the Potential Effect (Context and Rationale) Powers, Duties and Functions Risk Characterization Rating Instructions to the Proponent Summary of the Issue HC-01 Table 14-9: Planned Studies Pg. 168 PDF Health – General Deconstruction and Construction Phases It is not clear if potential impacts to human health will be assessed using Health Canada’s environmental assessment guidance documents related to: drinking and recreational water quality, country foods, and human health risk assessment. As noted in our March ...
  • Attachment included
  • 1 Environmental Health Program (EHP) Regulatory Operations & Enforcement Branch (ROEB) Health Canada 180 Queen Street West, 10th Floor Toronto, ON M5V 3L7 April 21, 2022 Owais Khurshid Project Manager, Ontario Region Impact Assessment Agency of Canada 600-55 York Street Toronto, ON M5J 1R7 Submitted via IAAC Registry Subject: Health Canada’s Comments on the Initial Project Description for the Alexandra Bridge Replacement Project Dear Owais Khurshid, Thank you for your email dated March 24, 2022 requesting Health Canada’s comments on the initial Project Description (iPD) for the Alexandra Bridge Replacement Project. Health Canada participates in the impact assessment process as a federal authority under the Impact Assessment Act, upon request. Health Canada makes available specialist/expert information or knowledge in their possession to responsible authorities and review panels, among others. Health Canada does not make decisions or issue licenses, permits, or authorizations in relation to the impact/ environmental assessment of a development project. In March 2021, Health Canada submitted comments on the draft iPD which have been mostly addressed by the Proponent within this revised project description; only one comment has not been fully addressed. Health Canada has completed Enclosures 1 and 3 based on the information included in the revised iPD and provided additional comments for your consideration. For transparency, Health Canada has provided a copy of its comments on the draft iPD within Enclosure 3. Should you have any ...
  • Attachment included
  • Alexandra Bridge Replacement Project Page 1 of 2 CIAR reference number: 83444 Enclosure 1: Federal Authority Advice Record: Authority and Summary of Issues Project: Alexandra Bridge Replacement Project Proponent: Public Services and Procurement Canada and National Capital Commission CIAR No.: 83444 Part A - Summary of Issues, Permitting Plan and Tailored Impact Statement Guidelines Response due by: April 18, 2022 (extended to April 21, 2022) All comments should be submitted via the Submit a Comment feature available on the Project’s Canadian Impact Assessment Registry page (Reference 83444 at http://iaac-aeic.gc.ca/050/evaluations/proj/83444?culture=en-CA. Letters and forms can be uploaded using this feature. If you have any difficulties submitting this way, please contact the Agency at Alexandra@iaac- aeic.gc.ca for assistance. Department/Agency: Health Canada Primary Contact Details: Contact Name: Joel Kaushansky Telephone: (343) 550-6213 Address: 180 Queen St. West 10th Floor Toronto, Ontario M5V 3K1 Fax: not applicable Email: joel.kaushansky@hc-sc.gc.ca Alternate Contact Details (if applicable): Contact Name: Kitty Ma Telephone: (647) 829-8295 Address: 180 Queen St. West 10th Floor Toronto, Ontario M5V 3K1 Fax: not applicable Email: kitty.ma@hc-sc.gc.ca 1. Identify and describe the specialist or expert information or knowledge within your department or agency that would be relevant to the conduct of the impact assessment of the Project, should a federal impact assessment be required. As a federal authority, Health Canada will provide specialist or expert ...

Report

Date submitted Display filters

Filters

Consultation typesDisplay filters

Project phaseDisplay filters

Participation noticesDisplay filters

Date modified: