Napanee Generating Station Expansion Project

Atura Power is proposing to expand the existing Napanee Generating Station, a natural gas-fueled electricity generating station located about 13 kilometres south of Napanee, Ontario. As proposed, the Napanee Generating Station Expansion Project would include a 430-megawatt simple cycle gas turbine generator, generator step-up transformer and grid connections, natural gas supply, and ancillary components and equipment. The project would increase the electric generating capacity of the existing Napanee Generating Station from 1,040 to 1,470 megawatts to support year-round electricity generation in Ontario. The project is anticipated to operate until 2040.


Latest update

July 15, 2026 — The Vice-President of Operations of the Impact Assessment Agency of Canada, on behalf of the Minister of the Environment, Climate Change and Nature, responded to a designation request received on June 5, 2026, for the Napanee Generating Station Expansion Project proposed by Atura Power. The project cannot be designated under the Impact Assessment Act because the carrying out of the physical activity has substantially begun. The reasons are provided in the response from the Vice-President of Operations.

Participate

Key documents

Key documents
Document number Document title File Date
2 Vice-President's response - July 15, 2026

Contacts

Impact Assessment Agency of Canada
160 Elgin Street, 22nd Floor
Ottawa, Ontario K1A 0H3
Telephone: 613-957-0700 or 1-866-582-1884
Fax: 613-957-0862
Email: information@iaac-aeic.gc.ca

Media Relations
Impact Assessment Agency of Canada
160 Elgin Street, 22nd Floor
Ottawa, Ontario K1A 0H3
Email: media@iaac-aeic.gc.ca


Disclaimer

This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.

  • Location

    • Napanee (Ontario)
  • Nature of Activity

    • Oil and Gas
  • Assessment Status

    Completed
  • Start Date

    2026-06-05
  • Proponent

    Atura Power
  • Authorities

    • Impact Assessment Agency of Canada
  • Assessment Type

    Request for designation not applicable
  • Reference Number

    90628