Elsipogtog New Subdivision

Construction of a new, 20 lot subdivision in Elsipogtog First Nation, NB. Each lot will be approximately 1800m2 (30m x 60m). Construction activities include: a new municipal-type service roadway with water supply and sewer connection to residential lots. The work will consist of installation of environmental protection measures (e.g. silt fencing for erosion and sedimentation control); site grading and construction of ditch and drainage swales to control runoff; construction of the municipal roadway to services the subdivision; installation of water and sewer services (e.g. distribution/collection piping, service laterals); and installation of culverts for individual lot driveways.


Latest update

June 23, 2021 – Indigenous Services Canada issued its notice of determination  https://iaac-aeic.gc.ca/050/evaluations/document/139470  and determined that the project is not likely to cause significant adverse environmental effects.

Participate

Key documents

Key documents
Document Number Document Title File Date
2 Notice of Determination for the Elsipogtog New Subdivision - June 23, 2021
1 Public Comment Period on Intent to Make a Determination - May 3, 2021

Contacts

Indigenous Services Canada - Atlantic
Indigenous Services Canada
PO BOX 160
40 Havelock Street
Amherst, Nova Scotia B4H 3Z3
Telephone: 1-800-567-9604
Fax: 902-661-6237
Email: aadnc.paeat-erpat.aandc@canada.ca


  • Location

    • Elsipogtog First Nation (New Brunswick)
  • Nature of Activity

    • Building and Property Development
  • Assessment Status

    Completed
  • Start Date

    2021-05-03
  • Proponent

    Elsipogtog First Nation
  • Authorities

    • Indigenous Services Canada
  • Assessment Type

    Project on federal lands
  • Reference Number

    81592
Disclaimer