Upgrades to Port of Belledune Tank Farm

Greenergy Fuels Canada Inc. proposes to reactivate the liquid bulk fuels tank farm and pipeline located within the Port of Belledune at 221 Curry Drive, Belledune, NB. This facility would receive products by ship (approximately 10 cargoes per year) and offload through the pipeline to the tank farm. Newly constructed infrastructure would be installed to facilitate the supply of gasoline and diesel products, including renewable diesel, biodiesel, and ethanol blended gasoline, to Northern New Brunswick as well as to load outbound rail cars that will supply other Greenergy markets. It is anticipated that the annual terminal throughput volume could be as much as 500,000,000 L. By making products available to the local area via marine vessel and rail car, it is expected that there will be a significant reduction in long haul trucking requirements, thereby reducing emissions and minimizing the need for long distance transportation of dangerous goods by road. 

The Project would consist of the following:

  • Upgrading of automated equipment and controls on existing infrastructure (pipelines and tanks) to optimize process safety systems and to minimize the potential for any adverse effects to people or place.
  • Installation of a Vapour Management System to eliminate any potentially harmful air emissions.
  • Installation of product containment infrastructure to manage the potential risk of leaks, drips and spills, including spill containment pads/trays, underground catch basins and oil water separators. 
  • Upgrades to terminal and port roads that will direct truck traffic through the port and away from residential areas.
  • Installation of new high speed truck loading infrastructure to facilitate short haul trucking logistics to local markets.
  • Rejuvenation of the existing office, control room and warehouse to create a comfortable space for all new employees that will be recruited from the local area.

Construction is anticipated to commence in August 2025 and would be completed in November 2025. New equipment and infrastructure will be modular in nature and fabricated offsite, thereby eliminating the need for a lengthy construction period. Modules will be delivered to site, set in place, and all interconnecting piping will be bolted together in place. Construction hours will be consistent with standard seasonal construction hours.

More


Latest update

September 5, 2025 – The Belledune Port Authority issued its Notice of Determination and determined that the project is not likely to cause significant adverse environmental effects.

Participate

Key documents

Key documents
Document Number Document Title File Date
2 Notice of Determination - September 5, 2025
1 Notice of Intent to Make a Determination - Start of Public Comment Period - July 17, 2025

Contacts

Belledune Port Authority
Jeffrey David, Chief Engineer & Operations Officer
112 Shannon Drive
Belledune, New Brunswick E8G 2W2
Telephone: 506-522-1200
Email: info@portbelledune.ca


Disclaimer

This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.

  • Location

    • Belledune (New Brunswick)
  • Nature of Activity

    • Ports and Harbours
  • Assessment Status

    Completed
  • Start Date

    2025-07-17
  • Proponent

    Greenergy Fuels Canada Inc.
  • Authorities

    • Belledune Port Authority
  • Assessment Type

    Project on federal lands
  • Reference Number

    89737

Nearby assessments

...within 200 kilometres
Date modified: