Port of Belledune Tank Farm Optimizations

The proposed project consists of optimizations to the existing tank farm to improve operational flexibility, redundancy, and fuel-handling capacity within the existing terminal. The proposed scope of work would include the following: 

Phase 1 - Upgrades to existing infrastructure for redundancy and optimization

  • Twinning the existing transfer pump for loading products onto ships at the dock from the tank farm creating redundancies for operations; 
  • Piping modifications to install the new pump; 
  • Installation of electrical and instrumentation to power and control the system; 
  • Installation of a two double-walled, 75,000 L above ground tanks for the storage of Premium Gasoline to facilitate its movement to the existing truck loading racks;
  • Installation of a new truck offloading station for offloading Conventional Blendstock for Oxygenate Blending from a truck to the tank farm;
  • Installation of a new truck offloading station for offloading Premium Gasoline to tanks; and
  • Installation of an environmental containment areas under and around new equipment.

Phase 2 - Installation of a new Vapour Recovery Unit (VRU) to replace the existing temporary Vapour Combustion Unit (VCU)

  • Laying structural foundations;
  • Installation of a prefabricated VRU system;
  • Installation of piping and valves for vapour and return lines; and
  • Installation of electrical and instrumentation to power and control the unit.

More


Latest update

September 22, 2026 – The Belledune Port Authority intends to make a determination regarding whether the carrying out of the project is likely to cause significant adverse environmental effects. To help inform this determination, the Belledune Port Authority is inviting public comments until October 22, 2026 respecting that determination.

Participate

Key documents

Key documents
Document number Document title File Date
1 Notice of Intent to Make a Determination – Start of Public Comment Period - September 22, 2026

Contacts

Belledune Port Authority
Jeffrey David, Chief Engineer & Operations Officer
112 Shannon Drive
Belledune, New Brunswick E8G 2W2
Telephone: 506-522-1200
Email: info@portbelledune.ca


Disclaimer

This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.

  • Location

    • Port of Belledune (New Brunswick)
  • Nature of activity

    • Oil and Gas
  • Assessment status

    In progress
  • Start date

    2026-09-22
  • Proponent

    Greenergy Fuels Canada Inc.
  • Authorities

    • Belledune Port Authority
  • Assessment type

    Project on federal lands
  • Reference number

    90679