Moraine Power Generation Project

Moraine Initiatives Ltd. is proposing the construction, operation, and decommissioning of a new natural gas-fired power plant, located near Whitecourt, Alberta. As proposed, the Moraine Power Generation Project would generate about 465 megawatts of electricity for the provincial grid. It would also include carbon dioxide (CO2) capture technology, with captured CO2 being transferred by a pipeline to an off-site carbon storage hub. Other project components would include a natural gas pipeline and a high-voltage electrical transmission line. The project is expected to operate for about 40 years.


Disclaimer

This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.

 

Latest update

September 22, 2023 — The Impact Assessment Agency of Canada resumed the 180 day time limit for the impact assessment.

 

The proponent provided its response to the Summary of Issues and the Agency accepted the Detailed Project Description. The Notice of Impact Assessment Decision with Reasons will follow at a later date.

Participate

Key documents

Key documents
Document Number Document Title File Date
41 Notice of Time Limit Resumption - September 22, 2023
43 Summary of the Detailed Project Description of a Designated Project PDF (5.9 MB) September 13, 2023
42 Detailed Project Description of a Designated Project PDF (64.1 MB) September 13, 2023
39 Notice of Time Limit Suspension with Reasons - August 10, 2023
38 Summary of Issues PDF (230 KB) July 17, 2023
3 Initial Project Description of a Designated Project PDF (66.7 MB) May 18, 2023
2 Summary of an Initial Project Description of a Designated Project PDF (4.4 MB) May 18, 2023

Contacts

Media Relations
Impact Assessment Agency of Canada
22nd Floor, Place Bell
160 Elgin Street
Ottawa, Ontario K1A 0H3
Telephone: 343-549-3870
Email: media@iaac-aeic.gc.ca

Moraine Power Generation Project
Impact Assessment Agency of Canada
9700 Jasper Avenue, Suite 1145
Edmonton, Alberta T5J 4C3
Telephone: 780-495-2037
Email: Moraine@iaac-aeic.gc.ca


  • Location

    • Whitecourt (Alberta)
  • Nature of Activity

    • Oil and Gas
  • Assessment Status

    In progress
  • Start Date

    2023-05-18
  • Proponent

    Moraine Initiatives Ltd.
  • Authorities

    • Impact Assessment Agency of Canada
  • Assessment Type

    Planning Phase for Impact Assessment
  • Reference Number

    84591

Nearby assessments

...within 200 kilometres
Date modified: