Attachment Federal Authority Advice Record - Women and Gender Equality Canada (WAGE)

  • Moraine Power Generation Project
  • Author: Administrator on behalf of Women and Gender Equality Canada (WAGE)
  • Reference number: 35
  • Submitted: 2023-07-10 - 11:51 AM
  • Project phase: Planning
  • Participation notice: Public Notice - Public Comments Invited on a Summary of the Initial Project Description
  • Please see the attached submission. 
  • Attachment included
  • ATTACHMENT: May 18, 2023 Federal Authority Advice Record Response due by June 16, 2023 Moraine Power Generation Project – Moraine Initiatives Ltd. Agency File: 005860 Department/Agency Women and Gender Equality Canada (WAGE) Lead Contact Denise Gareau, Director, GBA Plus Directorate, Research, Data, and Intersectionality (RDI) Branch Full Address 22 Eddy Street, 10th Floor Gatineau, QC J8X 2V6 Email FEGC.EvaluationImpacts-ImpactsAssessment.WAGE@fegc-wage.gc.ca Telephone 819-938-1132 Alternate Contact Jessica Bialek, A/Senior Analyst, GBA Plus Directorate, Research, Data, and Intersectionality (RDI) Branch Jessica.Bialek@fegc-wage.gc.ca 1. Is it probable that your department or agency may be required to exercise a power or perform a duty or function related to the Project to enable it to proceed? If yes, specify the Act of Parliament and that power, duty or function . 1b. Please describe any Indigenous or public consultation that will be undertaken in relation to the excise of that power, duty or function, including when it would take place. 1.a) WAGE does not hold any regulatory power, functions or duties. 1.b) N/A 2. Is your department or agency in possession of specialist or expert information or knowledge that may be relevant to the conduct of an impact assessment of the Project? Specify the specialist or expert information or knowledge. WAGE holds expertise in the application of GBA Plus (as intersectional analysis) as well as information related to gender equality, including gender-based violence. mailto:FEGC.EvaluationImpacts-ImpactsAssessment.WAGE@fegc-wage.gc.ca mailto:Jessica.Bialek@fegc-wage.gc.ca 3. Has your ...

Report

Attachment Moraine Power Generator Comment Letter

  • Moraine Power Generation Project
  • Author: Administrator on behalf of Alberta Wilderness Association
  • Reference number: 30
  • Submitted: 2023-07-10 - 11:00 AM
  • Project phase: Planning
  • Participation notice: Public Notice - Public Comments Invited on a Summary of the Initial Project Description
  • To the Impact Assessment Agency of Canada,   Alberta Wilderness Association (AWA) appreciates the opportunity to comment on the Moraine Power Generator. We have concerns regarding the construction of a new natural gas plant, the carbon capture technology under use, and the impact of construction on the sensitive landscapes, including a key wildlife biodiversity area. We oppose the development of new natural gas infrastructure, although should the project proceed, we advise re-routing of pipelines and transmission lines to avoid wetlands and key biodiversity areas, extensive restoration of construction areas to functional native habitat, and long-term monitoring of the facility and all components for changes to wildlife, vegetation or air, soil and water quality. Please see our detailed comments in the attached letter.
  • Attachment included
  • "Defending Wild Alberta through Awareness and Action” 455 – 12 Street NW, Calgary, AB T2N 1Y9 Phone 403.283.2025 awa@abwild.ca www.AlbertaWilderness.ca July 6, 2023 Moraine Power Generation Project Impact Assessment Agency of Canada 9700 Jasper Avenue, Suite 1145 Edmonton, Alberta T5J 4C3 By Email: Moraine@iaac-aeic.gc.ca RE: Moraine Power Generation Project The Alberta Wilderness Association (AWA) appreciates the opportunity to provide comments for on the Moraine Power Generation Project proposed near Whitecourt, Alberta. Founded in 1965, AWA strives to help Albertans understand the intrinsic values that wildlife and wilderness provide, and encourage communities to participate in conservation initiatives that will ensure a legacy for future generations. With over 7,000 members and supporters in Alberta and across Canada, AWA is dedicated to conserving and protecting Alberta’s wilderness. The Moraine Power Generation Project is proposing to construct a new natural gas-fired power plant with carbon capture and storage. In addition to the power generation facility, where electricity will be produced, the project also proposes an approximately 10 km transmission line and two pipelines, for carbon dioxide and natural gas transportation, estimated to be 12 km and 30 km in length respectively. AWA does not support continued development of natural gas infrastructure and has several concerns regarding the proposed project. Given the potential detriment to the environment, the risk to human and wildlife health and the expected carbon emissions, we suggest that the short-term benefits of this project fail to justify the costs of construction. Should the project proceed, ...

Report

Attachment RE: Moraine Power Generation Project - Notice of time limit suspension

  • Moraine Power Generation Project
  • Author: Administrator on behalf of Lac Ste. Anne Métis Community Association
  • Reference number: 26
  • Submitted: 2023-07-08 - 6:08 PM
  • Project phase: Planning
  • Participation notice: Public Notice - Public Comments Invited on a Summary of the Initial Project Description
  • Please see the atached submission. 
  • Attachment included
  • July 06, 2023 Via Email: Moraine@iaac-aeic.gc.ca Moraine Power Generation Project Impact Assessment Agency of Canada 9700 Jasper Avenue, Suite 1145 Edmonton, Alberta T5J 4C3 RE: Canada Impact Assessment Registry File No. 84591: Moraine Power Generation Project (the “Project”) The Lac Ste. Anne Métis Community Association (“LSAMCA”) is in receipt of a Project Information package dated May 18, 2023, and a Project Description Summary dated May 1, 2023, both pertaining to the Moraine Initiatives Limited’s Moraine Power Generation Project near Whitecourt, Alberta. We write today to provide our comments regarding these documents and with respect to the proposed Project. The proposed Project is within our traditional territory and will have potential adverse impacts and effects on our Métis harvesting rights and our use of lands and resources for traditional purposes. Background and Context As you should be aware, the Lac Ste. Anne Métis Community Association (“LSAMCA”) is the representative organization authorized to act on behalf of the historic and contemporary Lac Ste. Anne Métis (“LSAM”) community, which is a contemporary rights-bearing Powley Métis community which has section 35 Constitution Act, 1982 Métis Aboriginal rights. As such, LSAMCA is an “Indigenous governing body” as defined in the Impact Assessment Act1. LSAMCA is the second Métis organization in Alberta to establish a credible assertion of Métis harvesting rights2 under the Alberta Government’s Métis Credible Assertion 1Impact Assessment Act, S.C. 2019, c. 28, s. 2. 2 Government of Alberta website – Métis organization establishes credible assertion, Lac Ste. Anne Métis Community ...

Report

Attachment Comment of Support

  • Moraine Power Generation Project
  • Author: Town of Mayerthorpe
  • Reference number: 20
  • Submitted: 2023-07-07 - 9:37 PM
  • Project phase: Planning
  • Participation notice: Public Notice - Public Comments Invited on a Summary of the Initial Project Description
  • The Town of Mayerthorpe is in support of the Moraine Investments Power Generation Project.  The Town of Mayerthorpe anticipates the following impacts: Potential economic spin offs to Mayerthorpe's commercial and industrial businesses: welding fabrication; manufacturing and supply of plastic products; ready mix concrete products and precast concrete; aggregate and heavy construction; trucking and transportation. Potential for workers and their families to locate in Mayerthorpe accessing affordable housing, above average public services, and the many great amenities we have to offer. Potential for subsidiary businesses to locate into shovel ready commercial and industrial properties with high exposure as these lots front onto Highway 43 being the CanaMex Trade Corridor linking Canada to Mexico through the United States and Highway 22 being The Cowboy Trail tourism corridor. Potential to raise awareness of new investment in northwestern Alberta elevating the region's profile as an ideal place for industry to locate. Increased supply to the power grid will result in reduced power interruptions, lessen power consumption restrictions, lessen the need for industry shutdowns during peak consumption, and provide for greater stability in power pricing making the region and province more attractive to investors provincially, nationally and internationally. Thank you for providing this opportunity to express our support of this most worthwhile project that has the ability to have local and far reaching positive impacts.    

Report

Attachment Application for the Moraine Power Generation Project by Moraine Initiatives Ltd. - comments of Sucker Creek First Nation on the Initial Project Description

  • Moraine Power Generation Project
  • Author: Administrator on behalf of Sucker Creek First Nation
  • Reference number: 32
  • Submitted: 2023-07-07 - 8:31 PM
  • Project phase: Planning
  • Participation notice: Public Notice - Public Comments Invited on a Summary of the Initial Project Description
  • Please see the attached submission. 
  • Attachment included
  • Box 65 Enilda, Alberta, Canada Phone: 1-780-523-4426 Fax: 1-780-523-3111 Toll Free: 1-800-567-5552 July 7, 2023 Sent via E-mail: Moraine@iaac-aeic.gc.ca Moraine Power Generation Project Impact Assessment Agency of Canada 9700 Jasper Avenue, Suite 1145 Edmonton, Alberta T5J 4C3 Dear Sir/Madam: Re: Application for the Moraine Power Generation Project (the “Project”) by Moraine Initiatives Ltd. (the “Proponent”): comments of Sucker Creek First Nation (“SCFN”) on the Initial Project Description (the “IPD”). The purpose of this letter is to respond to the IPD submitted to the Impact Assessment Agency of Canada (the “IAAC”) by the Proponent. In this submission we will raise the concerns that SCFN has observed with the Project in light of the IPD. Through a high-level summary of the potential direct and cumulative effects that the Project will have on SCFN rights, we aim to provide the IAAC with information that will be pertinent in drafting the Summary of Issues. The Initial Project Description The Proponent is proposing a natural gas-fueled power generation facility located approximately 10 kilometres west of the town of Whitecourt, in central Alberta. The Proponent indicates that the Project is to supply reliable and affordable clean electricity to Albertans and is planned to be aligned with Canada’s objectives of achieving net-zero emissions from the electricity grid by 2035. The Project involves two main pipelines – the first a 30 kilometre-long extension bringing natural gas from the existing NGTL pipeline network for its main power generation facility and the second a 12 kilometre-long carbon dioxide (CO2) pipeline that will bring captured CO2 from ...

Report

Attachment Application for the Moraine Power Generation Project by Moraine Initiatives Ltd. - comments of Louis Bull Tribe on the Initial Project Description

  • Moraine Power Generation Project
  • Author: Administrator on behalf of Louis Bull Tribe
  • Reference number: 28
  • Submitted: 2023-07-07 - 8:30 PM
  • Project phase: Planning
  • Participation notice: Public Notice - Public Comments Invited on a Summary of the Initial Project Description
  • Please see the attached submission. 
  • Attachment included
  • Shaleigh Raine Lands and Consultation Manager Louis Bull Tribe Maskwacis, AB July 7, 2023 Sent via E-mail: Moraine@iaac-aeic.gc.ca Moraine Power Generation Project Impact Assessment Agency of Canada 9700 Jasper Avenue, Suite 1145 Edmonton, Alberta T5J 4C3 Dear Sir/Madam: Re: Application for the Moraine Power Generation Project (the “Project”) by Moraine Initiatives Ltd. (the “Proponent”): comments of Louis Bull Tribe (“LBT”) on the Initial Project Description (the “IPD”). The purpose of this letter is to respond to the IPD submitted to the Impact Assessment Agency of Canada (the “IAAC”) by the Proponent. In this submission we will raise the concerns that LBT has observed with the Project in light of the IPD. Through a high-level summary of the potential direct and cumulative effects that the Project will have on LBT rights, we aim to provide the IAAC with information that will be pertinent in drafting the Summary of Issues. The Initial Project Description The Proponent is proposing a natural gas-fueled power generation facility located approximately 10 kilometres west of the town of Whitecourt, in central Alberta. The Proponent indicates that the Project is to supply reliable and affordable clean electricity to Albertans and is planned to be aligned with Canada’s objectives of achieving net-zero emissions from the electricity grid by 2035. The Project involves two main pipelines – the first a 30 kilometre-long extension bringing natural gas from the existing NGTL pipeline network for its main power generation facility and the second a 12 kilometre-long carbon dioxide (CO2) pipeline that will bring captured CO2 from the power generation facility ...

Report

Attachment Alexis Nakota Sioux Nation Comment on proposed Moraine Power Generation Project

  • Moraine Power Generation Project
  • Author: JFK Law LLP (on behalf of Alexis Nakota Sioux Nation)
  • Reference number: 19
  • Submitted: 2023-07-07 - 8:29 PM
  • Project phase: Planning
  • Participation notice: Public Notice - Public Comments Invited on a Summary of the Initial Project Description
  • Please see attached comment on behalf of Alexis Nakota Sioux Nation. 
  • Attachment included
  • July 7, 2023 340-1122 Mainland Street Vancouver, BC V6B 5L1 T 604-687-0549 ext. 104 F 604 687.2696 www.jfklaw.ca Louise Kyle She/Her/Hers Associate E lkyle@jfklaw.ca Moraine Power Generation Project Impact Assessment Agency of Canada 9700 Jasper Avenue, Suite 1145 Edmonton, Alberta T5J 4C3 Moraine@iaac-aeic.gc.ca File No. 1228-026 To whom it may concern: Re: Initial Project Description – Moraine Power Generation Project We write on behalf of Alexis Nakota Sioux Nation (“ANSN”) in respect of the application by Moraine Initiatives Limited (“Moraine”) for its proposed natural gas-fired power generation facility with integrated carbon dioxide capture (the “Project”). In this letter, we are providing comments on the proposed Project’s Initial Project Description (“IPD”). The proposed Project is located directly adjacent to the ANSN Whitecourt 232 reserve in ANSN’s traditional territory, which has historically and remains important for the exercise of ANSN’s section 35 Aboriginal and treaty rights protected by the Constitution Act, 1982. ANSN is already facing the cumulative impacts of development within its territory and is concerned about the potential impacts of this proposed Project on its rights given the nature of the activities, the overlap of the Project location with areas of importance to ANSN for the continued exercise of its rights and culture, and the reality that ANSN relies on the integrity of its traditional territory to support habitats, vegetation, and traditional resources which are required for the continued exercise of rights. ANSN has not been provided with funding to undertake a review of the IPD, therefore this letter in no way represents a thorough ...

Report

Attachment Application for the Moraine Power Generation Project by Moraine Initiatives Ltd. - comments of Driftpile Cree Nation on the Initial Project Description

  • Moraine Power Generation Project
  • Author: Administrator on behalf of Driftpile Cree Nation
  • Reference number: 31
  • Submitted: 2023-07-07 - 8:29 PM
  • Project phase: Planning
  • Participation notice: Public Notice - Public Comments Invited on a Summary of the Initial Project Description
  • Please see the attached submission. 
  • Attachment included
  • Mihtatakaw Sipiy Driftpile Cree Nation P.O. Box 30 Driftpile, Alberta T0G 0V0 Phone: (780) 355-3868 July 7, 2023 VIA E-MAIL: Moraine@iaac-aeic.gc.ca Moraine Power Generation Project Impact Assessment Agency of Canada 9700 Jasper Avenue, Suite 1145 Edmonton, Alberta T5J 4C3 Dear Sir/Madam: Re: Application for the Moraine Power Generation Project (the “Project”) by Moraine Initiatives Ltd. (the “Proponent”): comments of Driftpile Cree Nation (“Driftpile”) on the Initial Project Description (the “IPD”). The purpose of this letter is to respond to the IPD submitted to the Impact Assessment Agency of Canada (the “IAAC”) by the Proponent. In this submission we will raise the concerns that Driftpile has observed with the Project in light of the IPD. Through a high-level summary of the potential direct and cumulative effects that the Project will have on Driftpile rights, we aim to provide the IAAC with information that will be pertinent in drafting the Summary of Issues. The Initial Project Description The Proponent is proposing a natural gas-fueled power generation facility located approximately 10 kilometres west of the town of Whitecourt, in central Alberta. The Proponent indicates that the Project is to supply reliable and affordable clean electricity to Albertans and is planned to be aligned with Canada’s objectives of achieving net-zero emissions from the electricity grid by 2035. The Project involves two main pipelines – the first a 30 kilometre-long extension bringing natural gas from the existing NGTL pipeline network for its main power generation facility and the second a 12 kilometre-long carbon dioxide (CO2) pipeline that will bring captured CO2 from the power generation facility to ...

Report

Attachment WLFN #128 - Comments on the Initial Project Description for the Moraine Power Generation Project

  • Moraine Power Generation Project
  • Author: Administrator on behalf of Whitefish Lake First Nation #128
  • Reference number: 33
  • Submitted: 2023-07-07 - 6:40 PM
  • Project phase: Planning
  • Participation notice: Public Notice - Public Comments Invited on a Summary of the Initial Project Description
  • Please see the attached submission. 
  • Attachment included
  • July 7, 2023 #796824v6 340-1122 Mainland Street Vancouver, BC V6B 5L1 T 778 819 3842 F 604 687.2696 www.jfklaw.ca Blair Feltmate He/Him/His Associate E bfeltmate@jfklaw.ca VIA EMAIL Moraine Power Generation Project Impact Assessment Agency of Canada 9700 Jasper Avenue, Suite 1145 Edmonton, Alberta T5J 4C3 Moraine@iaac-aeic.gc.ca File No. 1265-070 To whom it may concern: Re: Initial Project Description  Moraine Power Generation Project We write on behalf of       WLFN #128) in         Moraine    natural gas-fired power generation facility with integrated carbon dioxide capture (the Project       the proposed  Initial Project Description IPD The Project is situated on   traditional territory (please see Appendix A) and has the potential to impact the resources upon which WLFN #128 relies for the exercise of their Treaty rights and related cultural practices, the health and safety of community members, and the integrity of the environment upon which WLFN #128 relies for its way of life. WLFN #128 has not been provided with funding to undertake a review of the IPD, therefore this letter in no way represents a thorough technical      About WLFN #128 WLFN #128 is a First Nation with Aboriginal and Treaty rights protected by s. 35 of the Constitution Act, 1982 and a signatory of Treaty 6. WLFN #128 is located in Alberta with reserve land approximately 220 km northeast of Edmonton. The total population of WLFN #128 is approximately 2,378 with ...

Report

Attachment RE: MNA Region 5 submission

  • Moraine Power Generation Project
  • Author: Administrator on behalf of Métis Nation of Alberta (MNA) Region 5
  • Reference number: 29
  • Submitted: 2023-07-07 - 5:25 PM
  • Project phase: Planning
  • Participation notice: Public Notice - Public Comments Invited on a Summary of the Initial Project Description
  • Please see the attached submission. 
  • Attachment included
  • Walter Andreeff BSc. Mé�s Na�on of Alberta, Region 5 Consulta�on Coordinator 353 Main St. N P.O. Box 1787 Slave Lake, AB T0G 2A0 Email: wandreeff@me�s.org Cell: (780)3801468 1 | P a g e July 7th, 2023 Mr. Roy S. Belden Vice President Moraine Initiatives Limited 4000, 421 – 7th Avenue SW Calgary AB T2P 4K9 Moraine Power Generation Project Impact Assessment Agency of Canada (IAAC) 9700 Jasper Avenue, Suite 1145 Edmonton, Alberta T5J 4C3 Dear Mr. Belden and IAAC, The following information is intended to provide comments on the Project Description Summary for the Moraine Power Generation Project. Section 2.1 Indigenous Engagement 1. Métis Nation of Alberta (MNA) Region 5 was not identified in the use of the LAIRT process by the proponent or IAAC. 2. How will this project advance reconciliation? I suggest the project will require reconciliation planning with Indigenous communities, measurable goals, transparency in reporting and commitments over the longer term during construction activities, startup and operations. 3. Since MNA Region 5 was not identified in the LAIRT process, how can this project provide for meaningful engagement with our community? Section 3.2 Purpose of and Need from the Project Description Summary There is very little information and numbers in the description on how the project will supply reliable, affordable, and on-demand low-emitting electricity generation to Albertans. I wonder if there is further information on how this project could potentially affect the Alberta wholesale electricity market structure. Could there be a short or long term financial impact to the residential consumers in Alberta from increased electricity ...

Report

Attachment Federal Authority Advice Record - Environment and Climate Change Canada

  • Moraine Power Generation Project
  • Author: Administrator on behalf of Environment and Climate Change Canada
  • Reference number: 34
  • Submitted: 2023-07-07 - 4:08 PM
  • Project phase: Planning
  • Participation notice: Public Notice - Public Comments Invited on a Summary of the Initial Project Description
  • Please see the attached submission. 
  • Attachment included
  • Environmental Protection Operations Directorate Prairie & Northern Region ECCC File: 4194-10-3/6343 9250 49 Street Edmonton, AB T6B1K5 IAAC Registry: 84591 July 7, 2023 via email at: Stephanie.Krysa@iaac-aeic.gc.ca Stephanie Krysa Impact Assessment Agency of Canada / Prairie and Northern Region 1145-9700 Jasper Avenue, Edmonton, AB T5J 4C3 Dear Stephanie Krysa: RE: 84591– Environment and Climate Change Canada’s (ECCC) Federal Authority Advice Record (FAAR) for the proposed Moraine Power Generation Project Environment and Climate Change Canada has reviewed Moraine Initiatives Ltd.’s Initial Project Description for the proposed Moraine Power Generation Project as requested by the Impact Assessment Agency of Canada in a May 18, 2023 letter. Our FAAR response is attached. Our advice is based on ECCC’s mandate under the Species at Risk Act, the Migratory Birds Convention Act, the pollution prevention provisions of the Fisheries Act and the Canadian Environmental Protection Act, 1999. Your one-window contact for coordination of ECCC’s participation in this project is Jordan Hollman, phone:587-200-6620, email: jordan.hollman@ec.gc.ca. Please also address electronic correspondence to the ECCC Prairie and Northern Region EA Generic Inbox at EASouthPNR@ec.gc.ca. Sincerely, Andrea McLandress Regional Director, Environmental Protection and Operations Directorate Prairie and Northern Region cc: Gillian Brown, A/Head, EA-PNR South, EPOD, ECCC Marcus Edino, ...

Report

Attachment Public Comment Submission - Moraine Power Generation Project (Woodlands County)

  • Moraine Power Generation Project
  • Author: Administrator on behalf of Woodlands County
  • Reference number: 27
  • Submitted: 2023-07-07 - 11:37 AM
  • Project phase: Planning
  • Participation notice: Public Notice - Public Comments Invited on a Summary of the Initial Project Description
  • Please see the attached document.
  • Attachment included
  • Municipal Office PO Box 60, #1 Woodlands Lane Whitecourt, AB T7S 1N3 Telephone: 780-778-8400 woodlands.ab.ca Regional Municipal Office PO Box 33 Fort Assiniboine, AB T0G 1A0 Telephone: 780-584-3866 Page 1 of 1 7 July 2023 Moraine Initiatives Limited 4000, 421 – 7 Avenue SW Calgary, AB T2P 4K9 Attention: Ankur Mathur, Senior Vice President, GE Capital Roy S. Belden, Vice President, Moraine Initiatives Limited Jason Doupe, Vice President, Stantec Consulting Ltd. RE: Moraine Power Generation Project, Initial Project Description Woodlands County is pleased to offer this letter in support of the Moraine Power Generation Project and its components. We believe the project will benefit our residents and business community while providing reliable power to all Albertans. By design, this project seeks to maximize the use of existing infrastructure, while limiting environmental effects. Located in an already disturbed area ensures preservation of forest and waterways. Older, less efficient generation projects in Alberta need replacement and this new facility will be compliant with new regulations for efficiency and emissions. The project will fill a growing need for reliable, affordable, and on- demand power generation. At this stage several tangible benefits for the region have been identified. Job creation, both during construction and for long term operation is paramount. Existing energy sector is enhanced through local natural gas production and processing. Carbon sequestration from this project will help establish a carbon hub that will open other industrial opportunities. This diversification of industry will both add to and diversify local ...

Report

Attachment Moraine Initiatives Power Plant Project

  • Moraine Power Generation Project
  • Author: Administrator on behalf of Descendants of Michel First Nation Association
  • Reference number: 25
  • Submitted: 2023-07-03 - 1:43 PM
  • Project phase: Planning
  • Participation notice: Public Notice - Public Comments Invited on a Summary of the Initial Project Description
  • Please see the attached submission. 
  • Attachment included
  • Moraine Power Generation Project Impact Assessment Agency of Canada Suite 1145, 9700 Jasper Avenue Edmonton, AB, T5J 4C3 July 3, 2023 To whom it may concern: This project is taking place on our traditional Treaty Six territory, as such I am concerned with the initial undertaking of construction and what it will do to the wildlife, fish and groundwater, ground disturbance and the environment in general to the humans habituating the area. I am also concerned how the project will affect traditional land use. As I am sure you are aware, Indigenous people are very connected to the land. We use it for medicine picking, hunting, fishing, ceremony, and various other activities. We are Treaty Six signatories and as such have every right to harvest and use the land. We are always careful to give back to our mother earth. My recommendation is a full-scale reclamation of the land being utilized. I have been to other sites where the original inhabitants of the land have been reclaimed as the project moves along. That being the trees, grass, traditional medicines and whatever else has been displaced during the construction phase, so that the environment and wildlife can once again flourish. Sincerely, Brandy Callihoo CEO DMFNA <original signed by> <Email address removed> <Personal information removed>

Report

Attachment Federal Authority Advice Record - Employment and Social Development Canada (ESDC)

  • Moraine Power Generation Project
  • Author: Administrator on behalf of Employment and Social Development Canada (ESDC)
  • Reference number: 22
  • Submitted: 2023-06-30 - 12:09 PM
  • Project phase: Planning
  • Participation notice: Public Notice - Public Comments Invited on a Summary of the Initial Project Description
  • Please see the attached document.
  • Attachment included
  • ATTACHMENT: May 18, 2023 Federal Authority Advice Record Response due by June 16, 2023 Moraine Power Generation Project – Moraine Initiatives Ltd. Agency File: 005860 Department/Agency Employment and Social Development Canada (ESDC) Lead Contact Sarah Strapps - Director of Policy Integration and Special Projects (PISP) branch of the Skills and Employment Branch (SEB) Full Address Phase IV 140 Promenade du Portage, Gatineau, Québec K1A 0J9 Canada Email sarah.strapps@hrsdc-rhdcc.gc.ca Telephone 1-873-355-9643 Alternate Contact Cathy Grimes – Manager (PISP-SEB) 1-819-635-2828 cathy.grimes@servicecanada.gc.ca 1. Is it probable that your department or agency may be required to exercise a power or perform a duty or function related to the Project to enable it to proceed? If yes, specify the Act of Parliament and that power, duty or function. ESDC does not exercise powers, nor perform specific duties or functions related to the Project to enable it to proceed. The ESDC Minister’s powers, duties and functions extend to and include all matters relating to human resources and skills development in Canada or the social development of Canada over which Parliament has jurisdiction, and which are not by law assigned to any other Minister, department, board or agency of the Government of Canada. 1b. Please describe any Indigenous or public consultation that will be undertaken in relation to the excise of that power, duty or function, including when it would take place. While ESDC is not engaging with Indigenous groups regarding specific projects, it can provide the IAAC with information about relevant programming to assist in responses to Indigenous nations and ...

Report

Attachment O'Chiese First Nation Submission of Comments on Moraine Initiatives Initial Project Description

  • Moraine Power Generation Project
  • Author: Administrator on behalf of O'Chiese First Nation
  • Reference number: 21
  • Submitted: 2023-06-28 - 7:48 PM
  • Project phase: Planning
  • Participation notice: Public Notice - Public Comments Invited on a Summary of the Initial Project Description
  • Please see the attached submission. 
  • Attachment included
  • P a g e 1 | 54 O’CHIESE FIRST NATION Box 2127 Rocky Mountain House, Alberta – T4T 1B6 Phone: (403) 989-3943 Fax: (403) 989-3795 Toll Free: 1-888-256-3884 June 28, 2023 Stephen McCarthy Senior Consultation Analyst Prairie and Northern Region Impact Assessment Agency of Canada Sent via. email: moraine@iaac-aeic.gc.ca; stephen.mccarthy@iaac-aeic.gc.ca Dear Mr. McCarthy, Re: O’Chiese First Nation Submission of Comments on the Initial Project Description for the Moraine Initiatives Ltd. Power Generation Project This letter is sent on behalf of O’Chiese First Nation’s Chief and Council. The Chief and Council of O’Chiese First Nation have the elected authority and responsibility to protect the Inherent and Treaty rights of O’Chiese First Nation. The Inherent and Treaty rights of O’Chiese First Nation are recognized by Treaty No. 6, protected by Section 35 of the Constitution Act, 1982, and guided by Kaa-Ke-Chi-Ko-Moo-Nan. O’Chiese First Nation is bound by Kaa-Ke-Chi-Ko-Moo-Nan, O’Chiese First Nation’s Great Binding Law (“Natural Laws”). As such, O’Chiese First Nation operates under its own distinct set of legal principles and laws that have been in place since time immemorial. Our Natural Laws are the foundation for O’Chiese First Nation Peoples and our Inherent and Treaty rights. On May 18, 2023 the Impact Assessment Agency of Canada (“IAAC” or the "Agency”) accepted the Initial Project Description (“IPD”) from Moraine Initiatives Ltd. (“Moraine” or the “Proponent”) for the proposed Moraine Power Generation Project (the “Project”).1 As stated in the IAAC’s May 18, 2023 letter to O’Chiese First Nation, the Agency is “initiating consultation activities with ...

Report

Attachment Comments on the Moraine Power Generation Project on the behalf of the Metis Nation of Alberta Region 5 by the Consultation Coordinator

  • Moraine Power Generation Project
  • Author: Zone 5, Regional Council of the Métis Association of Alberta (MNA Region 5)
  • Reference number: 12
  • Submitted: 2023-06-20 - 3:09 PM
  • Project phase: Planning
  • Participation notice: Public Notice - Public Comments Invited on a Summary of the Initial Project Description
  • N/A
  • Attachment included
  • Walter Andreeff BSc. Consultation Coordinator Zone 5, Regional Council of the Métis Association of Alberta P.O. Box 1787 Slave Lake, AB, T0G 2A0 Moraine Power Generation Project Impact Assessment Agency of Canada Suite 1145, 9700 Jasper Avenue Edmonton, AB, T5J 4C3 June 20th, 2023 To whom it may concern: MNA Region 5 is the regional, rights-bearing Métis community that has Métis s. 35 rights throughout our traditional territory. We are the “The Lesser Slave Lake Métis Territory” and live in Region 5 as the regional, rights-bearing Métis community. Our traditional territory overlaps other regional area boundaries of the Métis Nation of Alberta (MNA). MNA Region 5 is part of the Métis Nation within Alberta, as well as the larger Métis Nation in Canada. Our Métis people are bound together by a shared history, common genealogy, a common language, cultural practises, and social traditions. Our people have the right to harvest for food or spiritual uses, or to undertake social, and ceremonial activities on lands throughout northern and central Alberta. Our community could be potentially impacted by the proposed Moraine Power Generation Project (the project). We ask to be formally consulted on the project. Métis members of MNA Region 5 undertake several cultural and harvesting activities in the project area as well as locations upstream and downstream of the proposed project within the Athabasca River drainage basin. Any potential impact to the river, lands and wildlife from construction activity or any other industry related activity could impact the Indigenous rights of Métis people. At this time, we do not have an adequate amount of information on any existing ...

Report

Attachment Federal Authority Advice Record - Indigenous Services Canada (ISC)

  • Moraine Power Generation Project
  • Author: Administrator on behalf of Indigenous Services Canada (ISC)
  • Reference number: 23
  • Submitted: 2023-06-16 - 8:53 AM
  • Project phase: Planning
  • Participation notice: Public Notice - Public Comments Invited on a Summary of the Initial Project Description
  • Please see the attached document.
  • Attachment included
  • GCDOCS # 114243673 ATTACHMENT: May 18, 2023 Federal Authority Advice Record Response due by June 16, 2023 Moraine Power Generation Project – Moraine Initiatives Ltd. Agency File: 005860 Department/Agency Indigenous Services Canada (ISC) Lead Contact Greg Bosse Full Address 9700 Jasper Avenue, Edmonton, Alberta, T5J 4G2 Email Gregory.bosse@sac-isc.gc.ca Telephone 780-232-1721 Alternate Contact Debra Nkusi, Senior Analyst, First Nations and Inuit Health branch, debra.nkusi@sac-sic.gc.ca Jan Triska, jan.triska2@sac-isc.gc.ca 1. Is it probable that your department or agency may be required to exercise a power or perform a duty or function related to the Project to enable it to proceed? If yes, specify the Act of Parliament and that power, duty or function. 1b. Please describe any Indigenous or public consultation that will be undertaken in relation to the excise of that power, duty or function, including when it would take place. ISC does not anticipate to exercise a power or perform a duty or function related to the Project. The IPD mentions an option that was considered to site the Project on Alexis Whitecourt #232. If this option is revisited, the First Nation Commercial and Industrial Development Act and the ISC Environmental Review Process could apply. 2. Is your department or agency in possession of specialist or expert information or knowledge that may be relevant to the conduct of an impact assessment of the Project? mailto:debra.nkusi@sac-sic.gc.ca mailto:jan.triska2@sac-isc.gc.ca GCDOCS # 114243673 Specify the specialist or expert information or knowledge. Indigenous Services Canada has a mandate to support ...

Report

Attachment Federal Authority Advice Record - Natural Resources Canada

  • Moraine Power Generation Project
  • Author: Administrator on behalf of Natural Resources Canada
  • Reference number: 14
  • Submitted: 2023-06-16
  • Project phase: Planning
  • Participation notice: Public Notice - Public Comments Invited on a Summary of the Initial Project Description
  • Please see the attached submission. 
  • Attachment included
  • ATTACHMENT: May 18, 2023 Federal Authority Advice Record Response due by June 16, 2023 Moraine Power Generation Project – Moraine Initiatives Ltd. Agency File: 005860 Department/Agency Natural Resources Canada (NRCan) Lead Contact Sophia St. Lawrence Full Address 588 Booth Street, Ottawa, ON, K1A 0E4 Email sophia.stlawrence@nrcan-rncan.gc.ca Telephone N/A Alternate Contact Shelley Ball (shelley.ball@nrcan-rncan.gc.ca 1. Is it probable that your department or agency may be required to exercise a power or perform a duty or function related to the Project to enable it to proceed? If yes, specify the Act of Parliament and that power, duty or function . No. 1b. Please describe any Indigenous or public consultation that will be undertaken in relation to the excise of that power, duty or function, including when it would take place. N/A 2. Is your department or agency in possession of specialist or expert information or knowledge that may be relevant to the conduct of an impact assessment of the Project? Specify the specialist or expert information or knowledge. NRCan possesses the following expertise that may be relevant to the conduct of an impact assessment for this project: - Electricity systems - Energy and economic analysis - Petroleum and biofuels - Natural gas mailto:sophia.stlawrence@nrcan-rncan.gc.ca mailto:shelley.ball@nrcan-rncan.gc.ca 3. Has your department or agency considered the Project; exercised a power or performed a duty or function under any Act of Parliament in relation to the Project; or taken any course of action that would allow the Project to proceed in whole or in part? Specify. NRCan does not have an interest ...

Report

Attachment Federal Authority Advice Record - Health Canada

  • Moraine Power Generation Project
  • Author: Administrator on behalf of Health Canada
  • Reference number: 15
  • Submitted: 2023-06-15
  • Project phase: Planning
  • Participation notice: Public Notice - Public Comments Invited on a Summary of the Initial Project Description
  • Please see the attached submission. 
  • Attachment included
  • ATTACHMENT: May 18, 2023 Federal Authority Advice Record Response due by June 16, 2023 Moraine Power Generation Project – Moraine Initiatives Ltd. Agency File: 005860 Department/Agency Health Canada Lead Contact Brenda Woo, Regional Manager Full Address Suite 910, 9700 Jasper Ave Edmonton, Alberta T5J 4G3 Email Brenda.woo@hc-sc.gc.ca Telephone 780-288-3541 Alternate Contact graham.irvine@hc-sc.gc.ca 1. Is it probable that your department or agency may be required to exercise a power or perform a duty or function related to the Project to enable it to proceed? If yes, specify the Act of Parliament and that power, duty or function . No 1b. Please describe any Indigenous or public consultation that will be undertaken in relation to the excise of that power, duty or function, including when it would take place. 2. Is your department or agency in possession of specialist or expert information or knowledge that may be relevant to the conduct of an impact assessment of the Project? Yes Specify the specialist or expert information or knowledge. As a federal authority, Health Canada will provide specialist or expert information and knowledge in the Department’s possession (expertise) to mailto:graham.irvine@hc-sc.gc.ca support the assessment of impacts on human health from projects considered individually or cumulatively under the Impact Assessment Act (IAA). It should also be noted that expertise related to assessing human health that is relevant to impact assessment (IA) may be held by other federal, provincial, and municipal partners, reflecting the shared jurisdiction for environmental and human health within Canada. For example, ...

Report

Attachment Federal Authority Advice Record - Transport Canada

  • Moraine Power Generation Project
  • Author: Administrator on behalf of Transport Canada
  • Reference number: 24
  • Submitted: 2023-06-14 - 3:27 PM
  • Project phase: Planning
  • Participation notice: Public Notice - Public Comments Invited on a Summary of the Initial Project Description
  • Please see the attached document.
  • Attachment included
  • : May 18, 2023 Federal Authority Advice Record Response due by June 16, 2023 Moraine Power Generation Project – Moraine Initiatives Ltd. Agency File: 005860 Department/Agency Transport Canada Lead Contact Holly Poklitar Full Address 344 Edmonton Street, Winnipeg, Manitoba, R3P 2G5 Email holly.poklitar@tc.gc.ca Telephone 204-688-3872 Alternate Contact pnrprogramsea-programmeseerpn@tc.gc.ca 1. Is it probable that your department or agency may be required to exercise a power or perform a duty or function related to the Project to enable it to proceed? If yes, specify the Act of Parliament and that power, duty or function. Transport Canada may be required to exercise a power or perform a duty or function. Specifically, approval may be required under the Canadian Navigable Waters Act (CNWA) for works that impact navigable waterways. The Athabasca River is a Scheduled Waterway under the CNWA and is considered navigable. Its tributaries may also be considered navigable based on their details. Project components that are CNWA works include pipelines, transmission lines, and changes to existing waterway intakes and waterway crossings. 1b. Please describe any Indigenous or public consultation that will be undertaken in relation to the excise of that power, duty or function, including when it would take place. If the Project requires an approval from Transport Canada under the CNWA, the Department will consider consultation activities undertaken through the impact assessment process, if one occurs. If Transport Canada determines that additional consultation is needed, the Department would conduct this before a CNWA approval is issued. 2. Is your ...

Report

Attachment Federal Authority Advice Record - Fisheries and Oceans Canada

  • Moraine Power Generation Project
  • Author: Administrator on behalf of Fisheries and Oceans Canada
  • Reference number: 11
  • Submitted: 2023-06-09 - 7:07 PM
  • Project phase: Planning
  • Participation notice: Public Notice - Public Comments Invited on a Summary of the Initial Project Description
  • Please see the attached submission. 
  • Attachment included
  • ATTACHMENT: May 18, 2023 Federal Authority Advice Record Response due by June 16, 2023 Moraine Power Generation Project – Moraine Initiatives Ltd. Agency File: 005860 Department/Agency Fisheries and Oceans Canada Lead Contact Erin Cawthorn Full Address 1028 Parsons Road, Edmonton AB, T6X 0J4 Email Erin.Cawthorn@dfo-mpo.gc.ca Telephone 587-335-9522 Alternate Contact Clayton James (Clayton.James@dfo-mpo.gc.ca) 1. Is it probable that your department or agency may be required to exercise a power or perform a duty or function related to the Project to enable it to proceed? Yes If yes, specify the Act of Parliament and that power, duty or function . Based on the initial project description, a paragraphs 34.4(2)(b) and 35(2)(b) Fisheries Act Authorization may be required because the project has the potential to cause the death of fish and/or the harmful alteration, disruption, or destruction of fish habitat, which is prohibited unless authorized. Fisheries and Oceans Canada (DFO) also reviews projects for effects to listed aquatic species at risk, any part of their critical habita t or the residences of their individuals in a manner which is prohibited under sections 32, 33 and subsection 58(1) of the Species at Risk Act, respectively. Based on the initial project description, work will be occurring within the range of Rainbow Trout (Athabasca River population – Endangered) and a review to determine the need for a permit under the Species at Risk Act (SARA) will be required once detailed crossing information is available. 1b. Please describe any Indigenous or public consultation that will be undertaken in relation to the exercise of that power, duty or ...

Report

Attachment RE: Moraine Initiatives Power Plant Project

  • Moraine Power Generation Project
  • Author: Administrator on behalf of Kelly Lake First Nation
  • Reference number: 36
  • Submitted: 2023-06-07 - 4:20 PM
  • Project phase: Planning
  • Participation notice: Public Notice - Public Comments Invited on a Summary of the Initial Project Description
  • Please see the attached submission. 
  • Attachment included
  • KELLY LAKE FIRST NATION Consultation Department P.O. Box 116, Toms Lake, BC V0C 2L0 Email: klfnconsultation@gmail.com “A Community Located in British Columbia” KELLY LAKE FIRST NATION Consultation Department Page 1 of 2 June 7, 2023 Impact Assessment Agency of Canada Prairie and Northern Region Suite 1145, 9700 Jasper Avenue Edmonton AB T5J 4C3 Attention: Stephen McCarthy Delivered via Email to: stephen.mccarthy@iaac-aeic.gc.ca RE: LETTER OF CONCERN: Moriane Power Generation Project – Whitecourt Alberta “Indigenous peoples have the right to maintain and strengthen their distinctive spiritual and material relationship with the lands, territories, waters, coastal sea, and other resources which they have traditionally owned or otherwise occupied or used; and to uphold their responsibilities for future generations in this regard….” The U.N. Declaration of Rights of Indigenous Peoples, Geneva, SWT. On behalf of Kelly Lake First Nation (KLFN), and in response to your letter of May 18, 2023, this letter serves to advise the Impact Assessment Agency of our concerns relative to the proposed Moriane Power Generation Project noted above. KLFN traditional lands and their members are a community of persons whose constitutionally protected harvesting and other rights are exercised throughout the traditional territory of KLFN, and whom may be directly affected by this work. Although historically, land usage of KLFN covered a vast territory, more recently through interviews, recorded oral history and testimony from the Elders and custodians of knowledge; the area has refined to what is commonly referred to as KLFN traditional ...

Report

Date submittedDisplay filters

Filters

Consultation typesDisplay filters

Project phaseDisplay filters

Participation noticesDisplay filters

Date modified: