Department of National Defence Canadian Patrol Submarine Project at CFB Halifax – Phase 2, Construction and Infrastructure

The Department of National Defence (DND) is proposing a project. The project will involve construction of new infrastructure in support of the Canadian Patrol Submarine Project (CPSP) at Canadian Forces Base (CFB) Halifax. To support the delivery of the new submarines, DND must deliver complex, multi-purpose infrastructure at CFB Halifax by 2033 to enable submarine berthing, maintenance and operations. The proposed location is at the CFB Halifax Wrights Cove property, located adjacent to the Bedford Basin and Burnside Industrial Park, Dartmouth, Nova Scotia
The project includes the construction of buildings, roadways, underground and above ground utilities, and jetty infrastructure to support the following functions:

  • Submarine berthing and jetty operations (jetty, jetty cranes and shoreline infrastructure)
  • Submarine maintenance (maintenance facility / hardstand area /supply and stores facility / laydown areas / battery servicing)
  • Submarine maintenance (maintenance facility / hardstand area /supply and stores facility / laydown areas / battery servicing)
  • Training (unsecure and secure training centre(s))
  • Roads, sidewalks, and underground and aboveground utilities
  • Fire services / Military Police / security presence (fire hall and/or auxiliary support building)
  • Security infrastructure (fencing, cameras, etc.).
  • Parkade

The construction activities will also involve dredging, vegetation clearing, excavation, demolition, marine works, and the movement of construction equipment and materials. Additionally, the project will include the installation of the following building systems (associated hazardous substances in brackets): heating and cooling (halocarbons), reactant filling station (hydrogen, oxygen and nitrogen), fuel storage tank(s) (diesel/gas), oil water separator(s), and fire suppression systems. Demolition of existing buildings (two buildings) within the project area will be required prior to construction. Construction is anticipated to commence in 2027 and be completed by 2034. The initial site preparation phase is found under Department of National Defence Canadian Patrol Submarine Project at CFB Halifax – Phase 1, Site Preparation.
The approximate size of the construction area is 90,000 m2.


Latest update

October 16, 2026 - The authorities intend to make a determination regarding whether the carrying out of the project is likely to cause significant adverse environmental effects. To help inform this determination, the authorities are inviting public comments until November 15, 2026 respecting that determination.

Participate

Key documents

Key documents
Document number Document title File Date
1 Public Comment Period on Intent to Make a Determination - October 16, 2026

Contacts

Department of National Defence
CFB Halifax, Public Affairs
PO Box 99000, Station Forces
Halifax NS B3K 5X5
Email: CFBHalifaxPublicAffairs@forces.gc.ca


Disclaimer

This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.

  • Location

    • CFB Halifax - Wrights Cove, Dartmouth (Nova Scotia)
  • Nature of activity

    • Ports and Harbours
    • Defense and Security
  • Assessment status

    In progress
  • Start date

    2026-10-16
  • Proponent

    Department of National Defence
  • Authorities

    • Department of National Defence
    • Environment and Climate Change Canada
    • Fisheries and Oceans Canada
    • Halifax Port Authority
    • Transport Canada
  • Assessment type

    Project on federal lands
  • Reference number

    90841