Fuel Facility Oil Water Separator Replacement – 5th Canadian Division Support Base Gagetown

The Department of National Defence (DND) is proposing a project. The project consists of a preventive replacement of the garrison fuel station (AKA: Shirley Rd Fuel Facility, building L60) oil water separator (OWS) equipment which is approaching the end of its service life; during annual internal inspection of the OWS, observable deformation of the shell was noticed. The OWS double wall interstice vacuum monitoring gauge however confirms the OWS integrity has not been compromised at this point, but a replacement of the equipment is preferable as a preventive measure. Such project will require excavation on an area of about 60 m2 including roughly 200 m3 of disturbed material (mostly type 3 aggregate and type 5 gravel). The project itself is not intended to modify in anyway current infrastructure of the fuel station, intent is a simple return to original condition of the site rain water drainage equipment. L60 OWS is an important equipment in prevention of "release" as defined under the Canadian Environmental Protection Act (CEPA), the OWS offers an emergency hydrocarbon product retention capacity of 20,000 L for any petroleum product entering the site storm water drainage system, therefore represents a considerable mitigation factor towards eventual incidents at the facility keeping almost all cases into the category of "spill" not reaching the environment rather than "release" reportable to the authority having jurisdiction.

In addition to the OWS replacement the OWS effluent lift station will be increased in capacity to align with flow rate requirements from most recent data on possible rainfall in the area.


Latest update

February 8, 2026 – The public comment period on the project is closed. The Department of National Defence is considering comments received to help inform its determination on whether the carrying out of the project is likely to cause significant adverse environmental effects.

Participate

Key documents

Key documents
Document number Document title File Date
1 Public Comment Period on Intent to Make a Determination - January 29, 2026

Contacts

Gabriel Picard
Department of National Defence
Gabriel Picard, Project Manager, Mechanical Engineer - RPOU(A) Det Gagetown
PO BOX 17000 Stn Forces
Oromocto, New Brunswick E2V 4J5
Email: gabriel.picard2@forces.gc.ca


Disclaimer

This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.

  • Location

    • 5th Canadian Division Support Base Gagetown (New Brunswick)
  • Nature of Activity

    • Oil and Gas
  • Assessment Status

    In progress
  • Start Date

    2025-11-07
  • Proponent

    Department of National Defence
  • Authorities

    • Department of National Defence
  • Assessment Type

    Project on federal lands
  • Reference Number

    89997