Replacement of the Carvel Weather Radar
This is a non-designated project on federal lands or outside Canada. The listed authorities are responsible for the project assessment.
The purpose of the project is to decommission the existing Carvel Weather Radar, located in Alberta, and install a new weather radar system in its place. The new Carvel radar will continue to provide coverage for the Edmonton area and will consist of a 22 m open lattice steel tower with an 11.8 m diameter radome at the top (sphere covering the antenna) for a total height of approximately 35 m including lightning protection rods. The new radar will operate at frequency of 2835MHz.
The radar is located at 1529 Parkland Hwy, Carvel, Alberta, T0E 0H0, a property owned by ECCC. The geographic coordinates of the proposed radar site are 53.560519°, -114.144811°.
For more information:
Latest update
Notice of Determination
Carvel, AB – January 25, 2021 – Environment and Climate Change Canada (ECCC) and Innovation, Science and Economic Development Canada (ISEDC) have determined that the proposed project for the replacement of the Carvel Weather Radar is not likely to cause significant adverse environmental effects.
This determination was based on a consideration of the following factors:
- impacts on rights of Indigenous peoples;
- Indigenous knowledge;
- community knowledge;
- comments received from the public; and
- technically and economically feasible mitigation measures.
ECCC and ISEDC are satisfied that the carrying out of the project is not likely to cause significant adverse environmental effects. Therefore, ECCC and ISEDC may carry out the project, exercise any power, perform any duty or function, or provide financial assistance to enable the project to be carried out in whole or in part.
Participate
Contacts
Sylvain Laramée, Director - Canadian Weather Radar Replacement Program4905 Dufferin St
North York, Ontario M3H 5T4
Email: ec.prrmc-cwrrp.ec@canada.ca
Disclaimer
This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.
-
Location
- 1529 Parkland Hwy, Carvel, Alberta, T0E 0H0 (Alberta)
-
Nature of Activity
- Other, not otherwise specified
-
Assessment Status
Completed -
Start Date
2019-05-24 -
Proponent
Environment and Climate Change Canada (ECCC) -
Authorities
- Environment and Climate Change Canada
- Innovation, Science and Economic Development
-
Assessment Type
Project on federal lands -
Reference Number
81223
Nearby assessments
...within 200 kilometres-
Remediation of a Royal Canadian Mounted Police Property in Stony Plain, Alberta
Town of Stony Plain -
Alexander First Nation Campground Project
Alexander First Nation -
Paul First Nation 2-unit Housing Project
Paul First Nation -
Paul First Nation Driveway Repairs Project
Paul First Nation -
Paul First Nation CFS Admin Building
Paul First Nation -
Paul First Nation Gas Station Project
Paul First Nation -
Paul First Nation Culvert Replacement Project
Paul First Nation -
Xplornet Telecommunications Tower Project
Alberta Beach -
Paul First Nation Solar Project
Paul First Nation -
Paul First Nation Solar Energy Project Interconnection Line
Paul First Nation -
Sundance 7 Generating Station Project
Wabamun -
Enoch Cree Nation mnn Childhood Family Services Administration Building Project
Enoch Cree Nation -
Enoch Village Water and Wastewater Rehabilitation
Enoch Cree Nation -
Enoch Phase 27 Housing Project 2020 (5 Units)
Enoch Cree Nation -
Enoch Cree Nation Wastewater System Upgrades
Enoch Cree Nation -
Enoch Cree Nation 2 Unit Housing Project
Enoch Cree Nation -
Enoch Cree Nation Housing Development Project
Enoch Cree Nation -
Enoch Cree Nation Traditional Lands Development Project
Enoch Cree Nation -
Alexis Nakota Sioux Junior and Senior High School - Educational dock
Alexis Nakota Sioux Nation -
Enoch Cree Nation ATCO PMR Maskekoshihk Phases 7-9
Enoch Cree Nation -
ATCO Removal of 35m 42.2 mm Transmission Line on Enoch Cree Nation
Enoch Cree Nation -
ATCO Removal of 1 km of 42 mm Pipeline on Enoch Cree Nation Phase 2
Enoch Cree Nation -
Rapid Housing Initiative 3 - Hill Plain
Alexis Nakota Sioux Nation -
RHI 20 Unit Subdivision
Enoch Cree Nation -
Pasa Tibi Village Elder's Living Facility
Alexis Nakota Sioux Nation -
Enoch Recovery Center Project
Enoch Cree Nation -
ATCO Gas Main Installation for NEDA Commercial Stage 1, Millennium Phase 1, and Community Recovery Center
Enoch Cree Nation -
Alexander Wastewater System Upgrades
Biofilter Wetland System -
Alexander Wastewater System Upgrades
Sewage Lagoon Rehab and Addition -
Enoch Nation Embers Addition to River Cree Casino & Hotel
Enoch Cree Nation -
Enoch River Cree Hotel Expansion
Enoch Cree Nation -
Alexis Nakota Sioux Nation Youth Transitional House Project
Alexis Nakota Sioux Nation -
ATCO Gate Station Project
ATCO Gate Station -
Enoch Cree Nation ATCO 1121399 Removal Phase 3 Project
Enoch Cree Nation -
Enoch Cree Nation Medical Treatment Centre Project
Enoch Cree Nation -
Alexis Gas Distribution to New Town Subdivision (30 Lots) Project
Alexis Nakota Sioux Nation -
Alexander Public Works and Fire hall Building Project
Alexander First Nation -
Alexander Wastewater System Upgrades
East Lift Station -
Alexander Wastewater System Upgrades
West Lift Station -
Alexander First Nation Mamawatoskewin Prevention Building
Alexander First Nation -
Waheeba Solar Energy Project
Alexis First Nation -
Alexander First Nation - Big Hills Estate Subdivision
Big Hills Estate Subdivision -
Alexander First Nation: BF 77352 Replacement and Twp Rd 562 Improvements
Alexander First Nation -
Alexander First Nation Waste Transfer/Diversion Station Rehabilitation
Alexander First Nation -
Alexander First Nation CU360 Drinking Water Supply Project
Alexander First Nation -
Parking Lot Resurfacing for the Entire Complex along with Line Painting at the RCMP K Division
Edmonton -
NAV CANADA Navigation Tower Facilities Replacement Project located West of the Edmonton International Airport in Leduc County
NAV CANADA Navigation Tower Facilities Tower 2 -
NAV CANADA Navigation Tower Facilities Replacement Project located West of the Edmonton International Airport in Leduc County
NAV CANADA Navigation Tower Facilities Tower 3 -
NAV CANADA Navigation Tower Facilities Replacement Project located West of the Edmonton International Airport in Leduc County
NAV CANADA Navigation Tower Facilities Tower 1 -
NAV CANADA Navigation Tower Facilities Replacement Project located West of the Edmonton International Airport in Leduc County
NAV CANADA Navigation Tower Facilities Tower 4 -
Trans Mountain Expansion Project
Edmonton -
Genesee Generating Station Expansion Project
Near Warburg -
Construction of Canadian Forces Housing Agency (CFHA) Apartments, Row Houses, Duplexes, Access Roads and Site Services, 3rd Canadian Division Support Base Edmonton
3rd Canadian Division Support Base -
Canadian Forces Base (CFB) Edmonton Garrison Spray Park and Playground Construction
Edmonton garrison -
Concept Design and Performance Specification for Edmonton Waveguide Bridge and Foundation Piers - 3rd Canadian Division Support Group, Edmonton
3rd Canadian Division Support Group, Edmonton -
Construct Land Vehicle Crew Training System Facility- 3rd Canadian Division Support Base Edmonton
3 Canadian Division Support Base (CDSB) Edmonton -
Design and Construct Dry Gap Bridge Training Aide, Canadian Forces Base Edmonton
Canadian Forces Base Edmonton -
Construct Transition Centre - 3rd Canadian Division Support Base Edmonton
3rd Canadian Division Support Base Edmonton -
Construction of the Strategic Tanker Transport Capability, Main Operating Base (West), Alberta
Main Operating Base (West) - Edmonton -
Repair Normandy Road - Canadian Forces Base Edmonton
Canadian Forces Base Edmonton -
Design and Construct Armored Combat Support Vehicle (ACSV) Facility- 3rd Canadian Division Support Group, Edmonton
3rd Canadian Division Support Group, Edmonton -
Skate Park Expansion - 3rd Canadian Division Support Group, Edmonton
3rd Canadian Division Support Base Edmonton -
1 Combat Engineer Regiment (CER) Compound Expansion - 3rd Canadian Division Support Base Edmonton
3rd Canadian Division Support Base Edmonton -
GroHERE at Edmonton International Airport
Edmonton International Airport -
Airport Perimeter Road South Extension at Edmonton International Airport
Edmonton International Airport -
AIRPORT CITY SOLAR PROJECT at Edmonton International Airport
Edmonton International Airport -
Cargo and Apron Development at Edmonton International Airport
Edmonton International Airport -
Runway End Safety Areas at Edmonton International Airport
Edmonton International Airport -
Alberta Zero Emissions Truck Electrification Collaboration Fueling Station
Edmonton International Airport -
Cargo and Apron Development at Edmonton International Airport
Edmonton International Airport (Alberta) -
Runway End Safety Areas at Edmonton International Airport
Edmonton International Airport -
Shell Service Station at Edmonton International Airport
Edmonton International Airport -
Leduc County Fire Services (fire Station) at Edmonton International Airport
Edmonton International Airport -
International Cargo Hub Development at Edmonton International Airport
Edmonton International Airport -
Construction and Rehabilitation to Existing Parking Lots, Parkade and Roadways at the Edmonton International Airport
Edmonton International Airport -
Groundside Roads Rehabilitation at Edmonton International Airport
Edmonton International Airport -
Cold Storage Facility Construction at Edmonton International Airport
Edmonton International Airport -
North Tower Expansion at Edmonton International Airport
Edmonton International Airport -
Taxiway B4 Pavement Rehabilitation at Edmonton International Airport
Edmonton International Airport -
Quick Park Improvements at Edmonton International Airport
Edmonton International Airport -
New Hotel Development at Edmonton International Airport
Edmonton International Airport -
Sanitary Mainline, Manhole, Waterline and Valve Repairs and Replacement at Edmonton International Airport
Edmonton International Airport -
Airside Pavement Repairs at Edmonton International Airport
Edmonton International Airport -
Groundside Roads Rehabilitation at Edmonton International Airport
Edmonton International Airport -
Reservoir 1 Gravel Road Construction and Parking Lot Regrading at Edmonton International Airport
Edmonton International Airport -
Value Park Pavement at the Edmonton International Airport
Edmonton Regional Airports Authority -
Arrivals Level Pavement Repairs at Edmonton International Airport
Edmonton International Airport -
International Cargo Hub Development at Edmonton International Airport
Edmonton International Airport -
AirPoint 2 Development at the Edmonton International Airport
Edmonton International Airport -
Base Line Terminal Project
Edmonton -
Enoch ATCO Plastic Mains Replacement Project
Enoch Cree Nation -
Potential Regional Assessment of a Western Energy Corridor from Alberta to Manitoba
Fort Saskatchewan -
Pigeon Lake Recreation Centre Water and Sewer Line Replacement Project
Pigeon Lake -
New Fibre Installation
Pigeon Lake 138A, Elk Island National Park -
Cando Sturgeon Rail Terminal West Expansion Project
Sturgeon County -
Fort Saskatchewan Rail Facility Project
Fort Saskatchewan -
Cando Sturgeon Rail Terminal Project
Sturgeon County -
Beacon AI Centers Heartland Project
Sturgeon County, about 7 kilometres east of Gibbons -
Greenlight Electricity Centre Project
10 km east of Gibbons, Sturgeon County -
Heartland Petrochemical Complex Rail Yard Project
North of Fort Saskatchewan -
Josephburg Condensate Fractionation Project
22 kilometres northeast of Edmonton -
Sturgeon Petrochemical Rail Yard Project
Six kilometres north of Fort Saskatchewan -
Redwater Facility Rail Yard Project
Near Redwater -
Heartland Generating Station Project
Fort Saskatchewan, Bruderheim -
ATCO Salt Cavern Storage Expansion Project
14 kilometres northeast of Fort Saskatchewan -
Enbridge Northern Gateway Project
Bruderheim -
Strathcona Salt Cavern Storage Project
near Fort Saskatchewan -
Value Chain Solutions - Heartland Complex Expansion Project
18 kilometres north east of Fort Saskatchewan -
Culvert Replacement with Larger Diameter
Elk Island National Park -
Pedestrian Bridge Replacement on Simmons Trail
Elk Island National Park -
New (Single) Tower Construction & Upgrade (Single) Tower
project site 1: Louis Bull 138B -
Bear and Moss Trails Restoration, Elk Island National Park
Elk Island National Park -
Louis Bull Water Treatment Plant Upgrades
Louis Bull Tribe -
Decoy Beaver Dam Pilot Project for Beaver Coexistence Management
Elk Island National Park of Canada -
Louis Bull Kikinow Housing Project
Louis Bull Tribe -
Louis Bull Tribe Water System Project/Water Treatment Plant and Reservoir
Louis Bull Tribe -
Louis Bull Tribe - 2020 Septic System Improvements
Louis Bull Tribe -
Ermineskin Solar Project
Ermineskin Cree Nation No. 138 -
Alberta Transportation Culvert Installation on Highway 16 near Main Park Entrance EINP
Elk Island National Park -
Astotin Lake Dock Replacement
Elk Island National Park -
Construct a new Mock Jump Tower training facility – Canadian Forces Base Edmonton
Canadian Forces Base Edmonton -
Reconstruct Asphalt Fitness Trails Phase 1 - 3rd Canadian Division Support Base Edmonton
3rd Canadian Division Support Base Edmonton -
New (Single) Tower Construction & Upgrade (Single) Tower
project site 2: Ermineskin 138 -
Xplore Inc., external modification to existing radiocommunications tower on Ermineskin No. 138 reserve land, near Maskwacis, AB.
Xplore Inc., external modification to existing radiocommunications tower on Ermineskin No. 138 reserve land -
Lamont Railcar Storage Project
Northwest of Lamont -
Culvert Clearing
Elk Island National Park -
Ermineskin Drainage Improvements (Culvert Replacement - Small Boy Road, Buffalo Avenue, 3 Mile Road) Project
Ermineskin Cree Nation -
Ermineskin Waste Transfer Station
Ermineskin Cree Nation -
Fortis Alberta Underground Powerline Installation
Elk Island National Park -
Samson Menaik Road Commercial Development Project
Samson Cree Nation -
RHI 3 - Samson Cree Nation
RHI 3 - Samson Cree Nation -
Ermineskin Sundancer Solar Project 2MWdc
Ermineskin Cree Nation -
Samson Cree Nation Water Infrastructure Replacement
Samson Cree Nation -
Samson Cree Nation Groundwater Well Improvement Project
Samson Cree Nation -
Samson Cree Nation 3 Mile Lagoon Drainage Improvements
Samson Cree Nation -
Samson Cree Nation Aboriginal Head Start on Reserve
Samson Cree Nation -
Montana First Nation Emergency Road Repairs
Montana First Nation -
O'Chiese Indian Reserve 203 Well pad Expansion
O'Chiese Reserve -
RW-4853 oil and gas pipeline O'Chiese IR203
RW-4853 oil and gas pipeline O'Chiese IR203 -
O'Chiese Indian Reserve 203
O'Chiese Indian Reserve 203 -
Flipi Gas-Fired Generation Project
Approximately 18 km southwest of Rimbey -
O'Chiese First Nation Education Way North End Subdivision
O'Chiese First Nation -
Proposed Wellsite Expansion within 15-27-044-10W5M and associated Borrow Pit in O'Chiese First Nation Reserve
O'Chiese First Nation Reserve No. 203 -
O'Chiese Culvert 3 Replacement Project
O'Chiese First Nation -
O'Chiese First Nation New School Road Culvert Replacements and Installation Project
O’Chiese First Nation -
O'Chiese Culvert 1 Replacement Project
O'Chiese First Nation -
Proposed Pipeline from 15-27 to 09-28-044-10W5M in O'Chiese Indian Reserve No. 203
Proposed Pipeline from 15-27 to 09-28-044-10W5M in O'Chiese Indian Reserve No. 203 -
O'Chiese Indian Reserve 203 Well pad Expansion
O'Chiese Reserve 203 -
OS-7256 oil and gas surface lease O'Chiese IR203
OS-7256 oil and gas surface lease O'Chiese IR203 -
Ryley Biomedical Waste Incinerator Project
Ryley -
O'Chiese Culvert 2 Replacement Project
O'Chiese First Nation -
O'Chiese First Nation
O'Chiese First Nation -
O'Chiese First Nation Powwow Arbor Replacement
O'Chiese First Nation -
OS-5844 oil and gas well site Sunchild IR202
OS-5844 Sunchild IR 202 -
Sunchild Indian Reserve Pipeline
Sunchild Indian Reserve -
Sunchild Gas Distribution Line
Sunchild -
Sunchild 202 Reserve oil and gas development OS-7243
Sunchild Reserve 202 -
Ryley Facility Expansion Project
Ryley -
O'Chiese First Nation Former Landfills Closure and Remediation Plan
O'Chiese First Nation -
Sunchild Culvert 1 Replacement Project
Sunchild First Nation -
O'Chiese First Nation (OCFN) - Baptiste River Bridge Replacement
O'Chiese No. 203 IR -
Proposed Wellsite Expansion within 11-06-043-09W5M and associated Borrow Pit in Sunchild Indian Reserve
Sunchild Reserve -
Proposed Pipeline from 11-06 to 03-02-043-10W5M in Sunchild First Nation Reserve
Sunchild First Nation Reserve #202 -
Sunchild First Nation Package Water Treatment Plant
Sunchild First Nation -
Proposed Pipeline from 03-15 to14-10-043-10W5 located in Sunchild Indian Reserve No. 202
Sunchild First Nation Reserve #202 -
Sunchild Culvert 2 Replacement Project
Sunchild First Nation -
Sunchild First Nation: Community Wastewater Lagoon and Access Road
Sunchild First Nation -
Sunchild First Nation: Community Roads, Residences, and Service Infrastructure Buildout
Sunchild First Nation -
Meanook National Wildlife Area Buildings Demolition
Meanook National Wildlife Area -
Moraine Power Generation Project
Whitecourt -
Alexis Nakota Sioux Nation 1993 Spill Remediation Project
Alexis Nakota Sioux Nation -
Sunchild First Nation Child and Family Services Temporary Emergency Placement Home and Offices
Sunchild First Nation -
Application for Approval of the 2021 Pipeline Decommission Program
Alexis Nakota Sioux Nation Whitecourt (IR 32) Reserve Lands -
Edson Mainline Expansion Project
Drayton Valley -
Edson Mainline Expansion Project
Drayton Valley -
Frog Lake First Nation Askiy Hemp Limited Partnership Project
Frog Lake First Nation -
Black Bear Power Plant Project
Swan Hills -
Parks Canada Rocky Mountain House National Historic Site Fiber communication installation 2025
Rocky Mountain House National Historic Site -
Storage Tank Decommissioning and Relocation at Multiple Locations - 3rd Canadian Division Support Base, Southern Alberta
Cormack Armoury - Red Deer -
Edson Mainline Expansion Project
Rocky Mountain House -
NOVA Gas Transmission Ltd. - 2021 NGTL System Expansion Project
Grande Prairie -
Highway 947 Extension Project
Edson -
Cascade Power Plant Project
Yellowhead County -
New (Multiple) Tower Construction & New Fibre Installation
Project Site 2: Kikino Metis Settlement -
Clearwater Peat Harvesting Project
Caroline -
New (Multiple) Tower Construction & New Fibre Installation
Project Site 1: Kikino Metis Settlement -
Saddle Lake Cree Nation Pathway to Learning
Saddle Lake Cree Nation -
Saddle Lake Broadband and Cellular Connectivity Upgrade and Resilience Plan Project
Saddle Lake -
Saddle Lake 40 Acre Housing Project
Saddle Lake Cree Nation -
Saddle Lake Cree Nation Townsite Pumphouse Project
Townsite Pumphouse -
Saddle Lake Cree Nation Women's Shelter Project
Saddle Lake Cree Nation -
Pathway to Learning
Saddle Lake No. 125 -
New (Multiple) Tower Construction & New Fibre Installation
Project Site 3: Kikino Metis Settlement -
Saddle Lake Cree Nation 9A Road Saddle Lake Creek Culvert Replacement Project
Saddle Lake Cree Nation -
Saddle Lake Gas Distribution System (Child Welfare Reunification Subdivision)
Saddle Lake Cree Nation -
Parking lot replacement at RCMP Detachment in Innisfail, Alberta
Innisfail -
RW-4852 and OS-7246 Authorization to Construct and Operate a Right of Way for a natural gas Pipeline and associated riser
Alexander First Nation -
Saddle Lake Cree Nation Road Rehabilitation
Saddle Lake #125 -
OS-7255 Authorization to Construct and Operate a Surface Lease for a Borrow Pit, a multi-well pad and log deck.
Alexander First Nation 134A -
Whitefish Lake First Nation #128 Waste Transfer Station
Whitefish Lake First Nation #128 -
Highway 947 Extension Project
-
Edson Mainline Expansion Project
Rocky Mountain House -
Whitefish Lake First Nation Subdivision Lot Development
Whitefish Lake First Nation #128 -
New Fibre Installation
Saddle Lake 125 -
Construction of Two Bridge Files in Saddle Lake Cree Nation
Construction of Two Bridge Files in Saddle Lake Cree Nation -
Robb Trend Coal Mine Expansion Project
Robb -
Saddle Lake Cree Nation: CU123 Whitefish Lake IR no. 128 Water System - Cistern Repairs & Replacements
Saddle Lake Cree Nation -
Saddle Lake Cree Nation: P047935 Child Welfare Reunification Infrastructure Project
Saddle Lake First Nation -
Stoney Nation Big Horn Wastewater System
Big Horn No. 144A -
New Fibre Installation
Big Horn 144A - site 2(BH-FSA) -
New Fibre Installation
Big Horn 144A - site 1(BH-POP) -
Beaver Lake Cree Nation Medical Center
Beaver Lake Cree Nation -
Beaver Lake Cree Nation Water Treatment Plant
Beaver Lake Cree Nation -
Beaver Lake Cree Nation New High School and Resource Centre
Beaver Lake Cree Nation -
Beaver Lake Cree First Nation Cardinal Drive Subdivision
Beaver Lake Cree Cardinal Drive Subdivision -
Beaver Lake Cree Nation Fiber Optic Internet Infrastructure - Universal Broadband Fund Project
Beaver Lake Cree Nation -
Beaver Lake New School
Beaver Lake Cree Nation -
Beaver Lake Cenovus Housing Initiative - Build Out of 20 Residential Lots, Access Roads, and Water Distribution
Beaver Lake Cree Nation -
Big Horn Reserve Water System
Big Horn Reserve No. 144A -
Notice of Intent to Make a Determination - Start of Public Comment Period (TELUS Communications Inc (AB103721) Beaver Lake Indian Reserve No. 131 )
AB103721 - Beaver Lake Indian Reserve No. 131 -
Beaver Lake Cree Nation Telus Telecommunications Tower
Beaver Lake Cree Nation -
Stoney Big Horn AORHS and Health Center Project
Stoney Nakoda Nation -
Stoney Big Horn Fire Hall
Big Horn Reserve -
Sawridge Band Solar Farm Project
Sawridge Band -
New Fibre Installation
Project Site 2: Sawridge No. 150G -
New Fibre Installation
Project Site 1: Sawridge No. 150G -
New Fibre Installation - Slave Lake
Project Site 1: Slave Lake -
New Fibre Installation - Slave Lake
Project Site 2: Slave Lake -
Sawridge First Nation - 2 Single Houses Project - 2025-2026
Sawridge First Nation -
Bigstone Health Centre
Bigstone Cree Nation