Fishing Lake First Nation - Sewage Lagoon Expansion
This is a non-designated project on federal lands or outside Canada. The listed authorities are responsible for the project assessment.
The Proposed Project
Works to include:
Construction of a two celled HDPE lined facultative lagoon (primary cell 1.5ha, Storage: 50,000 Cu.m) located in NW & NE & SE & SW - Sec 15 Twp 33 Rng 12 W2M. Infrastructure life span anticipated for 30+ years, with proper operation and maintenance. Existing lagoon (same site) to be decommissioned to WSA standards upon new Lagoon completion. Purpose of the project is to supply Fishing Lake First Nation with adequate sewage handling and treatment for the foreseeable future. All work within First Nation boundaries.
Vegetation will be stripped. Topsoil will be removed and stock piled. Berm material will be excavated, relocated and packed in place. HDPE liner will be installed on lagoon floor and fused. Topsoil will be replaced and seeded.
Primary Waste will be typical construction waste (access lumber etc.), minor access HDPE pipe, vegetation, and access topsoil.
Latest update
Participate
Key documents
| Document number | Document title | File | Date |
|---|---|---|---|
| 2 | Notice of Determination for the Fishing Lake Sewage Lagoon Expansion | - | March 18, 2024 |
| 1 | Public Comment Period on Intent to Make a Determination | - | December 14, 2022 |
Contacts
ISC-SKENVIndigenous Services Canada
Alvin Hamilton Building, 1783 Hamilton Street
Regina, Saskatchewan S4P 2B6
Telephone: 306-581-3134
Email: isc-skenv@sac-isc.gc.ca
Disclaimer
This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.
-
Location
- Fishing Lake IR 89A (Saskatchewan)
-
Nature of Activity
- Water Management
- Waste Management
-
Assessment Status
Completed -
Start Date
2022-12-14 -
Proponent
Fishing Lake First Nation -
Authorities
- Indigenous Services Canada
-
Assessment Type
Project on federal lands -
Reference Number
84170
Nearby assessments
...within 200 kilometres-
Solid Waste Transfer Station - Fishing Lake First Nation
Fishing Lake Indian Reserve 89 -
Fishing Lake First Nation - Agricultural Permit - C. Fehr
Fishing Lake IR 89 -
Agricultural permit - Fishing Lake - C. Fehr #2
Fishing Lake IR 89 -
Fishing Lake First Nation Prevention Centre
FISHING LAKE INDIAN RESERVE NO. 89 -
Saskatchewan Agriculture Drainage Network - Saline Lake Drainage Network Project
100 kilometres northwest of Yorkton -
On hold - Muskowekwan Wind Farm Project
Muskowekwan Indian Reserve 85-43, 85-49, 85-50, 85-63, 85-64, 85-65 -
Kawacatoose First Nation Road Repair Project
Kawacatoose First Nation -
Yellow Quill First Nation New Subdivision
Yellow Quill IR 90 -
Yellow Quill First Nation Wastewater Infrastructure Upgrades
Yellow Quill IR 90 -
Hutterite Brethren Church of Twin Creek Inc. - Grazing Permit - Muskowekwan First Nation - 2019-2023
Muskowekwan 85-10 and 85-15 -
Muskowekwan Potash Mine Project
Lestock -
Muskowekwan Lagoon & Sewage Pumping Station
Muskowekwan IR 85 -
Muskowekwan Water Treatment Plant Upgrades
Muskowekwan IR 85 -
Muskowekwan Solid Waste Transfer Station
Muskowekwan IR 85 -
New (Multiple) Tower Construction
Poject site 8: Kawacatoose FN I.r. 88 -
Muskowekwan First Nation Wastewater Infrastructure Upgrades
MUSKOWEKWAN INDIAN RESERVE NO. 85 -
New (Multiple) Tower Construction
Poject site 5: Kawacatoose FN I.r. 88 -
Muskowekwan Gas Bar & Convenience Store
Muskowekwan IR 85 -
New (Multiple) Tower Construction
Poject site 6: Kawacatoose FN I.r. 88 -
Agricultural permits on Saskatchewan First Nation Reserve Lands
Saskatchewan First Nations -
Grazing Permits on Saskatchewan First Nations Reserve Lands
Saskatchewan First Nation Communities -
Yellow Quill First Nation Subdivision Stage 2
Yellow Quill IR 90 -
New (Multiple) Tower Construction
Poject site 4: Kawacatoose FN I.r. 88 -
New (Multiple) Tower Construction
Poject site 7: Kawacatoose FN I.r. 88 -
New (Multiple) Tower Construction
Poject site 1: Kawacatoose FN I.r. 88 -
Kawacatoose First Nation Water Treatment Plant Upgrade and Expansion
Kawacatoose IR 88 -
New (Multiple) Tower Construction
Poject site 2: Kawacatoose FN I.r. 88 -
New (Multiple) Tower Construction
Poject site 3: Kawacatoose FN I.r. 88 -
George Gordon First Nation Wastewater Infrastructure Upgrades
Gordon 86 Indian Reserve -
George Gordon First Nation Lagoon Upgrades
Gordon 86 Indian Reserve -
Multi-use Front Lake Community Walking Path
Multi-use Front Lake Community Walking Path -
George Gordon First Nation Fire Hall
George Gordon First Nation -
Kawacatoose First Nation Subdivision
Kawacatoose IR 88 -
Little Black Bear First Nation Water Treatment Plant Upgrades
LITTLE BLACK BEAR INDIAN RESERVE NO. 84 -
Kinistin Saulteaux Nation Barrier River Bridge Replacement
Kinistin Saulteaux Nation -
Kinistin Saulteaux Nation Sewage Lagoon Expansion
Kinistin IR No. 91 -
Kinistin Solid Waste Transfer Station
Kinistin Saulteaux Nation -
Star Blanket Water Treatment Plant Upgrades
Star Blanket First Nation -
Okanese Cree Nation - Water Treatment Plant Upgrade
Okanese IR 82 -
Okanese First Nation Head Start Building Construction
Okanese First Nation -
Okanese Lagoon Access Road Upgrades
Okanese First Nation -
Blanket Permit - SaskEnergy - Gasification of Okanese Indian Reserve No. 82
Okanese First Nation -
The Key First Nation Firehall
The Key First Nation -
Peepeekisis Cree Nation Community Lagoon Improvements
PEEPEEKISIS INDIAN RESERVE NO. 81 -
The Key First Nation Lagoon Upgrade Project
The Key First Nation -
Yorkton Tribal Council Child & Family Services Office Building
Kahkewistahaw IR 92 A-1 -
Peepeekisis Cree Nation Road Construction
PEEPEEKISIS INDIAN RESERVE NO. 81 -
Peepeekisis Cree Nation Youth Safe House
PEEPEEKISIS INDIAN RESERVE NO. 81 -
SaskPower Rural Rebuild - 2D-41 Birmingham Southwest
Star Blanket Indian Reserve No. 83-D -
Peepeekisis Cree Nation Youth Impact Centre
Peepeekisis Cree Nation -
Peepeekisis Community Centre
Peepeekisis IR #81 -
Standing Buffalo Dakota Nation - Solid Waste Transfer Station
Standing Buffalo IR 78 -
Keeseekoose First Nation Well Completions
KEESEEKOOSE INDIAN RESERVE NO. 66 -
Keeseekoose Road to Community Wells
KEESEEKOOSE INDIAN RESERVE NO. 66 -
Standing Buffalo Dakota Nation Youth Centre
Standing Buffalo Indian Reserve No. 78 -
Standing Buffalo Dakota Nation - Water Treatment Plant Upgrade
Standing Buffalo IR 78 -
Aspen Power Station Project
Lanigan -
Key Junction Gas Bar & Confectionery
The Key First Nation -
Standing Buffalo Day Care and Head Start
Standing Buffalo Indian Reserve No. 78 -
Last Mountain Lake National Wildlife Area Water Control Structure Re-naturalization Project
Last Mountain Lake National Wildlife Area -
Standing Buffalo Gas Station Expansion
Standing Buffalo Dakota Nation -
Keeseekoose Multi-Purpose Health facility
Keeseekoose IR 66 -
New Fibre Installation - Central and Southeastern SK
Project site 10: KEESEEKOOSE I.R. 66 -
Zagime Community Center
Zagime IR #74-3 -
Keeseekoose Education Center Drainage
KEESEEKOOSE INDIAN RESERVE NO. 66 -
Walkway to support healthy lifestyle for Cote First Nation
Bagerville -
Upgrade Single Tower & New Fibre Installation
Project Site 2: Central East region -Badgerville -
New Fibre Installation - Central and Southeastern SK
Project site 6: COTE I.R. 64 -
Keeseekoose - Agricultural Permit - S. Marsh
Keeseekoose - Agricultural Permit - S. Marsh -
New Fibre Installation - Central and Southeastern SK
Project site 1: Cote 64 -
Pasqua First Nation Lagoon Upgrade
Pasqua First Nation -
New (Multiple) Tower Construction
Muscowpetung Saulteaux Nation - North Tower -
Cote First Nation Main Landfill Decommissioning
Cote IR 64 -
Cote First Nation #64 - Landfill decommissioning at the Main Landfill Site
Badgerville -
New (Multiple) Tower Construction
School Tower -
Cote First Nation Wood Treatment Remediation Project
Cote IR 64 -
Last Mountain Lake National Wildlife Area Observation Tower II
Last Mountain Lake National Wildlife Area -
Pasqua First Nation - New Spray Park
Pasqua 79 -
Pasqua First Nation Subdivision Phase 4
Pasqua First Nation -
Pasqua First Nation Elders's Centre
Pasqua First Nation -
New (Multiple) Tower Construction
Muscowpetung Saulteaux Nation - South Tower -
Muscowpetung Saulteaux Nation - Solid Waste Transfer Station
Muscowpetung Saulteaux Nation -
Piapot Lagoon, Forcemain and Sewage Pumping Station
Piapot IR 75 -
Muscowpetung Daycare & Headstart
Muscowpetung First Nation -
Muscowpetung Powwow Arbour
Muscowpetung Saulteaux Nation -
Piapot First Nation Road to Community Wells
Piapot IR 75 -
Zagime Anishinabek First Nation - Section 95 housing project
Sakimay 74-5 -
Saskatchewan Agriculture Drainage Network - Brooksby Drainage Network Project
30 kilometres northeast of Melfort -
Stalwart National Wildlife Area Water Control Structure Re-naturalization Project
Stalwart National Wildlife Area -
Zagime Greenhouse
Zagime IR #74-9 / IR #74-2 -
Restoring Wetlands Within the Lake Winnipeg Basin with Cowessess First Nation SW-29-20-04-2
Cowessess First Nation -
Zagime Anishinabek Youth Safe House
Shesheep Indian Reserve No. 74A -
Basadinaa - Crooked Lake Cottage Lots Head Lease #3- Zagime Anishinabek First Nation
Sakimay IR 74, Shesheep IR 74A -
Basadinaa - Crooked Lake Cottage Lots Head Lease #4- Zagime Anishinabek First Nation
Shesheep IR 74A -
Basadinaa - Crooked Lake Cottage Lots Head Lease #5- Zagime Anishinabek First Nation
Shesheep IR 74 -
Basadinaa - Crooked Lake Cottage Lots Head Lease #4- Zagime Anishinabek First Nation
Sakimay IR 74 -
Basadinaa - Crooked Lake Cottage Lots Head Lease #5- Zagime Anishinabek First Nation
Sakimay IR 74 -
Basadinaa - Crooked Lake Cottage Lots
Shesheep IR 74A & Sakimay IR 74 -
Saskatchewan Agriculture Drainage Network - Atwater Drainage Network Project
60 kilometres southeast of Yorkton -
Zagime Anishinabëk Gasification
Zagime Anishinabëk Indian Reserves 74, 74-2, 74-9, 74-12, 74-16, 74-17 and Shesheep IR 74A -
Restoring Wetlands Within the Lake Winnipeg Basin with Cowessess First Nation SE-08-19a-05-2
Cowessess First Nation -
Restoring Wetlands Within the Lake Winnipeg Basin with Cowessess First Nation NE-32-17-10-2
Cowessess First Nation -
Peepeekisis Community Centre Gas Bar
Peepeekisis IR #81 -
Cote First Nation Solid Waste Transfer Station
Cote IR 64 -
Crooked Lake Outlet Structure Replacement
Crooked Lake - SW-08-19A-05 W2M -
Saskatchewan Agriculture Drainage Network - Atwater Drainage Network Project
60 kilometres southeast of Yorkton -
Saskatchewan Agriculture Drainage Network - Atwater Drainage Network Project
60 kilometres southeast of Yorkton -
Zagime Anishinabek New Subdivision Project
Zagime Anishinabek -
Keeseekoose - Agricultural Permit - K. Martenuik
Keeseekoose - Agricultural Permit - K. Marteniuk -
Saskatchewan Agriculture Drainage Network - Atwater Drainage Network Project
60 kilometres southeast of Yorkton -
Zagime Anishinabek Water Treatment Plant and Sewage Pumping Station Upgrade
Zagime Anishinabek First Nations -
Saskatchewan Agriculture Drainage Network - Atwater Drainage Network Project
60 kilometres southeast of Yorkton -
New Fibre Installation
Project Site 3: Zagime Anishinabek -
Zagime Anishinabek Youth Centre
Sakimay Indian Reserve No. 74 -
Zagime Anishinabek School
Sakimay IR 74 -
Saskatchewan Agriculture Drainage Network - Blackbird Creek Drainage Network Project
50 kilometres east of Yorkton, Saskatchewan -
Blanket Permit - SaskEnergy - Gasification of Sakimay
Sakimay -
Muscowpetung Powwow Arbour
Muscowpetung IR 80 -
Tway National Wildlife Area Water Control Structure Re-naturalization Project.
Tway National Wildlife Area -
Restoring Wetlands Within the Lake Winnipeg Basin with Cowessess First Nation
Cowessess First Nation -
New Fibre Installation
Project Site 2: Cowessess -
Vertical Farming and Sustainable Grazing for Food Security and Innovation
near Grenfell -
Cowessess - Agricultural Permit G. Lerat
Cowessess Indian Reserve 73 -
James Smith Cree Nation Solid Waste Transfer Station
James Smith Cree Nation -
Carry the Kettle First Nation - Nakota Junction Gas Station
Assiniboine IR 76 -
Carry The Kettle First Nation Lagoon Expansion
Assiniboine IR 76 -
Carry The Kettle First Nation Solid Waste Transfer Station
Assiniboine IR 76 -
James Smith Cree Nation Headstart and Daycare
JAMES SMITH INDIAN RESERVE NO. 100 -
James Smith Cree Nation Subdivision Stage 4
James Smith Cree Nation -
Blanket Permit - SaskEnergy - Gasification of Assiniboine Indian Reserve No. 76
Assiniboine Reserve No. 76 -
Kahkewistahaw First Nation Operations & Maintenance Building and Fire Hall
Kahkewistahaw First Nation -
Upgrade Single Tower & New Fibre Installation
Project site 8: Central East region - James Smith -
Tower Alteration for James Smith Cree Nation Justice & Policing communication system on James Smith Reserve No. 100
James Smith Cree Nation -
Kahkewistahaw First Nation Green Links and Teaching Garden: Connecting Elders and Youth
Kahkewistahaw First Nation -
Cowessess First Nation Solid Waste Transfer Station
Cowessess First Nation -
Kahkewistahaw First Nation Lagoon Upgrade
Kahkewistahaw IR 72 -
New Fibre Installation
Project Site 4: Kahkewistahaw -
Kahkewistahaw First Nation Water Treatment Plant Upgrade
Kahkewistahaw First Nation -
1236 Albert Street - Cowessess First Nation - Building Development
Cowessess IR No. 73 -
1201 Angus Street - Cowessess First Nation - Building Development for parking
Cowessess IR No. 73 -
Cowessess Urban Indigenous Health centre
Cowessess Indian reserve No. 73 -
Albert Street Building Development
1246 Albert Street, Regina, Saskatchewan -
Awasis Solar Project
SE 7-17-18 W2 -
Kahkewistahaw First Nation Subdivision Development (Phase 23)
Kahkewistahaw IR 72 -
Awasis Solar - 10 MW Project
Cowessess IR #73 -
Cowessess 10 MW Solar Project
Cowessess IR #73 -
Enbridge Pipelines Inc. - Line 3 Replacement Program
Regina -
James Smith Miyo-Pimatisiwin Wellness Centre
JAMES SMITH INDIAN RESERVE NO. 100 -
James Smith Cree Nation Peonan Creek Crossing
James Smith Cree Nation -
Kahkewistahaw First Nation Solid Waste Transfer Station
Kahkewistahaw IR 72 -
West Land Road and Sewer Extension
Sakimay IR 74-6 -
Installation of Potassium Acetate Tanks - Public Comments Invited
Regina International Airport -
Installation of Potassium Acetate Tanks - Public Comments Invited
Regina International Airport -
Saskatchewan Indigenous Enterprise Foundation Inc. Southern Office Complex
Lot 19 Plan 112422, NE 1/4 Sec. 20-17-20, W.2 M -
Runway De-Icing Liquid Storage Tank
Regina -
Restoring Wetlands Within the Lake Winnipeg Basin with Cowessess First Nation NE-06-17-05-02
Cowessess First Nation -
Runway 13-31 Rehabilitation
Regina -
Restoring Wetlands Within the Lake Winnipeg Basin with Cowessess First Nation SW-06-17-05-2
Cowessess First Nation -
Active Transportation for Ochapowace First Nation
Active Transportation for Ochapowace First Nation -
Ochapowace Nation Water Treatment Plant Upgrades
Ochapowace Nation -
New Fibre Installation
Project Site 5: Ochapowace -
Ochapowace Nation Subdivision - Phase I
Ochapowace Nation -
MEDA 324 kW Solar Farm
Muskoday IR 99 -
Saskatchewan Agriculture Drainage Network - Wascana Block A Drainage Network Project
25 kilometres southeast of Regina -
Star-Orion South Diamond Mine Project
Fort à la Corne Provincial Forest -
Albany Potash Mine Project
30 kilometers southeast of Regina, Saskatchewan, within the Regional Municipalities of Lajord and Francis -
Red Earth Cree Nation Carrot River and Natacam Lagoon Upgrades
Red Earth Cree Nation -
Red Earth Water Supply and Treatment Project
Red Earth First Nation -
Saskatchewan Agriculture Drainage Network - Vipond Drainage Network Project
6 kilometres east of Glenavon -
Red Earth Road Assessment and Upgrades
Red Earth Cree Nation -
Muskoday First Nation - Community Access Road
Muskoday First Nation Reserve -
Zagime Anishinabek Solid Waste Transfer Station
Sakimay IR 74 -
Piapot First Nation Prince Albert Urban Gas Bar & Convenience Store
Piapot IR 75 -
Red Earth Cree Nation Cultural Healing Center
Red Earth Cree Nation -
Red Earth Cree Nation Daycare and Head Start Building
Red Earth Cree Nation -
Mahikan Housing Development
Wuskwi Sipihk First Nation -
Red Earth Cree Nation Teacherage Replacement
Red Earth Cree Nation -
Muskoday First Nation - Drainage Improvements Phase 1
Muskoday First Nation Reserve -
Muskoday First Nation - Construct Cultural Centre
Muskoday First Nation - Construct Cultural Centre -
Beardy's & Okemasis Cree Nation Sewage Lagoon and Pumping Station Upgrades
Beardy's and Okemasis IR No. 96 & 97 -
Muskoday First Nation Sewage Lagoon Upgrade
Muskoday First Nation -
Mihkoskiwakak Nehiyawak Walking Path to Healthy Living
Mihkoskiwakak Nehiyawak Walking Path to Healthy Living -
Muskoday First Nation Subdivision Development
Muskoday First Nation I.R. 99 -
Restoring Wetlands Within the Lake Winnipeg Basin with Cowessess First Nation SW-09-15-05-2
Cowessess First Nation -
Muskoday First Nation Booster Station Upgrades
Muskoday First Nation -
Gas Station Construction Saskatoon
Kahkewistahaw Indian Reserve No. 72A-2 -
Grasswoods Reserve Septage Receiving Station, Retention Pond and Final Disposal to City of Saskatoon Forcemain
Grasswoods IR 192J -
Red Earth Sewage Pumping Station Upgrades
Red Earth Cree Nation -
Red Earth Road Assessment and Upgrades
Red Earth Cree Nation -
Red Earth River Dike Extension
Red Earth IR 29A -
Red Earth Cree Nation Shoreline Reinforcement
Red Earth Cree Nation Carrot River 29A -
Upgrade Single Tower & New Fibre Installation
Project Site 1: Central East region - Red Earth No. 29 (51356) -
New Fibre Installation - Central and Southeastern SK
Project site 3: One Arrow 95-1A -
Upgrade Single Tower & New Fibre Installation
Project site 3: North East region - One Arrow -
Shoal Lake Cree Nation Lagoon Upgrades
Shoal Lake Cree Nation -
PADCOM Potash Solution Mining Project
16 kilometres west of Russell -
Remediation of One Arrow First Nation River Lot 62
One Arrow IR 95 -
Shoal Lake Cree Nation New Subdivision
Shoal Lake Indian Reserve No. 28A -
Shoal Lake Cree Nation New Subdivision
Shoal Lake Cree Nation -
Upgrade Single Tower & New Fibre Installation
Project site 4: Central East region - Pakwaw Lake -
Tootinaowaziibeeng - CHRT 41 - Wellness Centre
Tootinaowaziibeeng -
Tootinaowaziibeeng - CHRT 41 - Jordan's Principle - Multiple Buildings - 2324
Tootinaowaziibeeng - CHRT 41 - Jordan's Principle - Multiple Buildings - 2324 -
Shoal Lake Cree Nation Road Repair and Upgrades
SHOAL LAKE INDIAN RESERVE NO. 28A -
Shoal Lake Cree Nation Mini Mall Project
Shoal Lake Cree Nation -
Shoal Lake Cree Nation Teacherage Improvements
Shoal Lake Indian Reserve No. 28A -
Restoring Wetlands Within the Lake Winnipeg Basin with Cowessess First Nation NW-23-14-05-2
Cowessess First Nation -
RM Shellbrook Gravel Permit
Sturgeon Lake First Nation -
Shellbrook Sand & Gravel Permit
Sturgeon Lake IR 101 -
Fuel Reduction Program for Batoche National Historic Site
Batoche National Historic Site -
Batoche Drainage Improvement
Grasslands National Park -
Replacement of the Fuel Transfer Station and Fuel Tank Systems
17 Wing Detachment Dundurn -
Install Security Fence along Pryor Road at 17 Wing Detachment Dundurn
17 Wing Detachment Dundurn