Fisher River Cree Nation (FRCN) On-Reserve Permanent Diking
This is a non-designated project on federal lands or outside Canada. The listed authorities are responsible for the project assessment.
The Fisher River Cree Nation (FRCN) On-Reserve Permanent Diking ("The Project") has been developed to protect residences and critical infrastructure on reserve in Fisher River Cree Nation at risk from annual flooding of the Fisher River. The project that includes the following phases: 1a, 1b, and 2. Phase 1a consists of the immediate construction of permanent on-reserve diking to protect homes, critical infrastructure, and local road access, with a targeted construction date start date in August 2026. Phase 1b will consist of raising provincial roads and bridges to maintain access to the community and surrounding area during emergency flood events, with a target goal to be fully completed by 2028. Phase 2 is the development of long-term flood mitigation works to reduce the overall frequency and severity of flooding for which a completion date has yet to be defined.
This environmental review is only related to Project Phase 1a. Further environmental review will be required for the subsequent phases of the Project (Phase 1b and 2).
General Phase 1a Project Activities are on reserve and include the following:
· Construction of permanent sub-division dikes and individual dikes for homes that are most at risk of annual flooding
· A portion of one subdivision dike is located within the southern edge of Fisher Bay Provincial Park
· Development and use of borrow area (s) on reserve
· Raising of on reserve access roads where required
· Drainage improvements, including installation of culverts and widening of ditches where required
· Temporary stream crossings where required
· Tree clearing only where necessary
· Improve/maintain haul roads if necessary
· Development of temporary laydown and camp areas
Fisher River Cree Nation (FRCN) is the proponent of this work and will be providing permitting and authorizations relevant to the FRCN Land Code. As well, all project activities must conform to the Fisher River Cree Nation Land Code. Indigenous Services Canada (ISC) is funding this work. Manitoba Transportation and Infrastructure (MTI) is providing the expertise and resources needed to support planning, design, and construction.
Department of Fisheries and Oceans (DFO) will be engaged given the proximity to the Fisher River and associated tributaries. Manitoba Environment and Climate Change (ECC) will be engaged for any works in Fisher Bay Provincial Park.
All works related to Phase 1a of the Project will be on reserve, except where noted above, and all works are adjacent to the Fisher River. The Fisher River is considered a navigable watercourse within the project footprint. While borrow areas are not located within 100m of the Fisher River or any other navigable watercourse, portions of the individual and multiple property dikes may be within 30m of the Fisher River and associated tributaries. Phase 1a of the project does not anticipate works that will impact a navigable watercourse.
Latest update
Participate
Key documents
| Document number | Document title | File | Date |
|---|---|---|---|
| 1 | Fisher River Cree Nation (FRCN) On-Reserve Permanent Diking | - | July 24, 2026 |
Contacts
Indigenous Services Canada (ISC)Shelly Johnson, Senior Environmental Specialist
200 - 365 Hargrave Street
Winnipeg, Manitoba R3B 3A3
Telephone: 204-227-3891
Email: shelly.johnson@sac-isc.gc.ca
Disclaimer
This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.
-
Location
- Fisher River First Nation (Manitoba)
-
Nature of Activity
- Dams and reservoirs
-
Assessment Status
In progress -
Start Date
2026-07-24 -
Proponent
Fisher River First Nation -
Authorities
- Fisheries and Oceans Canada
- Indigenous Services Canada
-
Assessment Type
Project on federal lands -
Reference Number
90667
Nearby assessments
...within 200 kilometres-
Fisher River Cree Nation Jordan Principle Building
Fisher River Cree Nation -
Goldeye Lake Drive Subdivision
Fisher River Cree Nation -
Fisher River Used Oil Burner Installation
Fisher River Cree Nation -
Fisher River Cree Nation East Road Replacement Project
Fisher River Cree Nation Reserve no. 44 -
Hydrometric Station Decommissioning - Fisher River, Manitoba
Fisher River, Manitoba -
Peguis First Nation Recreation Centre Soil Remediation
Peguis First Nation Recreation Centre Soil Remediation -
Peguis First Nation - Recovery Housing 30 Homes & 6-Plex
Peguis First Nation -
Xplornet Communications Inc. Radiocommunication Antenna Addition on Peguis First Nation Reserve No. 269
Peguis First Nation Reserve No. 269 -
New Peguis First Nation Radiocommunication Tower in Peguis, MB
Peguis, MB -
Sugar Creek Peat Harvesting Project
Fisher River Cree Nation -
Launch Ramp Replacement, Pine Dock, Manitoba
Pine Dock -
Launch Ramp Replacement, Matheson Island, Manitoba
Matheson Island -
Launch Ramp Reconstruction - Calders Dock, MB - Fall 2021
Calders Dock Harbour -
Wharf Reconstruction - Little Grindstone, MB - Winter/Spring 2020
Little Grindstone Harbour -
Launch Ramp Reconstruction - Riverton, Manitoba
Riverton, Manitoba -
ENV - 268 - EA - ERP - Kinonjeoshtegon - CHRT 41 - JP New Building and Renovation - P057361 - 2425
Kinonjeoshtegon First Nation -
Launch Ramp Reconstruction - Gull Harbour, MB - Fall 2021
Gull Harbour -
Float Replacement, Hecla, Manitoba
Hecla, Manitoba -
Gull Harbour Lighthouse Rebuild
Gull Harbour -
Hnausa – Wharf Replacement Project
Hnausa -
Hnausa Harbour Manitoba - Harbour Dredging of Lake Winnipeg at Hnausa - Winter 2020-21
Hnausa Harbour -
Hnausa Harbour, Manitoba - FFMC Barge Loading Ramp Construction - Winter 2021
Hnausa Harbour -
Bloodvein First Nation Environmental Remedial Actions - 5 PHC Sites
Bloodvein First Nation -
New (Multiple) Tower Construction or Upgrade & New Fibre Installation
Project site 2: BCN-BLD-TW2 -
Bloodvein First Nation Environmental Remedial Actions - 5 PHC Sites
Bloodvein First Nation -
New (Multiple) Tower Construction or Upgrade & New Fibre Installation
Project site 1: BCN-BLD-TW1 -
New (Multiple) and Upgrades (Multiple) Radiocommunications Towers
Bloodvein -
Bloodvein First Nation Environmental Remedial Actions - 5 PHC Sites
Bloodvein First Nation -
Bloodvein River Airport Wildlife Fencing
Bloodvein River -
Lake Manitoba and Lake St. Martin Outlet Channels Project
Lake St. Martin Outlet Channel outlet on Lake Winnipeg -
Bloodvein First Nation School
Bloodvein School -
Bloodvein First Nation Environmental Remedial Actions - 5 PHC Sites
Bloodvein First Nation -
Bloodvein First Nation Environmental Remedial Actions - 5 PHC Sites
Bloodvein First Nation -
Bloodvein First Nation CFS Prevention Building
Bloodvein First Nation -
Bloodvein First Nation Staff Housing
Bloodvein First Nation -
Bell MTS Radiocommunication Tower on Bloodvein Reserve No. 12
Bloodvein Reserve No. 12 -
New (Multiple) Tower Construction or Upgrade & New Fibre Installation
Project site 3: BCN-BLD-TW3 -
Lake Manitoba and Lake St. Martin Outlet Channels Project
Lake St. Martin Outlet Channel inlet on Lake St. Martin -
Dauphin River Harbour Manitoba - Routine Maintenance Dredging of the Dauphin River at Lake Winnipeg - Winter 2019
Dauphin River Harbour -
Dauphin River Small Craft Harbour Dredging and Pile Installation
Dauphin River Small Craft Harbour -
Arnes Harbour Manitoba - Routine Maintenance Dredging of the Drunken River at Lake Winnipeg - Winter 2019
Arnes Harbour -
New Fibre Installation - Dauphin River
Project site 1: Anama Bay -
Lake Manitoba and Lake St. Martin Outlet Channels Project
Lake Manitoba Outlet Channel outlet on Lake St. Martin -
Lake St. Martin - Water Treatment Plant Zebra Mussels Control
Lake St. Martin -
McBeth Point Harbour Improvements
McBeth Point Harbour -
Lake Manitoba and Lake St. Martin Outlet Channels Project
Lake Manitoba Outlet Channel inlet in Lake Manitoba -
Hollow Water Wharf Construction
Hollow Water -
New Tower Construction, Upgrade single tower & New Fibre Installation
Project site 4: Hollow Water No. 10 -
New Fibre Installation
Hollow Water First Nation no.10 -
Hollow Water - CHRT 41 - Staff Accommodations - 2324
Hollow Water - CHRT 41 - Staff Accommodations - 2324 -
Hollow Water First Nation Prevention Centre
Hollow Water First Nation -
Hollow Water First Nation Transitional Spaces
Hollow Water First Nation -
New Fibre Installation - Dauphin River
Project site 2: Obushkudayang Indian Reserve -
Little Saskatchewan First Nation - Mino-Aya-Win Centre
Little Saskatchewan First Nation -
Pinaymootang First Nation Water Treatment Upgrades
Pinaymootang First Nation -
Valley Fiber Limited Radiocommunication Tower on Fairford First Nation Reserve No. 50
Fairford First Nation Reserve No. 50 -
Gimli Harbour Launch Ramp Reconstruction - Gimli, MB - Winter 2021/22
Gimli Harbour, Gimli, MB -
Lake Manitoba - South Access Road Upgrades - 2324
Lake Manitoba -
Chief Elsie Bouchie Culture Camp
Pigeon River 13A -
Lake Manitoba First Nation - CHRT41 FNCFS Prevention Centre
Lake Manitoba First Nation -
New Broadband Communications North Inc. Telecommunication Tower at Lake Manitoba First Nation on Dog Creek Reserve No. 46
Lake Manitoba First Nation, MB -
New Fibre Installation
Project site: Various parts of Manitoba -
Victoria Beach Hydrometric Stilling Well Removal - Winter 2024
Victoria Beach Harbour -
Victoria Beach Harbour Manitoba - Routine Maintenance Dredging of Lake Winnipeg at Victoria Beach - Winter 2019
Victoria Beach Harbour -
Black River First Nation Watermain Renewal Project
Black River First Nation -
Xplornet Communications Inc. Radiocommunication Antenna Addition on Black River First Nation Reserve No. 260
Black River First Nation Reserve No. 260 -
New Fibre Installation
Black River First Nation no. 9 -
Black River First Nation Prevention Centre
Black River First Nation -
Black River Waste Transfer Station
Black River Reserve -
Black River First Nation - Transitional Housing
Black River First Nation -
Berens River 13 Rapid Housing Fourplexes
Berens River 13 -
Project 4 - All-Season Road Connecting Berens River to Poplar River First Nation
East side of Lake Winnipeg, between Poplar and Berens Rivers -
Berens River Bridge Replacement
Berens River First Nation -
Berens River First Nation Road Upgrades
Berens River -
New (Multiple) Tower Construction or Upgrade & New Fibre Installation
Project site 5: BCN-BRR-TW2 -
Harbour Improvements - Berens River - Sigurdsson Island, MB
Berens River -
Berens River Harbour Launch Ramp Reconstruction
Berens River Small Craft Harbours -
Berens River Small Craft Harbour Breakwater Repairs and Pile Installation
Berens River - Sigurdsson Island Small Craft Harbour -
Berens River Water Treatment Plant Upgrade
Berens River First Nation -
New Tower Construction, Upgrade single tower & New Fibre Installation
Project site 3: Berens River 13 -
New (Multiple) Tower Construction or Upgrade & New Fibre Installation
Project site 4: BCN-BRR-TW1 -
Berens River Emergency Temporary School
Berens River First Nation -
New (Multiple) Tower Construction or Upgrade & New Fibre Installation
Project site 6: BCN-BRR-TW3 -
Sagkeeng First Nation - Shoreline Stabilization - Segment 4
Sagkeeng First Nation -
Traverse Bay Shoreline Stabilization - Site A (North Shoreline)
Traverse Bay North Shoreline - Fort Alexander Reserve -
Ebb and Flow First Nation - Road and Drainage Upgrades
Ebb and Flow First Nation -
Sagkeeng (Fort Alexander) Assisted Living Complex
Sagkeeng First Nation -
Sagkeeng First Nation - Hybrid Green Infrastructure Shoreline Protection
Sagkeeng First Nation - Hybrid Green Infrastructure Shoreline Protection -
Launch Ramp Replacement, Balsam Bay, Manitoba
Balsam Bay, Manitoba -
Xplornet Inc. Radiocommunication Antenna Addition on Ebb and Flow First Nation Reserve No. 280
Ebb and Flow First Nation Reserve No. 280 -
CSC97 - Ebb and Flow First Nation Water Supply Line Project
Ebb and Flow First Nation -
Rockwood National Wildlife Area Water Control Structure Re-naturalization Project
Rockwood National Wildlife Area -
Sandy Bay First Nation New Water Treatment Plant
Sandy Bay First Nation -
O-Chi-Chak-Ko-Sipi First Nation Water Treatment Plant Upgrades
O-Chi-Chak-Ko-Sipi First Nation Water Treatment Plant Upgrades -
New Fibre Installation - Sandy Bay
Project site: Sandy Bay -
Sandy Bay First Nation CFS Prevention Center Temporary Facilities (10 RTMs)
Sandy Bay First Nation -
Brokenhead Ojibway Nation Elders Lodge Project
Brokenhead Ojibway Nation -
Brokenhead Ojibway Nation - Elder's Lodge - 2324
Brokenhead Ojibway Nation - Elder's Lodge - 2324 -
Brokenhead - CHRT41 - Jordan's Principle Building/Centre for BON - 2324
Brokenhead Jordan's Principle Centre -
Multi-use Arbour & Powwow Grounds on Brokenhead Reserve
Scanterbury on the Brokenhead Reserve -
Brokenhead Ojibway Nation Land Base Building
Brokenhead Ojibway Nation - Reserve No. 4 -
Brokenhead Ojibway Nation - Cultural Healing Lodge Development
Brokenhead Ojibway Nation -
Selkirk CCG Asphalt paving
Selkirk Coast Guard Base -
Lower Fort Gary Wastewater Treatment Plant Outflow Pipe Replacement
Lower Fort Garry National Historic Site -
Little Grand Rapids Dock & Dock Foundation Posts
Little Grand Rapids -
Little Grand Rapids RCMP New Living Quarters
Little Grand Rapids -
Southeast CFS Little Grand Rapids Staff Housing (Personnel and Visiting Professionals) and Prevention Centre
Little Grand Rapids First Nation -
St. Andrews Lock and Dam Bridge Deck Replacement
St. Andrews Lock and Dam -
Little Grand Rapids First Nation School
Little Grand Rapids First Nation School -
Aboveground Fuel Storage Replacement in Little Grand Rapids, Manitoba
Little Grand Rapids -
Little Grand Rapids Submarine Cable Installation Project
Little Grand Rapids -
Little Grand Rapids First Nation Transitional Housing (Temporary Housing)
Little Grand Rapids First Nation -
Wharf Demolition and Reconstruction - George Island, MB - Summer 2020/Winter 2021
George Island Harbour -
Manitoba-Minnesota Transmission Project
Riel Converter Station, near Dorsey, Manitoba -
Skownan New Child and Family Services Prevention Building
Skownan First Nation -
Skownan First Nation Waste Site Closure and Eco-Depot Facility
Skownan First Nation -
Pauingassi First Nation Child and Family Services Prevention Building and Staff Housing
Pauingassi First Nation -
T-91 VORTAC Site Decommissioning
Winnipeg Richardson International Airport -
Poplar River First Nation Water Treatment Plant
Poplar River First Nation -
Avis overflow storage compound Sherwin Road - Decommissioning
Winnipeg Richardson International Airport -
Airport West Perimeter Road and Primary Security Line Relocation
Winnipeg Richardson International Airport -
Winnipeg Airport West Lands Moray Street Extension and Site Servicing
Winnipeg Richardson International Airport -
In Situ Decommissioning of the Whiteshell Reactor #1
Pinawa -
Generator Replacement and Fire Panel Upgrade at existing Hangar building
Winnipeg Richardson International Airport (YWG) -
T-145 STARS Hangar Addition
Winnipeg Richardson International Airport -
T-283 SkyNorth Air Apron Pavement Expansion project
Winnipeg Richardson International Airport -
Runway 18-36 Rehabilitation at YWG
Winnipeg Richardson International Airport -
Air Canada Hangar T-149 water supply refurbishment project
Winnipeg Richardson International Airport -
T-149 & T-150 Air Canada Hangar, Petroleum Storage System Upgrades
Winnipeg Richardson International Airport -
Electric Bus Charging Station Removal and Demolition
Winnipeg Richardson International Airport -
Upgrade of 17 Wing Vehicle Fuel Farm - 17 Wing Winnipeg
17 Wing Winnipeg -
YWG Groundside Roadway Infrastructure Upgrade Project
Winnipeg Richardson International Airport -
T-201 Standard Aero Plant 6 Building Expansion
Winnipeg Richardson International Airport -
2023 YWG Airfield Improvements Project
Winnipeg Richardson International Airport -
East Side Air Cargo Development at Winnipeg Richardson International Airport (YWG)
Winnipeg Richardson International Airport -
17 Wing Winnipeg - V6600 Disposal of 13 RHUs and 18 Garages (South Site)
17 Wing Winnipeg -
2026 Airfield Improvements Project
Winnipeg Richardson International Airport -
Perimeter Aviation T-5 Hangar Door Replacement
Winnipeg Richardson International Airport -
Perimeter Aviation Terminal Building Expansion
Winnipeg Richardson International Airport -
Keewatin Air T-216 Hanger - Medevac Facility Addition
Winnipeg Richardson International Airport -
East Trails Project - East Gate
Riding Mountain National Park -
Energy East Project
Winnipeg -
New electrical service to existing building at 80 Hangar Line Road
Winnipeg Richardson International Airport (YWG) -
Perimeter Aviation LP Parking Lot
Winnipeg Richardson International Airport -
New (Multiple) Tower Construction & New Fibre Installation
Mosakahiken Cree Nation (Moose Lake), Northern Manitoba -
Hangar Line Road Extension - 17 Wing Winnipeg
17 Wing Winnipeg -
Pond and Landscape Upgrade at the Winnipeg Tax Centre
Winnipeg -
Temporary Dock - The Forks National Historic Site, Red River, MB
The Forks National Historic Site, Winnipeg -
Naawi Oodena - Subdivision - Parcel A - 2324
Naawi Oodena -
Launch Ramp Reconstruction - Mossey River, MB - Fall 2021
Mossey River Harbour -
Dakota Tipi First Nation - New Jordan's Principle Facility
Dakota Tipi First Nation -
Project 4 - All-Season Road Connecting Berens River to Poplar River First Nation
-
Poplar River First Nation School
Poplar River Manitoba School -
Escarpment Trailhead Sign Replacement and New vault Privy
Riding Mountain National Park -
Poplar River First Nation - Community Wharf
Poplar River First Nation -
Poplar River Harbour Manitoba - Routine Maintenance Dredging of the Poplar River at Lake Winnipeg - Winter 2019
Poplar River Harbour -
Poplar River - Harbour Improvements
Poplar River -
Poplar River Bridge Replacement
Poplar River First Nation -
New (Multiple) and Upgrades (Multiple) Radiocommunications Towers
Poplar River -
New Tower Construction, Upgrade single tower & New Fibre Installation
Project site 1: Poplar River 16 Tower 1 -
New Tower Construction, Upgrade single tower & New Fibre Installation
Project site 2: Poplar River 16 Tower 2 -
Teacherages Project (Site Servicing)
Poplar River First Nation -
Modification to Poplar River First Nation Radiocommunication Tower at Poplar River, MB
Poplar River -
Poplar River First Nation Lagoon Expansion
Poplar River First Nation -
Freshwater Institute Underground Chilled Water Piping Replacement
Freshwater Institute in Winnipeg, MB -
City of Winnipeg Insect Control Branch and Heliport Relocation Project
City of Winnipeg -
Highway 19 Roadway Rehabilitation Addendum 2 Swanson Creek Culvert
Riding Mountain National Park -
Vivian Sand Project
Springfield -
Pine Creek and Ebb and Flow - Anishinaabe Aki Petro-Can Gas Bar in Dauphin, MB - 2425
Dauphin -
Long Plain FN - Directional Drilling - Water and Sewer Pipeline
Long Plain First Nation -
New Staff Campground for Riding Mountain National Park
Riding Mountain National Park -
Long Plain - CHRT41 - Prevention Centre - P055810 - 2324
Long Plain First Nation -
Long Plain School Renovation & Addition
Long Plain First Nation -
Clear Lake Cabin Area Kayak Launch Site
Riding Mountain National Park -
Edwards Creek Trail Upgrade Proposal
Riding Mountain National Park of Canada -
Northgate-Riding Mountain National Park Trail Expansion
Riding Mountain National Park of Canada -
Highway 19 Urgent Maintenance, Ditch Development and Culvert Replacements
Riding Mountain National Park of Canada -
Boreal Trail Reconstruction
Riding Mountain National Park of Canada -
Long Plain First Nation - Water Treatment Plant Upgrades
Long Plain First Nation -
Grey Owl Parking Lot Privy and Reroute
Riding Mountain National Park -
Clear Lake Golf Course Clubhouse Patio
Riding Mountain National Park of Canada -
North Shore Hydro Distribution Line Rebuild
Riding Mountain National Park of Canada -
MB Hydro Pole and Arm Replacement
Riding Mountain National Park of Canada -
Utility Service Agreement BELL MTS Inc. Moon Lake Telecommunications Tower
Riding Mountain National Park -
Dakota Women's Lodge (Winyan Tipi)
Portage la Prairie -
Wasagaming Wildfire Risk Reduction 2023-2026
Riding Mountain National Park -
New Fibre Installation
Riding Mountain National Park -
Hydro - North Shore Line Project
Riding Mountain National Park of Canada -
2026-2029 Wildfire Risk Reduction Wasagaming
Riding Mountain National Park of Canada -
Westman Communications Fibre Optic throughout Wasagaming
Riding Mountain National Park of Canada -
Mooswa East Water Line
Riding Mountain National Park -
Lakeshore Trail Re-design
Riding Mountain National Park of Canada -
Clear Lake Pier Repairs
Riding Mountain National Park of Canada -
New Resort Development - 116 TaWaPit Drive, Wasagaming
Riding Mountain National Park -
Northeast end of Clear Lake Cabin area storm water catch basin, drainage pipe and dissipation pool
Riding Mountain National Park -
Westman Communications Fiber - Phase 2 - Clear Lake Cabin Area
Riding Mountain National Park of Canada -
Management of Zebra Mussels in Clear Lake in Riding Mountain National Park
Riding Mountain National Park of Canada -
New Cabin 56-4th St. S. Clear Lake Cabin Area
Riding Mountain National Park of Canada -
Research, Monitoring and Management of Invasive Smallmouth Bass in Clear Lake, Riding Mountain National Park
Riding Mountain National Park -
Tiger Salamander Crossing
Riding Mountain National Park -
Westman Communications Fiber Optic Cable
Riding Mountain National Park -
Ominnik Marsh Trail Anchor System & Boardwalk Replacement
Riding Mountain National Park of Canada -
Ominnik Marsh Trail Accessibility Reroute
Riding Mountain National Park -
Smallmouth Bass Project
Riding Mountain National Park