Bigstone Cree Nation High School Waterline Project

Bigstone Cree Nation plans to install a water pipeline to the high school to increase water conveyance capacity. The proposed project will involve installation of a new  250 mm water pipeline that is 950 m in length via horizontal directional drilling. The new water pipeline will be connected to the existing 150 mm pipeline at the school site to form a loop that can increase the reliability of water distribution.


Disclaimer

This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.

 

Latest update

August 11, 2022 – Indigenous Services Canada issued its notice of determination Bigstone Cree Nation High School Waterline Project - Canada.ca (iaac-aeic.gc.ca) and determined that the project is not likely to cause significant adverse environmental effects.

.

Participate

Contacts

Cassandra Breton
Indigenous Services Canada
Cassandra Breton, Environment Officer
630 Canada Place 9700 Jasper Ave, Edmonton AB
Edmonton, Alberta T5J 4G2
Telephone: 587-338-7033
Email: cassandra.breton@sac-isc.gc.ca


  • Location

    • Wabasca (Alberta)
  • Nature of Activity

    • Water Management
  • Assessment Status

    Completed
  • Start Date

    2022-05-27
  • Proponent

    Bigstone Cree Nation
  • Authorities

    • Indigenous Services Canada
  • Assessment Type

    Project on federal lands
  • Reference Number

    83671

Nearby assessments

...within 200 kilometres
Date modified: