Bigstone Cree Nation High School Waterline Project
This is a non-designated project on federal lands or outside Canada. The listed authorities are responsible for the project assessment.
Bigstone Cree Nation plans to install a water pipeline to the high school to increase water conveyance capacity. The proposed project will involve installation of a new 250 mm water pipeline that is 950 m in length via horizontal directional drilling. The new water pipeline will be connected to the existing 150 mm pipeline at the school site to form a loop that can increase the reliability of water distribution.
Latest update
.
Participate
Key documents
Document Number | Document Title | File | Date |
---|---|---|---|
2 | Notice of Determination for the Bigstone High School Waterline Project | - | August 11, 2022 |
1 | Bigstone Cree Nation High School Waterline: Public Comment Period on Intent to Make a Determination | - | May 27, 2022 |
Contacts
Cassandra BretonIndigenous Services Canada
Cassandra Breton, Environment Officer
630 Canada Place 9700 Jasper Ave, Edmonton AB
Edmonton, Alberta T5J 4G2
Telephone: 587-338-7033
Email: cassandra.breton@sac-isc.gc.ca
-
Location
- Wabasca (Alberta)
-
Nature of Activity
- Water Management
-
Assessment Status
Completed -
Start Date
2022-05-27 -
Proponent
Bigstone Cree Nation -
Authorities
- Indigenous Services Canada
-
Assessment Type
Project on federal lands -
Reference Number
83671
Disclaimer
This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.
Nearby assessments
...within 200 kilometres-
New Fibre Installation
Project Site 1 - Bigstone Cree Nation: -
Bigstone Cree First Nation Flood Recovery Program: Culvert 166A-17 TSAG ID No. 03 Replacement
Bigstone Cree Nation -
Bigstone Cree First Nation Flood Recovery Program: Culvert 166A-18 TSAG ID No. 04 Replacement
Bigstone Cree Nation -
Bigstone Cree First Nation Flood Recovery Program: Culvert 166A-10 TSAG ID No. 07 Replacement
Bigstone Cree Nation -
Bigstone Cree Nation New High School
Bigstone Cree Nation -
Bigstone Cree Nation Education Authority: CU254 Oksi Pasikoniwew Kakik School Secondary Access Road Project
Bigstone Cree Nation -
Bigstone B.O.S.S Modular Construction and Fabrication Yard Expansion Project
Bigstone Cree Nation -
Bigstone Cree Nation Oilfield Supply Store
Wabasca #166 -
ATCO Gas and Pipelines Ltd.: 1088866 Wabasca IR No. 166A Gas Distribution Extension
Bigstone Cree Nation Wabasca IR No. 166A -
New Fibre Installation
Project Site 2 - Wabasca No. 166B : -
OS-7241 Wabasca IR 166D | Authorization to Construct and Operate a Surface Lease for an access road and for a multiwell pad
Wabasca IR # 116D -
New Fibre Installation
Project Site 4 - Wabasca No. 166D: -
Bigstone Cree First Nation Flood Recovery Program: Culvert 166D-27 Replacement
Bigstone Cree Nation -
Bigstone Cree First Nation Flood Recovery Program: Culvert 166D-08 TSAG ID No. 08 Replacement
Bigstone Cree Nation -
Bigstone Cree Nation & Hamlet of Sandy Lake - ATCO Gas and Pipelines Ltd.: 1088866 - Gas Feeder and Mains at Wabasca IR No. 166
Bigstone Cree Nation -
New Fibre Installation
Project Site 5 - Wabasca No. 166: -
Bigstone Cree Nation ATCO Gas and Pipelines Ltd.: 1098480 Wabasca IR No. 166 Phase 2 Alfred Road Gas Main & Distribution System
Bigstone Cree Nation -
Wabasca Water Treatment Plant Upgrades Project
Wabasca -
New Fibre Installation
Project Site 3 - Wabasca No. 166C: -
Pelican Renewable Generating Station Project
180 kilometres upstream of Fort McMurray -
Sundog Renewable Generating Station Project
130 kilometres upstream of Fort McMurray -
Rogers Communications Inc., new radiocommunications tower (W6238) on Peerless Trout First Nation land, near Trout Lake, AB.
W6238 - Peerless Trout First Nation Land (near Trout Lake) -
Sawridge Band Solar Farm Project
Sawridge Band -
North Corridor Expansion Project
Peerless Lake -
Rogers Communications Inc., new radiocommunications tower (W6225) on Peerless Trout First Nation land, near Peerless Lake, AB.
W6225 - Peerless Trout First Nation Land (near Peerless Lake) -
Loon River First Nation: CU344 Main Access Road Upgrade Project
Loon River First Nation -
Loon River First Nation Industrial Park Warehouse
Loon River First Nation -
Loon River First Nation North Central Corridor Loop Temporary Contractor Yard
Loon River First Nation -
Atikameg Healing Shelter for Women and Children
Whitefish Lake First Nation -
Whitefish Lake Fire Guard Project
Whitefish Lake First Nation 155 -
Loon River First Nation Water Treatment Plant Upgrades Design Construction
Loon River First Nation -
Loon River First Nation: CU363 Emergency Wastewater System Repairs
Loon River First Nation -
Loon River First Nation Bridge Replacement over Loon River
Loon River First Nation -
Loon River First Nation: Industrial Park Grocery Store
Loon River Cree Nation -
Loon Lake Cree Nation Pure Fibre Network Project
Loon River Cree Nation -
Swan River First Nation Housing Project 2019 (5-Units)
Swan River First Nation -
New Fibre Installation
Swan River 150E -
Swan River First Nation: Wastewater Lagoon Liner Repair & Sub-liner Drainage Upgrade
Swan River First Nation -
Swan River First Nation Waste Diversion and Recycling Facility
Swan River First Nation -
Swan River First Nation Lakefront Development Project
Lesser Slave Lake -
North Corridor Expansion Project
Highway 88 -
Driftpile Cree Nation Lift Station No. 1 Replacement Project
Driftpile Cree Nation -
Driftpile Cree Nation Housing Project
Driftpile Cree Nation -
Driftpile Cree Nation New Housing Construction Project
Driftpile, AB -
DCN 2023 Rapid Housing Project
DCN 2023 Rapid Housing Project -
Driftpile Cree Nation Gas Line Connector Project
Driftpile Cree Nation -
Joussard Harbour Alberta - Routine Maintenance Dredging of the Joussard Harbour at Lesser Slave Lake Alberta - over the next year
Joussard Harbour -
Meanook National Wildlife Area Buildings Demolition
Meanook National Wildlife Area -
Woodland Cree CMHC Co-Investment Housing Project - Marten Lake Subdivision (10-Units)
Cadotte Lake -
Kapawe'no Adventure Trail Project
Kapawe'no Adventure Trail Project -
Upgrade (Multiple) Tower
Project Site 1: Kapawe'no FN 150B -
Kapawe'no First Nation Echo Prairie Waterline Project
Kapawe'no First Nation -
Sucker Creek Housing Project 2020 (4 Units)
Sucker Creek First Nation -
Three Unit Modular Housing Project
Sucker Creek First Nation -
Sucker Creek First Nation Water System Upgrades
Sucker Creek First Nation -
Upgrade (Multiple) Tower
Project Site 2: Sucker Creek FN 150A -
New Fibre Installation
Project site 2: Regional Municipality of Wood Buffalo -
Fort McMurray First Nation: Gregoire Lake Water and Sewage Project
Gregoire Lake -
ATCO Gas and Pipelines Ltd.: 1088748 Gregoire Lake IR No. 176A Lakeshore Drive Gas Distribution System Extension
Fort McMurray First Nation -
Fort McMurray First Nation Water and Wastewater Infrastructure
Fort McMurray First Nation -
Suncor Base Mine Extension Project
3 kilometres north of Fort McMurray -
2017 NGTL System Expansion Project
Fort McMurray -
Clearwater Multi-User Access Project, Alberta
Clearwater River -
New Fibre Installation
Project site 3: Regional Municipality of Wood Buffalo -
Heart Lake First Nation: Inter-jurisdictional Access Road
Heart Lake First Nation #167 -
New Fibre Installation
Project Site 1 - Heart Lake: -
Heart Lake BF 80752 Bridge Replacement
Heart Lake First Nation -
Heart Lake First Nation: CU370 Wastewater System Emergency Repairs
Heart Lake First Nation -
OS-7244 Woodland Cree 226
Woodland Cree 226 -
OS-7239 Woodland Cree 226
OS-7239 -
Beaver Lake Cenovus Housing Initiative - Build Out of 20 Residential Lots, Access Roads, and Water Distribution
Beaver Lake Cree Nation -
Woodland Cree 226
OS-7238 -
Beaver Lake Cree Nation Fiber Optic Internet Infrastructure - Universal Broadband Fund Project
Beaver Lake Cree Nation -
Beaver Lake Cree Nation New High School and Resource Centre
Beaver Lake Cree Nation -
Suncor Energy Coke Fired Boiler Replacement Project
25 kilometres north of Fort McMurray -
OS-7245 Woodland Cree Reserve 226
Woodland Cree 226 -
Woodland Cree CMHC Co-Investment Housing Project - Simon Lake Subdivision (21-Units)
Woodland Cree First Nation -
Fort McKay First Nation K-9 School
Fort McKay First Nation -
New Fibre Installation
Project site 1: Regional Municipality of Wood Buffalo -
ATCO Gas and Pipelines: 1091764 North Janvier Natural Gas Delivery Pipeline Upgrade Project
Chipewyan Prairie First Nation -
New Fibre Installation
Project site 4: Regional Municipality of Wood Buffalo -
Chipewyan Prairie First Nation 2021 Subdivision Project (Phase 1)
Chipewyan Prairie First Nation -
Chipewyan Prairie First Nation Janvier Secondary Egress Road
Chipewyan Prairie First Nation -
Wolverine River Lateral Loop (Carmon Creek Section)
Carmon Lake -
Fort McKay First Nation: 2023/24 Residential Redevelopment Project
Fort McKay First Nation -
Chipewyan Prairie First Nation Housing Project 2020-21 (5 Units)
Chipewyan Prairie First Nation -
Wolverine River Lateral Loop (Carmon Creek Section)
Jackpine Lake