Chipewyan Prairie First Nation 2021 Subdivision Project (Phase 1)
This is a non-designated project on federal lands or outside Canada. The listed authorities are responsible for the project assessment.
12 lot subdivision within approximately 56 ha. Each lot will be approximately 60m wide by 68m deep. Tied into existing services with approximately 700m of new roadway and associated culverts.
Latest update
December 9, 2021 – Indigenous Services Canada issued its notice of determination https://iaac-aeic.gc.ca/050/evaluations/document/142352 and determined that the project is not likely to cause significant adverse environmental effects.
Participate
Key documents
| Document number | Document title | File | Date |
|---|---|---|---|
| 2 | Notice of Determination | - | December 9, 2021 |
| 1 | Public Comment Period on Intent to Make a Determination | - | October 27, 2021 |
Contacts
Indigenous Services CanadaStacey LeBlanc, Sr. Environment Officer
630 Canada Place, 9700 Jasper Ave
Edmonton, Alberta T5J 4G2
Telephone: 780-782-8350
Email: stacey.leblanc@canada.ca
Disclaimer
This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.
-
Location
- Chipewyan Prairie First Nation (Alberta)
-
Nature of Activity
- Building and Property Development
-
Assessment Status
Completed -
Start Date
2021-10-27 -
Proponent
Chipewyan Prairie First Nation -
Authorities
- Indigenous Services Canada
-
Assessment Type
Project on federal lands -
Reference Number
83123
Nearby assessments
...within 200 kilometres-
1121393 - 0861 - SubD(13RUP) CPFN Janvier - Phase 2
Janvier -
New Fibre Installation
Project site 4: Regional Municipality of Wood Buffalo -
0861 - Upgrade (33 & 48 - 60mm) North Janvier
Janvier -
ATCO Gas and Pipelines: 1091764 North Janvier Natural Gas Delivery Pipeline Upgrade Project
Chipewyan Prairie First Nation -
Janvier Secondary Egress Road
Chipewyan Prairie First Nation -
Chipewyan Prairie First Nation Housing Project 2020-21 (5 Units)
Chipewyan Prairie First Nation -
Pathways Alliance CO2 Transportation Network and Storage Hub Project
Main Transportation Pipeline -
Chipewyan Prairie First Nation Wastewater Treatment Plant Expansion
Chipewyan Prairie First Nation -
Fort McMurray First Nation New Housing Construction Project
GREGOIRE LAKE NO. 176 -
Fort McMurray First Nation Water and Wastewater Infrastructure
Fort McMurray First Nation -
New Fibre Installation
Project site 3: Regional Municipality of Wood Buffalo -
ATCO Gas and Pipelines Ltd.: 1088748 Gregoire Lake IR No. 176A Lakeshore Drive Gas Distribution System Extension
Fort McMurray First Nation -
New Fibre Installation
Project site 2: Regional Municipality of Wood Buffalo -
Fort McMurray First Nation: Gregoire Lake Water and Sewage Project
Gregoire Lake -
Fort McMurray First Nation New Housing Construction Project
GREGOIRE LAKE NO. 176A -
Cenovus Foster Creek - North Trunk Gate (NTG) in Cold Lake Alberta
Cenovus Foster Creek - North Trunk Gate (NTG) -
Cenovus Energy SCADA system modification Project in Foster Creek on Cold Lake Weapons Range
Cenovus Energy SCADA system modification Project -
Cenovus Foster Creek - Maintenance in Cold Lake Alberta.
Cenovus Foster Creek - Maintenance -
2017 NGTL System Expansion Project
Fort McMurray -
Clearwater Multi-User Access Project, Alberta
Clearwater River -
La Loche Hotel
La Loche -
Regional Assessment of Beaver Lake Cree Nation's Asserted Traditional Territory
Lac la Biche -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
CLEARWATER RIVER DENE BAND NO. 222 (Tower 1) -
Armand Bekkattla Treatment Centre Recapitalization and Expansion
Clearwater River Dene Band 222 -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
CLEARWATER RIVER DENE BAND NO. 222 (Tower 2) -
Clearwater River Dene Subdivision
Clearwater River Dene IR 122 -
Canadian Natural Resources Limited - New radiocommunications towers on 06-09-069-04W4 and 11-04-069-04W4, Cold Lake Air Weapons Range, AB
06-09-069-04W4 -
Canadian Natural Resources Limited - New radiocommunications towers on 06-09-069-04W4 and 11-04-069-04W4, Cold Lake Air Weapons Range, AB
11-04-069-04W4 -
CNRL proposal to install two new radiocommunications towers on Beaver Lake Cree Nation within the boundary of the Cold Lake Air Weapons range.
P162 - Beaver Lake Cree Nation/Cold Lake Air Weapons Range -
Heart Lake First Nation - ATCO Gas Main Installation
Heart Lake First Nation -
CNRL proposal to install two new radiocommunications towers on Beaver Lake Cree Nation within the boundary of the Cold Lake Air Weapons range.
P71C - Beaver Lake Cree Nation/Cold Lake Air Weapons Range -
Canadian Natural Resources Limited - New radiocommunications tower on NW 34-68-4 W4M, Cold Lake Air Weapons Range, AB
NW 34-68-4 W4M. , Cold Lake Air Weapons Range, AB -
New Fibre Installation
Project Site 1 - Heart Lake: -
Heart Lake First Nation: Inter-jurisdictional Access Road
Heart Lake First Nation #167 -
Heart Lake ATCO Gas Distribution Project
Heart Lake First Nation -
Heart Lake First Nation: CU370 Wastewater System Emergency Repairs
Heart Lake First Nation -
Heart Lake First Nations antenna supporting structure located on the Heart Lake First Nations in Lac La Biche County
Heart Lake First Nations antenna supporting structure -
Heart Lake 3-Phase Powerline (Fortis# 500111166)
Heart Lake First Nation -
Heart Lake First Nation - Lift Station Replacement and Sanitary Sewer Line Install
Heart Lake First Nation -
New Fibre Installation
Project Site 2 - Heart Lake: -
Heart Lake Water Treatment Plant and Intake Design
Heart Lake First Nation -
Buffalo River Dene Nation School Bypass Road Relocation
Buffalo River Dene Nation -
Heart Lake BF 80752 Bridge Replacement
Heart Lake First Nation -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
BUFFALO RIVER DENE NATION I.R. 193 (Tower 1) -
Fixed Point-to-Point Link from Buffalo Narrows, SK to Dillon, SK
Buffalo River Dene Nation I.R. 193 -
Buffalo River Dene Nation Fire Hall
Peter Pond Lake Indian Reserve No. 193 -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
BUFFALO RIVER DENE NATION I.R. 193 (Tower 2) -
Buffalo River Dene Nation Solid Waste Transfer Station
BUFFALO RIVER DENE NATION RESERVE #193 -
Buffalo River Dene Nation Lagoon Expansion
BUFFALO RIVER DENE NATION RESERVE NO. 193 -
Buffalo River Dene Nation Subdivision Stage 4
Buffalo River Dene Nation IR 193 -
Sundog Renewable Generating Station Project
130 kilometres upstream of Fort McMurray -
Pelican Renewable Generating Station Project
180 kilometres upstream of Fort McMurray -
Suncor Base Mine Extension Project
3 kilometres north of Fort McMurray -
Suncor Energy Coke Fired Boiler Replacement Project
25 kilometres north of Fort McMurray -
Cold Lake Air Weapons Range (CLAWR) Culvert Replacement
4 Wing Cold Lake -
Replacement of Water Crossing and Road Alignment
Primrose Lake Evaluation Range -
Birch Narrows First Nation Solid Waste Transfer Station
Turnor Lake Indian Reserve 193B -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
TURNOR LAKE I.R. 193B (Tower 2) -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
TURNOR LAKE I.R. 193B (Tower 1) -
Birch Narrows Dene Nation Community Centre
Birch Narrows Dene Nation -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
TURNOR LAKE I.R. 193B (Tower 3) -
Pathways Alliance CO2 Transportation Network and Storage Hub Project
Carbon Capture Infrastructure and Lateral Pipelines -
Marguerite Lake Compressed Air Energy Storage Project
La Corey -
New Fibre Installation
Project site 1: Regional Municipality of Wood Buffalo -
Fort McKay First Nation: 2023/24 Residential Redevelopment Project
Fort McKay First Nation -
Fort McKay First Nation K-9 School
Fort McKay First Nation -
Beaver Lake Cenovus Housing Initiative - Build Out of 20 Residential Lots, Access Roads, and Water Distribution
Beaver Lake Cree Nation -
Beaver Lake Cree Nation Telus Telecommunications Tower
Beaver Lake Cree Nation -
Notice of Intent to Make a Determination - Start of Public Comment Period (TELUS Communications Inc (AB103721) Beaver Lake Indian Reserve No. 131 )
AB103721 - Beaver Lake Indian Reserve No. 131 -
Cold Lake First Nation Water System Upgrades
Cold Lake First Nation -
Beaver Lake New School
Beaver Lake Cree Nation -
Beaver Lake Cree First Nation Cardinal Drive Subdivision
Beaver Lake Cree Cardinal Drive Subdivision -
Beaver Lake Cree Nation Fiber Optic Internet Infrastructure - Universal Broadband Fund Project
Beaver Lake Cree Nation -
Beaver Lake Cree Nation New High School and Resource Centre
Beaver Lake Cree Nation -
Beaver Lake Cree Nation Water Treatment Plant
Beaver Lake Cree Nation -
Beaver Lake Cree Nation Medical Center
Beaver Lake Cree Nation -
Cold Lake First Nations LTE Fixed Wireless Upgrade Project
Existing Tower 3: Cold Lake -
Cold Lake First Nation: CUZD3 Phase II and III Water Distribution System
Cold Lake First Nation -
Cold Lake First Nation Subdivision Project
Cold Lake First Nation -
Cold Lake First Nation English Bay Gas Station Project
Cold Lake First Nation -
Cold Lake First Nations LTE Fixed Wireless Upgrade Project
New Tower 2: Cold Lake -
Cold Lake First Nations LTE Fixed Wireless Upgrade Project
Cold Lake -
Jackpine Mine Expansion Project
Fort McKay -
Cold Lake First Nations-Four Unit Housing Project 2024 2025
Cold Lake First Nations -
Campus Energy - Pipeline Replacement/Removal
4 Wing Cold Lake -
Building Demolition - 4 Wing Cold Lake
Cold Lake -
Building Demolition and Underground Fuel Line Removal - 4 Wing Cold Lake
4 Wing Cold Lake -
Demolition of Barrack Block 48 - 4 Wing Cold Lake
4 Wing Cold Lake -
Medley Extension – 4 Wing Cold Lake
4 Wing Cold Lake -
Snow and Ice Clearing (SNIC) Expansion – 4 Wing Cold Lake
4 Wing Cold Lake -
Maintenance, Repair, and Installation Work for Storage Tank Systems - Cold Lake Air Weapons Range and 4 Wing Cold Lake
Cold Lake Air Weapons Range and 4 Wing Cold Lake -
TERMINATED: Renovation of Building 325 - Pumphouse & Water Purification Plant (CL210010) - 4 Wing Cold Lake
4 Wing Cold Lake -
Construction of a Retail Warehouse - 4 Wing Cold Lake
4 Wing Cold Lake -
Relocation of the Deployable Maintenance Facility (DMF) Training Compound – 4 Wing Cold Lake
4 Wing Cold Lake -
21M Range Revitalization (CL220020) - 4 Wing Cold Lake
4 Wing Cold Lake -
The Design and Construction (Modified Design Build) of the New 4 Wing Quick Reaction Alert (QRA) Area– 4 Wing Cold Lake
4 Wing Cold Lake -
Replacement of Collapsed Storm Sewer Lines - 4 Wing Cold Lake
4 Wing Cold Lake -
Renovation of Building 325 – Cold Lake Air Weapons Range
Cold Lake Air Weapons Range -
Development of Hangars in the Quick Reaction Area – 4 Wing Cold Lake, Alberta
4 Wing Cold Lake -
ATCO Gas and Pipelines Ltd.: 1098480 Wabasca IR No. 166 Phase 2 Alfred Road Gas Main & Distribution System
Bigstone Cree Nation -
Department of National Defence Future Fighter Capability Project - Demolition of Hangars 6 and 7, and Construction of New Supporting Infrastructure
4 Wing Cold Lake, approximately 300 kilometers northeast of Edmonton -
New Fibre Installation
Project Site 5 - Wabasca No. 166: -
Power Grid Modernization - 4 Wing Cold Lake
4 Wing Cold Lake -
Bigstone Health Centre
Bigstone Cree Nation -
Cold Lake First Nation Housing Project 2019 (10 Unit Renovation)
Cold Lake First Nation -
ATCO Gas and Pipelines Ltd.: 1088866 Bigstone Cree Nation & Hamlet of Sandy Lake Gas Feeder and Mains at Wabasca IR No. 166
Bigstone Cree Nation -
Cold Lake First Nations: Casino Dene Expansion, Event Centre, Parking Project
Cold Lake First Nations -
Cold Lake First Nations Casino Expansion Project
Cold Lake First Nations -
Cold Lake First Nations Community Gathering Space
Cold Lake First Nations -
Cold Lake First Nations 3-Phase Subdivision Development
Cold Lake First Nations -
New (Multiple) Tower Construction & New Fibre Installation
Project Site 3: Kikino Metis Settlement -
Cold Lake First Nations LTE Fixed Wireless Upgrade Project
Existing Tower 1: Cold Lake -
Cold Lake First Nation Subdivision Project
Cold Lake First Nation -
Cold Lake First Nation: CUZ46 Wastewater System Expansion
Cold Lake First Nation -
Cold Lake Budget 2018 Year Three Housing Project 2020 (6 Units)
Cold Lake First Nation -
Cold Lake First Nations LTE Fixed Wireless Upgrade Project
Existing Tower 4: Cold Lake -
Cold Lake First Nation - Frog Lake Regional Water Tie-In
Cold Lake First Nation -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
CANOE LAKE I.R. 165 (Tower 1) -
Big Island Lake Cree Nation Child and Family Service Centre
Big Island Lake Cree Territory -
New Towers Construction, Upgrade single tower & New Fibre Installation
Project Site 2: West Central region - Big Island Lake -
Powwow Arbour Construction
Pierceland -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
CANOE LAKE I.R. 165 (Tower 2) -
Cold Lake First Nations LTE Fixed Wireless Upgrade Project
New Tower 1: Cold Lake -
New (Multiple) Tower Construction & New Fibre Installation
Project Site 2: Kikino Metis Settlement -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
CANOE LAKE I.R. 165 (Tower 3) -
New (Multiple) Tower Construction & New Fibre Installation
Project Site 1: Kikino Metis Settlement -
Blanket Permit - SaskPower - Wapachewunak First Nation (English River First Nation)
Wapachewunak First Nation No. 192D -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
WAPACHEWUNAK I.R. 192D (Tower 2) -
Wapachewunak Water Treatment Plant Optimization
Wapachewunak IR 192D -
ATCO Gas and Pipelines Ltd.: 1088866 Wabasca IR No. 166A Gas Distribution Extension
Bigstone Cree Nation Wabasca IR No. 166A -
Cold Lake First Nations LTE Fixed Wireless Upgrade Project
Existing Tower 2: Cold Lake -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
WAPACHEWUNAK I.R. 192D (Tower 1) -
Cold Lake First Nations LTE Fixed Wireless Upgrade Project
Existing Tower 5: Cold Lake -
Hoole Creek Road Subdivision Apex Utilities
Wabasca 166A -
APEX Utilities Inc. - Opasikoniwew Housing Authority: Hoole Creek Road Subdivision Phase 2 Gasification Project
Wabasca -
Bigstone Cree Nation Oilfield Supply Store
Wabasca #166 -
Bigstone Cree Nation Education Authority: CU254 Oksi Pasikoniwew Kakik School Secondary Access Road Project
Bigstone Cree Nation -
Whitefish Lake First Nation #128 Waste Transfer Station
Whitefish Lake First Nation #128 -
Bigstone Cree First Nation Flood Recovery Program: Culvert 166A-10 TSAG ID No. 07 Replacement
Bigstone Cree Nation -
Bigstone Cree Nation New High School
Bigstone Cree Nation -
Bigstone Cree Nation Education Authority
Bigstone Cree Nation Education Authority antenna supporting structure located on Bigstone Cree Nation in Wabasca-Desmarais, AB. -
Bigstone Cree Nation Temporary Modular Office Complex
Bigstone Cree Nation -
Bigstone Cree First Nation Flood Recovery Program: Culvert 166A-17 TSAG ID No. 03 Replacement
Bigstone Cree Nation -
Bigstone Cree First Nation Flood Recovery Program: Culvert 166A-18 TSAG ID No. 04 Replacement
Bigstone Cree Nation -
Bigstone Cree Nation Education Authority
Bigstone Cree Nation Education Authority antenna supporting structure located on Bigstone Cree Nation in Wabasca-Desmarais, AB. -
New Fibre Installation
Project Site 1 - Bigstone Cree Nation: -
Bigstone Cree Nation High School Waterline Project
Wabasca -
Bigstone B.O.S.S Modular Construction and Fabrication Yard Expansion Project
Bigstone Cree Nation -
Whitefish Lake First Nation Subdivision Lot Development
Whitefish Lake First Nation #128 -
Weepuskow Sahgaiechan IR 165D Timber Harvest Plan 2020-21
WEPUSKOW SAHGAIECHAN IR 165 D -
Pierre River Mine Project
Fort McKay -
New Fibre Installation
Project Site 3 - Wabasca No. 166C: -
Maskotehk Flood Mitigation Upgrades - Borrow Pits
Wabasca 166D -
OS-7241 Wabasca IR 166D | Authorization to Construct and Operate a Surface Lease for an access road and for a multiwell pad
Wabasca IR # 116D -
Wabasca Water Treatment Plant Upgrades Project
Wabasca -
New Fibre Installation
Project Site 2 - Wabasca No. 166B : -
Bigstone Cree Nation Flood Recovery Program: Culvert 166D-27 Replacement
Bigstone Cree Nation -
New Fibre Installation
Project Site 4 - Wabasca No. 166D: -
New Towers Construction, Upgrade single tower & New Fibre Installation
Project Site 7: West Central region - Thunderchild Fixed Wireless Tower -
Bigstone Cree First Nation Flood Recovery Program: Culvert 166D-08 TSAG ID No. 08 Replacement
Bigstone Cree Nation