Bigstone Cree First Nation Flood Recovery Program: Culvert 166A-18 TSAG ID No. 04 Replacement
This is a non-designated project on federal lands or outside Canada. The listed authorities are responsible for the project assessment.
In June of 2018, First Nations Technical Services Advisory Group (TSAG) completed a Disaster Recovery Road Project Inspection, following the state of emergency that was declared by the Nation due to poor road conditions. Spring melt and summer rainfall created impassable conditions from road overtopping. The roads affected by this event, primarily roads within Reserve 166A, composed the scope of the inspection that TSAG completed. Four (4) culvert locations remain to be addressed. A total of twelve (12) larger culverts are proposed within the four (4) crossing locations to increase flow capacity during flood events and are proposing to include mandatory improvements by raising the profile of the road from between 0.3m and 2m.
Disclaimer
This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.
Latest update
October 15, 2021 – The public period on the project is closed. Indigenous Services Canada is considering comments received to help inform its determination on whether the carrying out of the project is likely to cause significant adverse environmental effects.
.
Participate
Key documents
Document Number | Document Title | File | Date |
---|---|---|---|
1 | Public Comment Period on Intent to Make a Determination | - | September 14, 2021 |
Contacts
Indigenous Services CanadaStacey LeBlanc, Sr. Environment Officer
630 Canada Place, 9700 Jasper Ave
Edmonton, Alberta T5J 4G2
Telephone: 780-782-8350
Email: stacey.leblanc@canada.ca
-
Location
- Bigstone Cree Nation (Alberta)
-
Nature of Activity
- Highways and Roads
-
Assessment Status
Completed -
Start Date
2021-09-14 -
Proponent
Urban Systems Ltd. -
Authorities
- Indigenous Services Canada
-
Assessment Type
Project on federal lands -
Reference Number
82991
Nearby assessments
...within 200 kilometres-
Bigstone Cree First Nation Flood Recovery Program: Culvert 166A-17 TSAG ID No. 03 Replacement
Bigstone Cree Nation -
Bigstone Cree Nation High School Waterline Project
Wabasca -
Bigstone Cree First Nation Flood Recovery Program: Culvert 166A-10 TSAG ID No. 07 Replacement
Bigstone Cree Nation -
Bigstone Cree Nation New High School
Bigstone Cree Nation -
Bigstone B.O.S.S Modular Construction and Fabrication Yard Expansion Project
Bigstone Cree Nation -
Bigstone Cree Nation Oilfield Supply Store
Wabasca #166 -
OS-7241 Wabasca IR 166D | Authorization to Construct and Operate a Surface Lease for an access road and for a multiwell pad
Wabasca IR # 116D -
Bigstone Cree First Nation Flood Recovery Program: Culvert 166D-27 Replacement
Bigstone Cree Nation -
Bigstone Cree First Nation Flood Recovery Program: Culvert 166D-08 TSAG ID No. 08 Replacement
Bigstone Cree Nation -
Wabasca Water Treatment Plant Upgrades Project
Wabasca -
Pelican Renewable Generating Station Project
180 kilometres upstream of Fort McMurray -
Sundog Renewable Generating Station Project
130 kilometres upstream of Fort McMurray -
Sawridge Band Solar Farm Project
Sawridge Band -
North Corridor Expansion Project
Peerless Lake -
Loon River First Nation Industrial Park Warehouse
Loon River First Nation -
Loon River First Nation North Central Corridor Loop Temporary Contractor Yard
Loon River First Nation -
Atikameg Healing Shelter for Women and Children
Whitefish Lake First Nation -
Whitefish Lake Fire Guard Project
Whitefish Lake First Nation 155 -
Loon River First Nation Water Treatment Plant Upgrades Design Construction
Loon River First Nation -
Loon River First Nation: Industrial Park Grocery Store
Loon River Cree Nation -
Loon Lake Cree Nation Pure Fibre Network Project
Loon River Cree Nation -
Swan River First Nation Housing Project 2019 (5-Units)
Swan River First Nation -
Swan River First Nation Waste Diversion and Recycling Facility
Swan River First Nation -
Swan River First Nation Lakefront Development Project
Lesser Slave Lake -
North Corridor Expansion Project
Highway 88 -
Driftpile Cree Nation Lift Station No. 1 Replacement Project
Driftpile Cree Nation -
Driftpile Cree Nation New Housing Construction Project
Driftpile, AB -
DCN 2023 Rapid Housing Project
DCN 2023 Rapid Housing Project -
Driftpile Cree Nation Gas Line Connector Project
Driftpile Cree Nation -
Meanook National Wildlife Area Buildings Demolition
Meanook National Wildlife Area -
Joussard Harbour Alberta - Routine Maintenance Dredging of the Joussard Harbour at Lesser Slave Lake Alberta - over the next year
Joussard Harbour -
Woodland Cree CMHC Co-Investment Housing Project - Marten Lake Subdivision (10-Units)
Cadotte Lake -
Kapawe'no Adventure Trail Project
Kapawe'no Adventure Trail Project -
Kapawe'no First Nation Echo Prairie Waterline Project
Kapawe'no First Nation -
Sucker Creek Housing Project 2020 (4 Units)
Sucker Creek First Nation -
Three Unit Modular Housing Project
Sucker Creek First Nation -
Sucker Creek First Nation Water System Upgrades
Sucker Creek First Nation -
Fort McMurray First Nation: Gregoire Lake Water and Sewage Project
Gregoire Lake -
Fort McMurray First Nation Water and Wastewater Infrastructure
Fort McMurray First Nation -
Suncor Base Mine Extension Project
3 kilometres north of Fort McMurray -
2017 NGTL System Expansion Project
Fort McMurray -
Clearwater Multi-User Access Project, Alberta
Clearwater River -
Heart Lake First Nation: Inter-jurisdictional Access Road
Heart Lake First Nation #167 -
Heart Lake BF 80752 Bridge Replacement
Heart Lake First Nation -
OS-7244 Woodland Cree 226
Woodland Cree 226 -
OS-7239 Woodland Cree 226
OS-7239 -
Beaver Lake Cenovus Housing Initiative - Build Out of 20 Residential Lots, Access Roads, and Water Distribution
Beaver Lake Cree Nation -
Woodland Cree 226
OS-7238 -
Beaver Lake Cree Nation Fiber Optic Internet Infrastructure - Universal Broadband Fund Project
Beaver Lake Cree Nation -
Beaver Lake Cree Nation New High School and Resource Centre
Beaver Lake Cree Nation -
Suncor Energy Coke Fired Boiler Replacement Project
25 kilometres north of Fort McMurray -
OS-7245 Woodland Cree Reserve 226
Woodland Cree 226 -
Woodland Cree CMHC Co-Investment Housing Project - Simon Lake Subdivision (21-Units)
Woodland Cree First Nation -
Chipewyan Prairie First Nation 2021 Subdivision Project (Phase 1)
Chipewyan Prairie First Nation -
Chipewyan Prairie First Nation Janvier Secondary Egress Road
Chipewyan Prairie First Nation -
Fort McKay First Nation K-9 School
Fort McKay First Nation -
Chipewyan Prairie First Nation Housing Project 2020-21 (5 Units)
Chipewyan Prairie First Nation -
Wolverine River Lateral Loop (Carmon Creek Section)
Carmon Lake