Suncor Base Plant Water Treatment Plant Project

Suncor Energy Inc. is proposing to construct a wastewater treatment facility, located within the existing Suncor Base Plant area, north of Fort McMurray, Alberta. As proposed, the Suncor Base Plant Water Treatment Plant Project would include the construction of a new water pipeline and wastewater treatment facility, and modification of the existing outfall at Suncor's Base Plant. The project would treat oil sands process water and discharge into the Athabasca River, with a maximum design production rate of approximately 12 million cubic metres per year. The project is expected to operate for about 20 years.


Latest update

October 9, 2026 — On September 25, 2026, and October 5, 2026, the Minister of the Environment, Climate Change and Nature received additional requests to designate the Suncor Base Plant Water Treatment Plant Project, proposed by Suncor Energy Inc. The Impact Assessment Agency of Canada is conducting an analysis and will make a recommendation to the President on whether to designate the project under the Impact Assessment Act.

Participate

Key documents

Key documents
Document number Document title File Date
5 Fifth request for designation of project PDF (1.7 MB) October 5, 2026
4 Fourth request for designation of project PDF (3.4 MB) September 25, 2026
3 Third request for designation of project PDF (972 KB) September 2, 2026
2 Second request for designation of project PDF (1.6 MB) August 25, 2026
1 Request for designation of project PDF (1.2 MB) August 21, 2026

Contacts

Prairie and Northern Regional Office
Impact Assessment Agency of Canada
1145-9700 Jasper Avenue
Edmonton AB T5J 4C3
Telephone: 780-495-2037
Fax: 780-495-2876
Email: PNR-RPN@iaac-aeic.gc.ca

Media Relations
Impact Assessment Agency of Canada
160 Elgin Street, 22nd Floor
Ottawa ON K1A 0H3
Email: media@iaac-aeic.gc.ca


Disclaimer

This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.

  • Location

    • 20 kilometres north of Fort McMurray (Alberta)
  • Nature of activity

    • Water Management
  • Assessment status

    In progress
  • Start date

    2026-09-10
  • Proponent

    Suncor Energy Inc.
  • Authorities

    • Impact Assessment Agency of Canada
  • Assessment type

    Request for designation
  • Reference number

    90251

Nearby assessments

...within 200 kilometres
Date modified: