Big Egg Lake Water Control Structure
This is a non-designated project on federal lands or outside Canada. The listed authorities are responsible for the project assessment.
The Big Egg Lake Water Control Structure Project (the Project) is an initiative proposed by the Athabasca Chipewyan First Nation (ACFN) under the Wood Buffalo National Park World Heritage Site Action Plan (the Action Plan). The Project will be owned and operated by ACFN and was collaboratively developed with ACFN and federal technical experts under the Action Plan. The Project is proposed to be located on the east-connection channel between Big Egg Lake and the Athabasca River, within the Athabasca Chipewyan First Nation Jackfish Reserve (I.R. 201), Alberta. The Project involves dredging and enlarging the existing east connection channel and installing a flap-gated culvert structure within the channel.
Latest update
Participate
Key documents
Document Number | Document Title | File | Date |
---|---|---|---|
1 | New project being assessed by Parks Canada and Transport Canada - Public comments invited from July 10 to August 9, 2024 | - | July 10, 2024 |
Contacts
Southwest Northwest Territories Field Unit |Parks Canada | Government of CanadaP.O. Box 750
Fort Smith, Northwest Territories X0E 0P0
Email: wbnpactionplan-planactionpnwb@pc.gc.ca
-
Location
- Athabasca Chipewyan First Nation Jackfish Reserve (I.R. 201) (Alberta)
-
Nature of Activity
- Remediation and conservation
-
Assessment Status
In progress -
Start Date
2024-07-10 -
Proponent
Athabasca Chipewyan First Nation -
Authorities
- Parks Canada Agency
- Transport Canada
-
Assessment Type
Project on federal lands -
Reference Number
88694
Disclaimer
This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.
Nearby assessments
...within 200 kilometres-
Re-establish Former Water Level and Flow monitoring stations at four sites within the Peace Athabasca Delta of Wood Buffalo National Park
Wood Buffalo National Park -
Re-establish Former Water Level and Flow monitoring stations at four sites within the Peace Athabasca Delta of Wood Buffalo National Park
Wood Buffalo National Park -
Dog Camp Water Control Structure
Wood Buffalo National Park of Canada -
Peace-Athabasca Delta Field Station
Detailed Impact Assessment, Wood Buffalo National Park -
Establish Water Survey of Canada river depth station on north branch of Quatre Fourches
Wood Buffalo National Park -
Re-establish Former Water Level and Flow monitoring stations at four sites within the Peace Athabasca Delta of Wood Buffalo National Park
Wood Buffalo National Park -
Re-establish Former Water Level and Flow monitoring stations at four sites within the Peace Athabasca Delta of Wood Buffalo National Park
Wood Buffalo National Park -
Winter Road creation, maintenance, and breakdown
Wood Buffalo National Park -
Culvert Replacement Along Carlson's Road km 136.1 Wood Buffalo National Park (Alberta)
Wood Buffalo National Park -
Frontier Oil Sands Mine Project
Fort McKay -
Pierre River Mine Project
Fort McKay -
Peace Point Water Survey of Canada Hydrometric Station Shelter Replacement, Wood Buffalo National Park
Wood Buffalo National Park -
Mikisew Peace Point Power Plant Solar Addition
Mikisew Cree First Nation -
Jackpine Mine Expansion Project
Fort McKay -
Culvert Replacement and Repair at km 41 Hay Camp Road
Wood Buffalo National Park of Canada -
Patterson Lake South Mine Project
Patterson Lake -
Rook I Project
Patterson Lake -
Berry Plant Clearing in Pine Lake Campground, Wood Buffalo National Park
Wood Buffalo National Park -
Hay Camp Road (km 20) Culvert Replacement, Wood Buffalo National Park
Wood Buffalo National Park -
Fort McKay First Nation: 2023/24 Residential Redevelopment Project
Fort McKay First Nation -
Fort McKay First Nation K-9 School
Fort McKay First Nation -
New Fibre Installation
Project site 1: Regional Municipality of Wood Buffalo -
Former Gunnar Mine Site Rehabilitation Project
Gunnar -
Suncor Energy Coke Fired Boiler Replacement Project
25 kilometres north of Fort McMurray -
New Fibre Installation
Project site 1: Thabacha Náre 196A & Thebathi 196 -
Suncor Base Mine Extension Project
3 kilometres north of Fort McMurray -
Smith's Landing First Nation Phase 1(a) Housing Development
Smiths Landing First Nation -
Smith's Landing First Nation Phase 1A Housing Development (Part 2)
Smiths Landing First Nation -
L150 Anchor Inspection and Repair
Wood Buffalo National Park of Canada -
NTPC L-150 Anchor Inspection and Rehabilitation Project, Highway 5
Wood Buffalo National Park of Canada -
Pelican Lake First Nation Gas Bar Upgrade
Chitek Lake IR 191 -
Clearwater Multi-User Access Project, Alberta
Clearwater River -
2017 NGTL System Expansion Project
Fort McMurray