Peace Point Water Survey of Canada Hydrometric Station Shelter Replacement, Wood Buffalo National Park
This is a non-designated project on federal lands or outside Canada. The listed authorities are responsible for the project assessment.
The station shelter has suffered damage due to previous ice jamming and needs to be replaced. The new shelter would be located further inland to avoid future damage from ice jamming. The hydrometric station provides critical water data and the new shelter will be established before the current gauge is decommissioned.
Latest update
September 24, 2021 - The assessment decision statement has been issued to the proponent.
Participate
Key documents
Document Number | Document Title | File | Date |
---|---|---|---|
2 | Parks Canada and Environment and Climate Change Canada have issued a notice of determination and decided that the project is not likely to cause significant adverse environmental effects | - | September 24, 2021 |
1 | New project being assessed by Parks Canada and Environment and Climate Change Canada - Public comments invited from June 28 to July 28, 2021 | - | June 28, 2021 |
Contacts
Wood Buffalo National Park149 McDougal Rd
Box 750
Fort Smith, Northwest Territories X0E 0P0
Telephone: 867-872-7960
Email: rescon-ftsmith@pc.gc.ca
-
Location
- Wood Buffalo National Park (Alberta)
-
Nature of Activity
- Building and Property Development
-
Assessment Status
Completed -
Start Date
2021-06-28 -
Proponent
Environment and Climate Change Canada -
Authorities
- Parks Canada Agency
-
Assessment Type
Project on federal lands -
Reference Number
81746
Disclaimer
This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.
Nearby assessments
...within 200 kilometres-
Mikisew Peace Point Power Plant Solar Addition
Mikisew Cree First Nation -
Culvert Replacement Along Carlson's Road km 136.1 Wood Buffalo National Park (Alberta)
Wood Buffalo National Park -
Winter Road creation, maintenance, and breakdown
Wood Buffalo National Park -
Berry Plant Clearing in Pine Lake Campground, Wood Buffalo National Park
Wood Buffalo National Park -
Re-establish Former Water Level and Flow monitoring stations at four sites within the Peace Athabasca Delta of Wood Buffalo National Park
Wood Buffalo National Park -
Re-establish Former Water Level and Flow monitoring stations at four sites within the Peace Athabasca Delta of Wood Buffalo National Park
Wood Buffalo National Park -
Culvert Replacement and Repair at km 41 Hay Camp Road
Wood Buffalo National Park of Canada -
Establish Water Survey of Canada river depth station on north branch of Quatre Fourches
Wood Buffalo National Park -
Hay Camp Road (km 20) Culvert Replacement, Wood Buffalo National Park
Wood Buffalo National Park -
Dog Camp Water Control Structure
Wood Buffalo National Park of Canada -
Peace-Athabasca Delta Field Station
Detailed Impact Assessment, Wood Buffalo National Park -
Re-establish Former Water Level and Flow monitoring stations at four sites within the Peace Athabasca Delta of Wood Buffalo National Park
Wood Buffalo National Park -
Re-establish Former Water Level and Flow monitoring stations at four sites within the Peace Athabasca Delta of Wood Buffalo National Park
Wood Buffalo National Park -
New Fibre Installation
Project site 1: Thabacha Náre 196A & Thebathi 196 -
NTPC L-150 Anchor Inspection and Rehabilitation Project, Highway 5
Wood Buffalo National Park of Canada -
Smith's Landing First Nation Phase 1A Housing Development (Part 2)
Smiths Landing First Nation -
Smith's Landing First Nation Phase 1(a) Housing Development
Smiths Landing First Nation -
L150 Anchor Inspection and Repair
Wood Buffalo National Park of Canada -
Wood Buffalo National Park Highway Asphalt Surface Treatment
Wood Buffalo National Park -
Big Egg Lake Water Control Structure
Athabasca Chipewyan First Nation Jackfish Reserve (I.R. 201) -
Sandhills Substation Generator Upgrade
Wood Buffalo National Park of Canada -
Sass River / Prebble Creek Embankment Repair and Gabion Installation by the Government of the Northwest Territories
Wood Buffalo National Park of Canada -
Little Red River Cree Nation: Fox Lake New School
Fox Lake -
Frontier Oil Sands Mine Project
Fort McKay -
Little Red River Cree Nation John d'Or Prairie 105m Telecommunications Guyed Tower
John d'Or Prairie 105m Telecommunications Guyed Tower -
Little Red River Cree Nation: John D'Or Prairie New School
John D'or Prairie -
Little Red River Cree Nation: CUZ42 John D'Or Prairie Emergency Water Pipeline from Adams Landing
Little Red River Cree Nation -
Pierre River Mine Project
Fort McKay