The Peace-Athabasca Delta Field Station Project is a partnership between Parks Canada Agency and the Mikisew Cree First Nation, the Athabasca Chipewyan First Nation, and the Fort Chipewyan Métis Association. The Field Station will provide a place to support research and monitoring programs in the delta. It will also be a place to host on-the-land events and other cultural activities led by the Indigenous communities.
The Field Station will be built at the poplar stand, an undisturbed patch of land located approximately 1km northwest of Chenal des Quatre Fourches on the North Branch. The Field Station constructed assets will include cabins, kitchen, sheltered lab/work area, washrooms, storage buildings, sheltered hall, fire pit, gathering area, activity spaces, a floating/removable dock, and wooden walkways for accessibility. The design will consider low-impact and green technology for construction and operation, and use approaches to allow the facility to scale up and adapt as user requirements evolve over time. Guidance for the ongoing development of the field station is being provided by a Steering Committee made up of Indigenous representatives and by a Design Working Group composed of community members and elders local to Fort Chipewyan.
Construction is scheduled to begin in fall 2022 with tree clearing, site grading, and dock construction. All assets will be constructed in 2023, with construction completion by March 2024. Feasibility studies for site services (water supply, grey water disposal, electrical supply) are currently underway.
Disclaimer
This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.
Latest update
Participate
Key documents
Document Number | Document Title | File | Date |
---|---|---|---|
2 | Parks Canada has issued a notice of determination and decided that the project is not likely to cause significant adverse environmental effects | - | October 12, 2022 |
1 | New project being assessed by Parks Canada - Public comments invited from July 11 to August 10, 2022 | - | July 11, 2022 |
Contacts
Wood Buffalo National Park149 McDougal Rd
Box 750
Fort Smith, Northwest Territories X0E 0P0
Telephone: 867-872-7960
Email: rescon-ftsmith@pc.gc.ca
-
Location
- Detailed Impact Assessment, Wood Buffalo National Park (Alberta)
-
Nature of Activity
- Building and Property Development
-
Assessment Status
Completed -
Start Date
2022-07-11 -
Proponent
Parks Canada -
Authorities
- Parks Canada Agency
-
Assessment Type
Project on federal lands -
Reference Number
83783
Nearby assessments
...within 200 kilometres-
Re-establish Former Water Level and Flow monitoring stations at four sites within the Peace Athabasca Delta of Wood Buffalo National Park
Wood Buffalo National Park -
Re-establish Former Water Level and Flow monitoring stations at four sites within the Peace Athabasca Delta of Wood Buffalo National Park
Wood Buffalo National Park -
Establish Water Survey of Canada river depth station on north branch of Quatre Fourches
Wood Buffalo National Park -
Re-establish Former Water Level and Flow monitoring stations at four sites within the Peace Athabasca Delta of Wood Buffalo National Park
Wood Buffalo National Park -
Re-establish Former Water Level and Flow monitoring stations at four sites within the Peace Athabasca Delta of Wood Buffalo National Park
Wood Buffalo National Park -
Winter Road creation, maintenance, and breakdown
Wood Buffalo National Park -
Culvert Replacement Along Carlson's Road km 136.1 Wood Buffalo National Park (Alberta)
Wood Buffalo National Park -
Peace Point Water Survey of Canada Hydrometric Station Shelter Replacement, Wood Buffalo National Park
Wood Buffalo National Park -
Mikisew Peace Point Power Plant Solar Addition
Mikisew Cree First Nation -
Culvert Replacement and Repair at km 41 Hay Camp Road
Wood Buffalo National Park of Canada -
Frontier Oil Sands Mine Project
Fort McKay -
Clairière de plantes baccifères au terrain de camping du lac Pine, parc national du Canada Wood Buffalo
Wood Buffalo National Park -
Hay Camp Road (km 20) Culvert Replacement, Wood Buffalo National Park
Wood Buffalo National Park -
Pierre River Mine Project
Fort McKay -
Jackpine Mine Expansion Project
Fort McKay -
Smith's Landing First Nation Phase 1(a) Housing Development
Smiths Landing First Nation -
Smith's Landing First Nation Residential Housing Development Project
Smiths Landing First Nation -
L150 Anchor Inspection and Repair
Wood Buffalo National Park of Canada -
NTPC L-150 Anchor Inspection and Rehabilitation Project, Highway 5
Wood Buffalo National Park of Canada -
Former Gunnar Mine Site Rehabilitation Project
Gunnar -
Patterson Lake South Mine Project
Patterson Lake -
Rook 1 Project
Patterson Lake -
Fort McKay First Nation K-9 School
Fort McKay First Nation -
Wood Buffalo National Park Highway Asphalt Surface Treatment
Wood Buffalo National Park -
Suncor Energy Coke Fired Boiler Replacement Project
25 kilometres north of Fort McMurray -
Fox Lake School
Fox Lake -
Suncor Base Mine Extension Project
3 kilometres north of Fort McMurray