Fort McKay First Nation K-9 School
This is a non-designated project on federal lands or outside Canada. The listed authorities are responsible for the project assessment.
Fort McKay First Nation is proposing to construct a new 5, 694m2, 300-student capacity, K-9 school. The site will include 2 baseball diamonds, full-size running track with a soccer field in the center, and a 390m2 bus maintenance building. The site is approximately 8.2 ha or 20 acres in size.
Latest update
September 24, 2020 – Indigenous Services Canada issued its notice of determination and determined that the project is not likely to cause significant adverse environmental effects.
Participate
Key documents
| Document Number | Document Title | File | Date |
|---|---|---|---|
| 2 | Notice of Determination for the Fort McKay First Nation K-9 School | - | September 24, 2020 |
| 1 | Public Comment Period on Intent to Make a Determination | - | November 27, 2019 |
Contacts
Indigenous Services CanadaStacey LeBlanc, Sr. Environment Officer
630 Canada Place, 9700 Jasper Ave
Edmonton, Alberta T5J 4G2
Telephone: 780-782-8350
Email: stacey.leblanc@canada.ca
Disclaimer
This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.
-
Location
- Fort McKay First Nation (Alberta)
-
Nature of Activity
- Building and Property Development
-
Assessment Status
Completed -
Start Date
2019-11-27 -
Proponent
Fort McKay First Nation -
Authorities
- Indigenous Services Canada
-
Assessment Type
Project on federal lands -
Reference Number
80349
Nearby assessments
...within 200 kilometres-
Fort McKay First Nation: 2023/24 Residential Redevelopment Project
Fort McKay First Nation -
New Fibre Installation
Project site 1: Regional Municipality of Wood Buffalo -
Pathways Alliance CO2 Transportation Network and Storage Hub Project
Carbon Capture Infrastructure and Lateral Pipelines -
Suncor Energy Coke Fired Boiler Replacement Project
25 kilometres north of Fort McMurray -
Jackpine Mine Expansion Project
Fort McKay -
Suncor Base Mine Extension Project
3 kilometres north of Fort McMurray -
Pierre River Mine Project
Fort McKay -
Clearwater Multi-User Access Project, Alberta
Clearwater River -
2017 NGTL System Expansion Project
Fort McMurray -
Frontier Oil Sands Mine Project
Fort McKay -
Fort McMurray First Nation New Housing Construction Project
GREGOIRE LAKE NO. 176A -
Fort McMurray First Nation: Gregoire Lake Water and Sewage Project
Gregoire Lake -
New Fibre Installation
Project site 2: Regional Municipality of Wood Buffalo -
ATCO Gas and Pipelines Ltd.: 1088748 Gregoire Lake IR No. 176A Lakeshore Drive Gas Distribution System Extension
Fort McMurray First Nation -
New Fibre Installation
Project site 3: Regional Municipality of Wood Buffalo -
Fort McMurray First Nation Water and Wastewater Infrastructure
Fort McMurray First Nation -
Fort McMurray First Nation New Housing Construction Project
GREGOIRE LAKE NO. 176 -
Sundog Renewable Generating Station Project
130 kilometres upstream of Fort McMurray -
Big Egg Lake Water Control Structure
Athabasca Chipewyan First Nation Jackfish Reserve (I.R. 201) -
Big Bear Camp Aerodrome Project
Grygar Lake -
Pathways Alliance CO2 Transportation Network and Storage Hub Project
Main Transportation Pipeline -
Patterson Lake South Mine Project
Patterson Lake -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
CLEARWATER RIVER DENE BAND NO. 222 (Tower 1) -
Clearwater River Dene Subdivision
Clearwater River Dene IR 122 -
Janvier Secondary Egress Road
Chipewyan Prairie First Nation -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
CLEARWATER RIVER DENE BAND NO. 222 (Tower 2) -
Chipewyan Prairie First Nation Housing Project 2020-21 (5 Units)
Chipewyan Prairie First Nation -
0861 - Upgrade (33 & 48 - 60mm) North Janvier
Janvier -
ATCO Gas and Pipelines: 1091764 North Janvier Natural Gas Delivery Pipeline Upgrade Project
Chipewyan Prairie First Nation -
Armand Bekkattla Treatment Centre Recapitalization and Expansion
Clearwater River Dene Band 222 -
New Fibre Installation
Project site 4: Regional Municipality of Wood Buffalo -
Chipewyan Prairie First Nation 2021 Subdivision Project (Phase 1)
Chipewyan Prairie First Nation -
1121393 - 0861 - SubD(13RUP) CPFN Janvier - Phase 2
Janvier -
Rook I Project
Patterson Lake -
La Loche Hotel
La Loche -
Re-establish Former Water Level and Flow monitoring stations at four sites within the Peace Athabasca Delta of Wood Buffalo National Park
Wood Buffalo National Park -
Dog Camp Water Control Structure
Wood Buffalo National Park of Canada -
Re-establish Former Water Level and Flow monitoring stations at four sites within the Peace Athabasca Delta of Wood Buffalo National Park
Wood Buffalo National Park -
Peace-Athabasca Delta Field Station
Detailed Impact Assessment, Wood Buffalo National Park -
Pelican Renewable Generating Station Project
180 kilometres upstream of Fort McMurray -
Establish Water Survey of Canada river depth station on north branch of Quatre Fourches
Wood Buffalo National Park -
New Fibre Installation
Project Site 3 - Wabasca No. 166C: -
Wabasca Water Treatment Plant Upgrades Project
Wabasca -
New Fibre Installation
Project Site 5 - Wabasca No. 166: -
ATCO Gas and Pipelines Ltd.: 1098480 Wabasca IR No. 166 Phase 2 Alfred Road Gas Main & Distribution System
Bigstone Cree Nation -
ATCO Gas and Pipelines Ltd.: 1088866 Bigstone Cree Nation & Hamlet of Sandy Lake Gas Feeder and Mains at Wabasca IR No. 166
Bigstone Cree Nation -
Rogers Communications Inc., new radiocommunications tower (W6225) on Peerless Trout First Nation land, near Peerless Lake, AB.
W6225 - Peerless Trout First Nation Land (near Peerless Lake) -
Peerless Housing CMHC Site 2
Peerless Trout IR No. 238 -
Peerless CMHC Housing PTFN Camp Area
Peerless Trout IR No. 238 -
North Corridor Expansion Project
Peerless Lake -
ATCO Gas and Pipelines Ltd.: 1088866 Wabasca IR No. 166A Gas Distribution Extension
Bigstone Cree Nation Wabasca IR No. 166A -
Bigstone Cree Nation Oilfield Supply Store
Wabasca #166 -
Hoole Creek Road Subdivision Apex Utilities
Wabasca 166A -
Bigstone B.O.S.S Modular Construction and Fabrication Yard Expansion Project
Bigstone Cree Nation -
Bigstone Cree Nation Education Authority: CU254 Oksi Pasikoniwew Kakik School Secondary Access Road Project
Bigstone Cree Nation -
Bigstone Cree Nation New High School
Bigstone Cree Nation -
Bigstone Cree Nation Education Authority
Bigstone Cree Nation Education Authority antenna supporting structure located on Bigstone Cree Nation in Wabasca-Desmarais, AB. -
Bigstone Cree Nation Temporary Modular Office Complex
Bigstone Cree Nation -
Bigstone Cree First Nation Flood Recovery Program: Culvert 166A-10 TSAG ID No. 07 Replacement
Bigstone Cree Nation -
New Fibre Installation
Project Site 1 - Bigstone Cree Nation: -
Bigstone Cree Nation Education Authority
Bigstone Cree Nation Education Authority antenna supporting structure located on Bigstone Cree Nation in Wabasca-Desmarais, AB. -
Bigstone Cree First Nation Flood Recovery Program: Culvert 166A-17 TSAG ID No. 03 Replacement
Bigstone Cree Nation -
Bigstone Cree Nation High School Waterline Project
Wabasca -
Bigstone Cree First Nation Flood Recovery Program: Culvert 166A-18 TSAG ID No. 04 Replacement
Bigstone Cree Nation -
Re-establish Former Water Level and Flow monitoring stations at four sites within the Peace Athabasca Delta of Wood Buffalo National Park
Wood Buffalo National Park -
Re-establish Former Water Level and Flow monitoring stations at four sites within the Peace Athabasca Delta of Wood Buffalo National Park
Wood Buffalo National Park -
Trout Lake Daycare
Peerless Trout IR No. 238 -
Rogers Communications Inc., new radiocommunications tower (W6238) on Peerless Trout First Nation land, near Trout Lake, AB.
W6238 - Peerless Trout First Nation Land (near Trout Lake) -
New Fibre Installation
Project Site 2 - Wabasca No. 166B : -
Winter Road creation, maintenance, and breakdown
Wood Buffalo National Park -
Wood Buffalo National Park Moose Island Fire Guard Maintenance
Wood Buffalo National Park of Canada -
Maskotehk Flood Mitigation Upgrades - Borrow Pits
Wabasca 166D -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
TURNOR LAKE I.R. 193B (Tower 2) -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
TURNOR LAKE I.R. 193B (Tower 1) -
Birch Narrows First Nation Solid Waste Transfer Station
Turnor Lake Indian Reserve 193B -
New Fibre Installation
Project Site 4 - Wabasca No. 166D: -
Birch Narrows Dene Nation Community Centre
Birch Narrows Dene Nation -
Chipewyan Prairie First Nation Wastewater Treatment Plant Expansion
Chipewyan Prairie First Nation -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
TURNOR LAKE I.R. 193B (Tower 3) -
166D Pumphouse Upgrades
166D Pumphouse Upgrade -
Bigstone Cree First Nation Flood Recovery Program: Culvert 166D-08 TSAG ID No. 08 Replacement
Bigstone Cree Nation -
OS-7241 Wabasca IR 166D | Authorization to Construct and Operate a Surface Lease for an access road and for a multiwell pad
Wabasca IR # 116D -
Bigstone Cree Nation Flood Recovery Program: Culvert 166D-27 Replacement
Bigstone Cree Nation -
Culvert Replacement Along Carlson's Road km 136.1 Wood Buffalo National Park (Alberta)
Wood Buffalo National Park