Grey Owl Parking Lot Privy and Reroute
This is a non-designated project on federal lands or outside Canada. The listed authorities are responsible for the project assessment.
Reroute the beginning or end of four trails to create one main trail head. Portions of old trails will be decommissioned and rehabilitated. A new double vault toilet will be installed, as well as a new trailhead kiosk, bench and picnic table.
Latest update
May 20, 2022 - The assessment decision statement has been issued to the proponent.
Participate
Key documents
| Document number | Document title | File | Date |
|---|---|---|---|
| 2 | Parks Canada has issued a notice of determination and decided that the project is not likely to cause significant adverse environmental effects | - | April 19, 2022 |
| 1 | New project being assessed by Parks Canada - Public comments invited from October 20 to November 19, 2021 | - | October 20, 2021 |
Contacts
Riding Mountain National Park135 Wasagaming Drive
Box 299
Onanole, Manitoba R0J 1N0
Telephone: 204-848-7275
Fax: 204-848-2596
Email: rmnp.info@pc.gc.ca
Disclaimer
This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.
-
Location
- Riding Mountain National Park (Manitoba)
-
Nature of Activity
- Recreation and Tourism
- Remediation and conservation
-
Assessment Status
Completed -
Start Date
2021-10-20 -
Proponent
Parks Canada -
Authorities
- Parks Canada Agency
-
Assessment Type
Project on federal lands -
Reference Number
83108
Nearby assessments
...within 200 kilometres-
Clear Lake Golf Course Clubhouse Patio
Riding Mountain National Park of Canada -
North Shore Hydro Distribution Line Rebuild
Riding Mountain National Park of Canada -
Wasagaming Wildfire Risk Reduction 2023-2026
Riding Mountain National Park -
Highway 19 Urgent Maintenance, Ditch Development and Culvert Replacements
Riding Mountain National Park of Canada -
New Fibre Installation
Riding Mountain National Park -
Hydro - North Shore Line Project
Riding Mountain National Park of Canada -
Westman Communications Fibre Optic throughout Wasagaming
Riding Mountain National Park of Canada -
Mooswa East Water Line
Riding Mountain National Park -
Lakeshore Trail Re-design
Riding Mountain National Park of Canada -
Clear Lake Pier Repairs
Riding Mountain National Park of Canada -
New Resort Development - 116 TaWaPit Drive, Wasagaming
Riding Mountain National Park -
Northeast end of Clear Lake Cabin area storm water catch basin, drainage pipe and dissipation pool
Riding Mountain National Park -
Westman Communications Fiber - Phase 2 - Clear Lake Cabin Area
Riding Mountain National Park of Canada -
New Cabin 56-4th St. S. Clear Lake Cabin Area
Riding Mountain National Park of Canada -
Management of Zebra Mussels in Clear Lake in Riding Mountain National Park
Riding Mountain National Park of Canada -
Tiger Salamander Crossing
Riding Mountain National Park -
Research, Monitoring and Management of Invasive Smallmouth Bass in Clear Lake, Riding Mountain National Park
Riding Mountain National Park -
Westman Communications Fiber Optic Cable
Riding Mountain National Park -
Ominnik Marsh Trail Anchor System & Boardwalk Replacement
Riding Mountain National Park of Canada -
Ominnik Marsh Trail Accessibility Reroute
Riding Mountain National Park -
Smallmouth Bass Project
Riding Mountain National Park -
Highway 19 Roadway Rehabilitation Addendum 2 Swanson Creek Culvert
Riding Mountain National Park -
South Lake Prescribed Fire
Riding Mountain National Park of Canada -
Escarpment Trailhead Sign Replacement and New vault Privy
Riding Mountain National Park -
East Trails Project - East Gate
Riding Mountain National Park -
Extension of Bison Enclosure South onto Plains Rough Fescue Grassland Restoration Area
Riding Mountain National Park -
Jackfish Creek Bison Pasture Expansion
Riding Mountain National Park -
Jackfish Creek Prescribed Fire
Riding Mountain National Park of Canada -
MB Hydro Pole and Arm Replacement
Riding Mountain National Park of Canada -
Utility Service Agreement BELL MTS Inc. Moon Lake Telecommunications Tower
Riding Mountain National Park -
Rolling River First Nation - Construction of Three Bridges
Rolling River Reserve 67 -
New (Multiple) Tower Construction, Upgrade (Single) Tower, New Fibre Installation
Keeseekoowenin First Nation (Indian Reserve 61) Project site 1 -
Seech-Hopper 3 Prescribed Fire
Riding Mountain National Park of Canada -
Keeseekoowenin Ojibway First Nation - Water Treatment Plant and Upgraded Lagoon
Keeseekoowenin Ojibway First Nation -
New (Multiple) Tower Construction, Upgrade (Single) Tower, New Fibre Installation
Keeseekoowenin First Nation (Indian Reserve 61) Project site 2 -
Boreal Trail Reconstruction
Riding Mountain National Park of Canada -
Clear Lake Cabin Area Kayak Launch Site
Riding Mountain National Park -
Edwards Creek Trail Upgrade Proposal
Riding Mountain National Park of Canada -
New Staff Campground for Riding Mountain National Park
Riding Mountain National Park -
Menzies Prescribed Fire
Riding Mountain National Park of Canada -
Baldy Prescribed Fire
Riding Mountain National Park of Canada -
Pine Creek and Ebb and Flow - Anishinaabe Aki Petro-Can Gas Bar in Dauphin, MB - 2425
Dauphin -
Waywayseecappo First Nation - School Water Treatment Plant Recovery
Waywayseecappo First Nation -
New Telecommunication Towers on the Waywayseecappo First Nation Reserve
Waywayseecappo First Nation Southeast -
Xplornet Inc. Radiocommunication Antenna Addition on Ebb and Flow First Nation Reserve No. 280
Ebb and Flow First Nation Reserve No. 280 -
CSC97 - Ebb and Flow First Nation Water Supply Line Project
Ebb and Flow First Nation -
New Telecommunication Towers on the Waywayseecappo First Nation Reserve
Waywayseecappo First Nation Northeast -
Waywayseecappo - New Water Treatment Plant - 2324
Waywayseecappo WTP -
PARKS CANADA AGENCY - Riding Mountain National Park (West Side) Addition of New Site Known as Tower Hill
PARKS CANADA AGENCY - Riding Mountain National Park (West Side) -
Ebb and Flow First Nation - Road and Drainage Upgrades
Ebb and Flow First Nation -
Tower Hill VHF Tower
Riding Mountain National Park -
Waywayseecappo First Nation - Water Treatment Plant
Waywayseecappo First Nation -
New Telecommunication Towers on the Waywayseecappo First Nation Reserve
Waywayseecappo First Nation Northwest -
New Telecommunication Towers on the Waywayseecappo First Nation Reserve
Waywayseecappo First Nation Southwest -
Pope National Wildlife Area Spillway Replacement Project
Pope National Wildlife Area -
Pope National Wildlife Area Water Control Structure Renaturalization Project
Pope National Wildlife Area -
Sandy Bay First Nation CFS Prevention Center Temporary Facilities (10 RTMs)
Sandy Bay First Nation -
New Fibre Installation - Sandy Bay
Project site: Sandy Bay -
Sandy Bay First Nation New Water Treatment Plant
Sandy Bay First Nation -
Waywayseecappo First Nation Elton Property Gas Bar
Waywayseecappo First Nation -
New Broadband Communications North Inc. Telecommunication Tower at Lake Manitoba First Nation on Dog Creek Reserve No. 46
Lake Manitoba First Nation, MB -
New Fibre Installation
Project site: Various parts of Manitoba -
Lake Manitoba First Nation - CHRT41 FNCFS Prevention Centre
Lake Manitoba First Nation -
Tootinaowaziibeeng - CHRT 41 - Jordan's Principle - Multiple Buildings - 2324
Tootinaowaziibeeng - CHRT 41 - Jordan's Principle - Multiple Buildings - 2324 -
Tootinaowaziibeeng - CHRT 41 - Wellness Centre
Tootinaowaziibeeng -
Aldershot Road Reconstruction - Canadian Forces Base Shilo
Canadian Forces Base Shilo -
Railway Crossings Upgrade - Canadian Forces Base Shilo
Canadian Forces Base Shilo -
Building Construction - Canadian Forces Base Shilo
Canadian Forces Base - Shilo -
Ortona Road Fireguard Expansion - Canadian Forces Base Shilo
Canadian Forces Base Shilo -
Area A Security Fence - Canadian Forces Base Shilo
Canadian Forces Base Shilo -
Construction of Land Vehicle Crew Training System Building - Canadian Forces Base Shilo
Canadian Forces Base Shilo -
Royal Avenue Reconstruction - Canadian Forces Base Shilo
Canadian Forces Base Shilo -
N132 Petroleum, Oils and Lubricants (POL) Revitalization - Canadian Forces Base (CFB) Shilo
Canadian Forces Base (CFB) Shilo -
Reconstruction of Rifle Range 2 - Canadian Forces Base Shilo
Canadian Forces Base Shilo -
Larkhill Avenue Reconstruction - Canadian Forces Base (CFB) Shilo
Canadian Forces Base (CFB) Shilo -
Construct Transition Centre - Canadian Forces Base (CFB) Shilo
Canadian Forces Base (CFB) Shilo -
Installation of Running Trail - Canadian Forces Base Shilo
Canadian Forces Base Shilo -
Housing Renovations (HAYSL80) - Canadian Forces Base Shilo
Canadian Forces Base Shilo -
Construction of Land Vehicle Crew Training System Building
Canadian Forces Base/Area Support Unit Shilo -
Construction of New Supply Well- Canadian Forces Base (CFB) Shilo
Canadian Forces Base (CFB) Shilo -
Erosion Control on Hales Creek within the Lake Winnipeg Basin with Sioux Valley Dakota Nation
Sioux Valley Dakota Nation -
Base Refueling Point Tank Replacement
CFB/ASU Shilo -
Birdtail Sioux Dakota Nation Prevention Centre for the Delivery of FNCFS
Birdtail Sioux Dakota Nation -
Water Retention within the Lake Winnipeg Basin with Sioux Valley Dakota Nation
Sioux Valley Dakota Nation -
Lake Manitoba - South Access Road Upgrades - 2324
Lake Manitoba -
Demolition of Unnamed Building at Waggle Springs - Canadian Forces Base Shilo
Waggle Springs -
Birdtail Sioux First Nation Aerated Lagoon Project
Birdtail Lagoon First Nation -
O-Chi-Chak-Ko-Sipi First Nation Water Treatment Plant Upgrades
O-Chi-Chak-Ko-Sipi First Nation Water Treatment Plant Upgrades -
Launch Ramp Reconstruction - Mossey River, MB - Fall 2021
Mossey River Harbour -
PADCOM Potash Solution Mining Project
16 kilometres west of Russell -
New Fibre Installation - RFNOW
Project site 1: CA12:CARBS-SLFN-23 -
Lake Manitoba and Lake St. Martin Outlet Channels Project
Lake Manitoba Outlet Channel inlet in Lake Manitoba -
Energy East Project
Moosomin -
Lake Manitoba and Lake St. Martin Outlet Channels Project
Lake Manitoba Outlet Channel outlet on Lake St. Martin -
Pinaymootang First Nation Water Treatment Upgrades
Pinaymootang First Nation -
Saskatchewan Agriculture Drainage Network - Blackbird Creek Drainage Network Project
50 kilometres east of Yorkton, Saskatchewan -
Keeseekoose - Agricultural Permit - K. Martenuik
Keeseekoose - Agricultural Permit - K. Marteniuk -
Dakota Women's Lodge (Winyan Tipi)
Portage la Prairie -
Long Plain - CHRT41 - Prevention Centre - P055810 - 2324
Long Plain First Nation -
Dakota Tipi First Nation - New Jordan's Principle Facility
Dakota Tipi First Nation -
Long Plain School Renovation & Addition
Long Plain First Nation -
Long Plain FN - Directional Drilling - Water and Sewer Pipeline
Long Plain First Nation -
Long Plain First Nation - Water Treatment Plant Upgrades
Long Plain First Nation -
Cote First Nation Solid Waste Transfer Station
Cote IR 64 -
Skownan First Nation Waste Site Closure and Eco-Depot Facility
Skownan First Nation -
Skownan New Child and Family Services Prevention Building
Skownan First Nation -
Enbridge Pipelines Inc. - Line 3 Replacement Program
Cromer -
Little Saskatchewan First Nation - Mino-Aya-Win Centre
Little Saskatchewan First Nation -
Pine Creek First Nation - New Access Road (Phase 1 Road and School Area Road)
Road A - Phase I Road -
Vehicle and Equipment Management Agency Radio Services Radiocommunication Antenna Addition on Pine Creek First Nation Reserve No. 66A
Pine Creek First Nation, MB -
New Broadband Communications North Inc. Telecommunication Tower on Pine Creek First Nation Reserve No. 66A
Pine Creek First Nation, MB -
New Fibre Installation - Dauphin River
Project site 2: Obushkudayang Indian Reserve -
Pine Creek First Nation - New Access Road (Phase 1 Road and School Area Road)
Road B - School Area Road -
Lake St. Martin - Water Treatment Plant Zebra Mussels Control
Lake St. Martin -
Swan Lake First Nation Youth & Prevention Centre
Swan Lake First Nation -
Saskatchewan Agriculture Drainage Network - Atwater Drainage Network Project
60 kilometres southeast of Yorkton -
Saskatchewan Agriculture Drainage Network - Atwater Drainage Network Project
60 kilometres southeast of Yorkton -
Saskatchewan Agriculture Drainage Network - Atwater Drainage Network Project
60 kilometres southeast of Yorkton -
Saskatchewan Agriculture Drainage Network - Atwater Drainage Network Project
60 kilometres southeast of Yorkton -
Saskatchewan Agriculture Drainage Network - Atwater Drainage Network Project
60 kilometres southeast of Yorkton -
Lake Manitoba and Lake St. Martin Outlet Channels Project
Lake St. Martin Outlet Channel inlet on Lake St. Martin -
New Fibre Installation - Central and Southeastern SK
Project site 1: Cote 64 -
Cote First Nation #64 - Landfill decommissioning at the Main Landfill Site
Badgerville -
Cote First Nation Main Landfill Decommissioning
Cote IR 64 -
Cote First Nation Wood Treatment Remediation Project
Cote IR 64 -
Active Transportation for Ochapowace First Nation
Active Transportation for Ochapowace First Nation -
Key Junction Gas Bar & Confectionery
The Key First Nation -
New Fibre Installation - Central and Southeastern SK
Project site 6: COTE I.R. 64 -
Walkway to support healthy lifestyle for Cote First Nation
Bagerville -
Upgrade Single Tower & New Fibre Installation
Project Site 2: Central East region -Badgerville -
New Peguis First Nation Radiocommunication Tower in Peguis, MB
Peguis, MB -
Zagime Anishinabek First Nation - Section 95 housing project
Sakimay 74-5 -
Xplornet Communications Inc. Radiocommunication Antenna Addition on Peguis First Nation Reserve No. 269
Peguis First Nation Reserve No. 269 -
Ochapowace Nation Water Treatment Plant Upgrades
Ochapowace Nation -
New Fibre Installation
Project Site 5: Ochapowace -
Peguis First Nation Recreation Centre Soil Remediation
Peguis First Nation Recreation Centre Soil Remediation -
Ochapowace Nation Subdivision - Phase I
Ochapowace Nation -
Keeseekoose Education Center Drainage
KEESEEKOOSE INDIAN RESERVE NO. 66 -
Keeseekoose - Agricultural Permit - S. Marsh
Keeseekoose - Agricultural Permit - S. Marsh -
Keeseekoose Multi-Purpose Health facility
Keeseekoose IR 66 -
New Fibre Installation - Central and Southeastern SK
Project site 10: KEESEEKOOSE I.R. 66 -
Zagime Community Center
Zagime IR #74-3 -
Hydrometric Station Decommissioning - Fisher River, Manitoba
Fisher River, Manitoba -
Zagime Anishinabek Solid Waste Transfer Station
Sakimay IR 74 -
Restoring Wetlands Within the Lake Winnipeg Basin with Cowessess First Nation SW-29-20-04-2
Cowessess First Nation -
Boissevaine Port of Entry: Paving Replacement
Boissevain Port of Entry -
Lena Port of Entry Redevelopment
Lena Port of Entry -
Vehicle and Equipment Management Agency Radiocommunication Antenna Addition in Manitou, MB
Manitou -
Kahkewistahaw First Nation Subdivision Development (Phase 23)
Kahkewistahaw IR 72 -
Kahkewistahaw First Nation Water Treatment Plant Upgrade
Kahkewistahaw First Nation -
New Fibre Installation
Project Site 4: Kahkewistahaw -
Kahkewistahaw First Nation Green Links and Teaching Garden: Connecting Elders and Youth
Kahkewistahaw First Nation -
Kahkewistahaw First Nation Operations & Maintenance Building and Fire Hall
Kahkewistahaw First Nation -
Keeseekoose Road to Community Wells
KEESEEKOOSE INDIAN RESERVE NO. 66 -
Keeseekoose First Nation Well Completions
KEESEEKOOSE INDIAN RESERVE NO. 66 -
Kahkewistahaw First Nation Lagoon Upgrade
Kahkewistahaw IR 72 -
Saskatchewan Agriculture Drainage Network - 600 Creek Drainage Network Project
20 kilometers southeast of Storthoaks -
Kahkewistahaw First Nation Solid Waste Transfer Station
Kahkewistahaw IR 72 -
Dauphin River Harbour Manitoba - Routine Maintenance Dredging of the Dauphin River at Lake Winnipeg - Winter 2019
Dauphin River Harbour -
Dauphin River Small Craft Harbour Dredging and Pile Installation
Dauphin River Small Craft Harbour -
Xplornet Communications Inc. Telecommunication Tower at Canada Border Services Agency - Cartwright Port of Entry, MB
Cartwright, MB -
Cartwright Port of Entry Redevelopment
Cartwright Port of Entry -
New Fibre Installation - Dauphin River
Project site 1: Anama Bay -
Manitoba-Minnesota Transmission Project
Riel Converter Station, near Dorsey, Manitoba -
Yorkton Tribal Council Child & Family Services Office Building
Kahkewistahaw IR 92 A-1 -
Cowessess - Agricultural Permit G. Lerat
Cowessess Indian Reserve 73 -
Lake Manitoba and Lake St. Martin Outlet Channels Project
Lake St. Martin Outlet Channel outlet on Lake Winnipeg -
Fisher River Cree Nation Jordan Principle Building
Fisher River Cree Nation -
Cowessess First Nation Solid Waste Transfer Station
Cowessess First Nation -
White Bear First Nation Solid Waste Transfer Station Project
White Bear First Nation -
Restoring Wetlands Within the Lake Winnipeg Basin with Cowessess First Nation SE-08-19a-05-2
Cowessess First Nation -
Crooked Lake Outlet Structure Replacement
Crooked Lake - SW-08-19A-05 W2M -
New Fibre Installation
Project Site 2: Cowessess -
Restoring Wetlands Within the Lake Winnipeg Basin with Cowessess First Nation
Cowessess First Nation -
White Bear First Nation Community Spray Park
White Bear 70 -
The Key First Nation Lagoon Upgrade Project
The Key First Nation -
Fisher River Used Oil Burner Installation
Fisher River Cree Nation -
Fisher River Cree Nation East Road Replacement Project
Fisher River Cree Nation Reserve no. 44 -
The Key First Nation Firehall
The Key First Nation -
New Fibre Installation
Project Site 1: White Bear -
Restoring Wetlands Within the Lake Winnipeg Basin with Cowessess First Nation NW-23-14-05-2
Cowessess First Nation -
Rockwood National Wildlife Area Water Control Structure Re-naturalization Project
Rockwood National Wildlife Area -
Restoring Wetlands Within the Lake Winnipeg Basin with Cowessess First Nation NE-06-17-05-02
Cowessess First Nation