Backfit of CANEX gas station (B147)

This project consists of work execution, labor, materials/supplies and tools needed for the backfit of the CANEX gas station (B147). Work includes but is not limited to: installation of a new emergency stop button on front of the building, repositioning and reactivation of the external alarm, adding an audio signal relay at the cash register counter, adding leak detection sensors to the gas pumps, adding a spill kit in the gas filling area, reconnect the Transport Layer Security (TLS) system and adding display on the site. Excavation and off-site disposal of soil will be necessary. The excavation will be located between the gas pumps and the building.


Latest update

March 17, 2021 – The Department of National Defence issued its Notice of Determination and determined that the project is not likely to cause significant adverse environmental effects.

Participate

Contacts

Michel Lajoie
Department of National Defence
Michel Lajoie, Wing Environment Officer, 3 Wing / CFB Bagotville
Building 60, Post Office Box 5000 Station Forces
Alouette, Quebec G0V 1A0
Telephone: 418-677-4000 ext. 4004
Email: Michel.Lajoie@forces.gc.ca


  • Location

    • 3 Wing Canadian Forces Base Bagotville, situated in the district of La Baie, in the city of Saguenay (Quebec)
  • Nature of Activity

    • Soil management
  • Assessment Status

    Completed
  • Start Date

    2021-02-03
  • Proponent

    Department of National Defence
  • Authorities

    • Department of National Defence
  • Assessment Type

    Project on federal lands
  • Reference Number

    81351