Replacement of the bridge (P-06925) over the Papinachois River

The existing bridge over the Papinachois River (Route 138) is hydraulically inadequate and deficient according to MTQ structural inspection criteria, particularly in terms of its foundations, support equipment and headframe. It is to be replaced by a new bridge that will be built higher and will have a single span. The existing pile currently in the river will be dismantled


Latest update

 

Québec - December 13, 2022Indigenous Services Canada has determined that the proposed replacement of the bridge (P-06925) over the Papinachois River is not likely to cause significant adverse environmental effects.

Participate

Key documents

Key documents
Document Number Document Title File Date
2 Notice of Determination for the Replacement of the bridge (P-06925) over the Papinachois River - December 13, 2022
1 Public Comment Period on Intent to Make a Determination PDF (525 KB) December 16, 2019

Contacts

Isabelle Dery, Senior Environment Advisor
320 St-Joseph Est Office 400
Québec, Quebec G1K 9J2
Email: aadnc.qcevalenvenvassessqc.aandc@canada.ca


  • Location

    • Pessamit (Quebec)
  • Nature of Activity

    • Bridges
  • Assessment Status

    Completed
  • Start Date

    2019-12-16
  • Proponent

    Ministère des Transports du Québec (MTQ)
  • Authorities

    • Indigenous Services Canada
  • Assessment Type

    Project on federal lands
  • Reference Number

    80377
Disclaimer

This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.

 

Nearby assessments

...within 200 kilometres
Date modified: