Ventilation Installation Electrical Rooms - Various Buildings

This project consists of work execution, labor, materials/supplies and tools needed for installing ventilation systems in electrical / mechanical / other rooms in multiple buildings (B60, B66, B78, B81, B87, B117, B123, B133, B216, B225, B306, H6, H7). The work involves, but is not limited to: walls opening, insulation, installation, relocation, dismantling and connection of the following equipment: ventilation ducts, piping, circuit breakers, electrical boxes, control panels, shutters, cables, ventilation outlet, fans and all the necessary equipment to carry out the openings and other essential work for the project realization. An air conditioner will also be dismantled. Management of contaminated residual materials and excavation work at building 66 for foundation drilling are also included in the project.


Latest update

May 11, 2021 – The Department of National Defence issued its Notice of Determination and determined that the project is not likely to cause significant adverse environmental effects.

Participate

Contacts

Michel Lajoie
Department of National Defence
Michel Lajoie, Wing Environment Officer, 3 Wing / CFB Bagotville
Building 60, Post Office Box 5000 Station Forces
Alouette, Quebec G0V 1A0
Telephone: 418-677-4000 ext. 4004
Email: Michel.Lajoie@forces.gc.ca


  • Location

    • 3 Wing Canadian Forces Base Bagotville (Quebec)
  • Nature of Activity

    • Building and Property Development
    • Maintenance activities (fences, walls)
  • Assessment Status

    Completed
  • Start Date

    2021-03-31
  • Proponent

    Department of National Defence
  • Authorities

    • Department of National Defence
  • Assessment Type

    Project on federal lands
  • Reference Number

    81485
Disclaimer