Rehabilitation of the lighthouse of l'île aux Oeufs
This is a non-designated project on federal lands or outside Canada. The listed authorities are responsible for the project assessment.
Work on the Île aux Oeufs lighthouse this year includes scraping the exterior siding of the lighthouse, repairing damaged concrete surfaces and repainting the lighthouse. The goal is not to completely strip the exterior of the headlight, but rather to remove the peeling paint and clean the surface thoroughly so that the new layers of paint adhere well to the exterior siding. The ground around the lighthouse will have to be covered with a canvas that will catch residues and paint shavings as the scraping is done to avoid spreading contaminants. After scraping, concrete or any other area of the structure should be repaired before painting. Finally, the exterior of the lighthouse will be repainted using rollers or brushes depending on feasibility. The paint layer will act as a sealant to prevent the remaining old lead paint, if any, from peeling and contaminating the surrounding soil.
Disclaimer
This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.
Latest update
Participate
Key documents
Document Number | Document Title | File | Date |
---|---|---|---|
1 | Notice of Determination | - | August 25, 2023 |
Contacts
DFO-RPSS-RQDepartment of Fisheries and Oceans
Martin Petit
104 Dalhousie
Québec, Quebec G1K 7Y7
Email: MPO.Environnement_BIESS_QUE-Environment_RPESS_QUE.DFO@dfo-mpo.gc.ca
-
Location
- Île-aux-Oeufs (Quebec)
-
Nature of Activity
- Maintenance activities (fences, walls)
-
Assessment Status
Completed -
Start Date
2023-06-30 -
Proponent
DFO-RPESS-QUE -
Authorities
- Fisheries and Oceans Canada
-
Assessment Type
Project on federal lands -
Reference Number
85731
Nearby assessments
...within 200 kilometres-
North Shore Extension / Saguenay - Sept-Iles Natural Gas Pipeline
Sept-Îles -
Decontamination and deconstruction of buildings and installations - Ile du Corossol
Corossol Island -
Expansion of an iron ore storage area and extension of the railway
Port of Sept-Îles -
Runoff management system optimization project at Pointe-Noire facilities
Pointe-Noire -
Kami Iron Ore Project
Pointe-Noire -
Construction of a warehouse for the temporary storage of refractory bricks
Port of Sept-Iles -
Côte-Nord Mining Railway Project
Sept-Îles to Emeril Junction (Labrador) -
Arnaud Mining Project
Sept-Îles -
Pointe-aux-Basques wharf modernization project at the Port of Sept-Îles
Pointe-aux-Basques -
Renovation of the Mgr-Blanche terminal at the Port of Sept-Iles
Port of Sept-Iles -
BA042154 Heating system conversion - Buildings B300/B301
HMCS Jolliet, in the city of Sept-Îles -
Construction of 200 housing units and supporting infrastructures.
Uashat -
Sept-Îles Airport - Remplacement of a reservoir
Sept-Îles Airport -
Enclosure Drainage at Sept-Iles Airport
Sept-Iles Airport -
Installation of a concrete slab and a new 25,000 L reservoir at Sept-Îles airport
Sept-Îles -
Glamping Mani-Utenam
Mani-Utenam -
Ecocentre development in Uashat Mak Mani-Utenam
Uashat Mak Mani-Utenam -
[Residential Development and Storm Outfall Construction, Mani-Utenam]
Mani-Utenam (Malioténam) -
Construction of 200 housing units and supporting infrastructures.
Mani-Utenam -
Mani-Utenam drinking water plant upgrade
Mani-Utenam -
Construction of the necessary infrastructure and production of spirulina
Mani-Utenam -
[Residential Development and Storm Outfall Construction, Mani-Utenam]
Mani-Utenam (Malioténam) -
EXTENSION OF THE DRINKING WATER SUPPLY NETWORK COMMUNITIES OF MANI-UTENAM AND PLACE DE LA BOULE
Mani-Utenam (Malioténam) -
Equipment shelter replacement
Moisie -
Residential development 42-R
Pessamit -
Replacement of the bridge (P-06925) over the Papinachois River
Pessamit -
Residential Development 40-R Phase 2
Pessamit -
Removal of a sign in the Pointe-au-Père National Wildlife Area
Pointe-au-Père National Wildlife Area -
Sediment rehabilitation and demolition of Miguasha wharf, Quebec
Miguasha wharf -
Drinking Water Treatment Plant Upgrades
Listuguj -
Riverside Extension
Listuguj -
Mi'gmaw Language & Cultural Community Centre
Listuguj -
Construction of Lentug Street and reconstruction of Eagle Street
Gesgapegiag Community -
Gasgusi Street Extension
Gesgapegiag -
Rehabilitation of the lighthouse and heliport of île Bicquette
île Bicquette -
Tiny Home Subdivision
Eel River Bar First Nation -
Eel River Bar Osprey Truckstop Expansion
Eel River Bar First Nation -
Maintenance Dredging at Rivière-au-Tonnerre Fishing Harbour
Rivière-au-Tonnerre Fishing Harbour -
Eel River Bar - Child and Family Service Building
Eel River Bar First Nation -
Demolition of the Cap à la Carre navigation aid structure
Cap à la Carre -
Basin Dredging, New Mills Small Craft Harbour, New Brunswick
New Mills