Parks Canada Agency Miette Road Rehabilitation - Part B - Washout
This is a non-designated project on federal lands or outside Canada. The listed authorities are responsible for the project assessment.
This project will be assessed with a basic impact assessment.
In June 2023 the Miette area experienced a major precipitation event which resulted in a wash out that significantly damaged a section of Miette Road. This event resulted in the prolonged closure of Miette Hot Springs and many surrounding facilities. Emergency engineering investigation and repair work was conducted from June to September 2023. A temporary repair solution permitting single lane traffic has been completed. However, a long-term solution is required to restore two lane traffic and prevent future road wash out occurrence. This project is aimed at providing the long-term solution to ensure safe access to the Miette Region. Miette Road is the only access road to several popular attractions and accommodation facilities in Jasper National Park. The road has insufficient drainage, slope instability and structural deficiencies, as evidenced by the road washout. Upon completion, this project will improve safety, improve the climate resilience of the Miette Road, and reduce the frequency of unplanned emergency repairs on the road and effectively reduce the risk of facility closures for Miette Hot Springs and third-party businesses
The work scope involves realigning the existing road toward the north-east direction so that a safe offset distance can be maintained from the edge of slope. The work will involve clearing/cutting existing the embankment, removal of vegetation, installation of new roadside ditch, installation of culvert drainage infrastructure, relocation of existing utilities, and construction of new road alignment (subbase and surface paving).
Amendment 1 - signed and approved February 21, 2025:
Parks Canada is proposing an amendment to the Miette Road Rehabilitation project. The proposed amendment would include the addition of work scope to repair a significant backslope sliding failure along an approximate 200m stretch of Miette Road (Part A) adjacent to the washout section (Part B). The proposed work scope of Part A would involve cutting back the bottom of the existing back slope to re-establish the roadside ditch, expanding the road with a gravel shoulder and installing lock block barrier to catch fallen debris.
Latest update
Participate
Key documents
| Document number | Document title | File | Date |
|---|---|---|---|
| 1 | New project being assessed by Parks Canada - Public comments invited from February 3 to March 5, 2025 | - | February 3, 2025 |
Contacts
Jasper National ParkBox 10
Jasper, Alberta T0E 1E0
Telephone: 780-852-6141
Email: evaluationdimpactjasper-jasperimpactassessment@pc.gc.ca
Disclaimer
This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.
-
Location
- Jasper National Park (Alberta)
-
Nature of Activity
- Highways and Roads
-
Assessment Status
In progress -
Start Date
2025-02-03 -
Proponent
Parks Canada -
Authorities
- Parks Canada Agency
-
Assessment Type
Project on federal lands -
Reference Number
89241
Nearby assessments
...within 200 kilometres-
Miette Road Rehabilitation - Part C - Morris Creek Culvert Replacement
Jasper National Park of Canada -
ATCO Miette 5L215 Rebuild
Jasper National Park -
Pursuit Miette Mountain Cabins Redevelopment
Jasper National Park -
Depth of Cover Mitigation at four sites on the 114.3 mm Jasper Transmission Pipeline in Proximity to the Fiddle River
Jasper National Park -
Parks Canada Agency Snaring River Bridge Rehabilitation
Jasper National Park of Canada -
Trail 8c Realignment
Jasper National Park of Canada -
Jacques Lake Realignment
Jasper National Park of Canada -
Parks Canada Agency Douglas Fir Slopes Prescribed Burn
Jasper National Park -
JTA - Hochimini Trail Realignment
Jasper National Park -
Trans Mountain Fibre Gaps Project
Jasper National Park -
Caribou Conservation Breeding and Augmentation Project in Jasper National Park
Jasper National Park, Detailed Impact Assessment -
Parks Canada Agency Backcountry Meadows Prescribed Burn
Jasper National Park -
Parks Canada Agency Connaught East Waterway Restructure
Jasper National Park -
Jasper Park Lodge Maintenance and Golf Maintenance Compounds, General Manager's Cabin & Superintendent's Cabin Rebuild - Post-Wildfire
Jasper National Park -
Pine Bungalows Master Plan 2021
Jasper National Park -
Parks Canada Agency Pyramid Bench Fire Guard Prescribed Burn
Jasper National Park of Canada -
ATCO Electric - Pyramid Bench Underground Conversion
Jasper National Park -
Parks Canada Pyramid Bench Wildfire Risk Reduction 2025-2030
Jasper National Park -
Parks Canada Agency - Trail 8c Re-route in Jasper National Park
Jasper National Park -
Trail 1a Jasper National Park
Jasper National Park -
Redevelopment of 702 Connaught Drive - 7-Eleven Convenience Store and Gas Bar
Jasper National Park of Canada -
Petro Canada Wildfire Rebuild
Jasper National Park of Canada -
Tekarra Lodge Wildfire Rebuild
Jasper National Park of Canada -
Trans Mountain Corporation Sleepy Hollow Line Replacement
Jasper National Park -
Biocontrol of Linaria dalmatica (Dalmatian Toadflax) using the agent Mecinus janthiniformis (Stem-boring weevil) in Jasper National Park
Jasper National Park of Canada -
Coalspur Vista Coal Mine Phase II Expansion Project
3.5 kilometres east of Hinton -
Anticipatory Proposed Site Development for Municipality of Jasper Interim Housing Outside Townsite
Jasper National Park -
Jasper House Bungalows Master Plan
Jasper National Park -
Jasper House Bungalows Wildfire Rebuild Master Plan
Jasper National Park of Canada -
Parks Canada Agency Whistlerville Housing Rebuild and Utilities to Marmot Meadows
Jasper National Park -
Vista Coal Mine Phase II Expansion Project
Hinton -
Vista Coal Underground Mine Project and Vista Mine Phase II Expansion Project
10 kilometres east of Hinton -
Trans Mountain Miette River Encroachment 1.25
Jasper National Park of Canada -
Trans Mountain Miette River Encroachment 2 (KP386.75)
Jasper National Park of Canada -
Trans Mountain Pipeline Site KP387 Bioremediation
Jasper National Park of Canada -
Parks Canada Agency Valley of the Five Lakes Trail Restoration
Jasper National Park of Canada -
Parks Canada Agency Highway Operations Unit Marmot Pit Expansion-Winter Abrasives
Jasper National Park -
Parks Canada Agency Highway Operations Unit Marmot Pit Expansion-Winter Abrasives
Jasper National Park -
Trans Mountain Pipeline Fiddle River Hazard Remediation
Jasper National Park -
Parks Canada 8-Mile Pit Expansion and Aggregate Extraction
Jasper National Park -
Marmot Basin Knob Chair Lift Line Replacement
Jasper National Park of Canada -
Marmot Basin Knob Area Avalanche Berm
Jasper National Park of Canada -
Trans Mountain Derr Creek Bridge Replacement
Jasper National Park of Canada -
Trans-Mountains KP400.2 Derr Creek - TMPL 24" Depth of Cover and Bank Protection Mitigation
Jasper National Park -
Trans Mountain Miette River Bridge Replacement
Jasper National Park -
Evelyn Creek trail re-adoption into official trail network
Jasper National Park -
Trans Mountain Miette River Encroachment Site 6
Jasper National Park of Canada -
Trans Mountain Pipeline ULC KP404 Integrity Dig
Jasper National Park of Canada -
Trans Mountain Miette River Encroachment 6.5
Jasper National Park of Canada -
Robb Trend Coal Mine Expansion Project
Robb -
Pyramid Lake Resort Wastewater Treatment Plant and Disposal System
Jasper National Park -
Pyramid Bench Wildfire Risk Reduction
Jasper National Park of Canada -
Parks Canada Agency Prescribed Burns- Southesk, Talbot Lake
Jasper National Park -
Cascade Power Plant Project
Yellowhead County -
Highway 947 Extension Project
Edson -
Parks Canada Agency Brazeau Lake Bridge Replacement
Jasper National Park of Canada -
Pursuit - Columbia Icefield Discovery Centre - Wastewater Treatment System and Building Replacement
Jasper National Park -
Summit Mine 14 Project
Grande Cache -
Pursuit - Columbia Icefield Adventure Tour Road Maintenance Program
Jasper National Park of Canada -
Highway 93 N 2020 Rip Rap Sourcing Program
Banff National Park -
Edson Mainline Expansion Project
Drayton Valley -
Highway 947 Extension Project
-
Big Horn Reserve Water System
Big Horn Reserve No. 144A -
Stoney Big Horn AORHS and Health Center Project
Stoney Nakoda Nation -
Stoney Big Horn Fire Hall
Big Horn Reserve -
Alexandra Patrol Cabin Demolition and Removal
Banff National Park -
New Fibre Installation
Big Horn 144A - site 2(BH-FSA) -
New Fibre Installation
Big Horn 144A - site 1(BH-POP) -
Stoney Nation Big Horn Wastewater System
Big Horn No. 144A -
Rampart Creek Culvert Replacement
Banff National Park of Canada -
Edson Mainline Expansion Project
Drayton Valley -
OS-7255 Authorization to Construct and Operate a Surface Lease for a Borrow Pit, a multi-well pad and log deck.
Alexander First Nation 134A -
RW-4852 and OS-7246 Authorization to Construct and Operate a Right of Way for a natural gas Pipeline and associated riser
Alexander First Nation -
Owen Creek Warden Cabin Decommissioning
Banff National Park -
O'Chiese Culvert 2 Replacement Project
O'Chiese First Nation -
RW-4853 oil and gas pipeline O'Chiese IR203
RW-4853 oil and gas pipeline O'Chiese IR203 -
OS-7256 oil and gas surface lease O'Chiese IR203
OS-7256 oil and gas surface lease O'Chiese IR203 -
Proposed Pipeline from 15-27 to 09-28-044-10W5M in O'Chiese Indian Reserve No. 203
Proposed Pipeline from 15-27 to 09-28-044-10W5M in O'Chiese Indian Reserve No. 203 -
O'Chiese Culvert 1 Replacement Project
O'Chiese First Nation -
Proposed Wellsite Expansion within 15-27-044-10W5M and associated Borrow Pit in O'Chiese First Nation Reserve
O'Chiese First Nation Reserve No. 203 -
O'Chiese Culvert 3 Replacement Project
O'Chiese First Nation -
Ruddock Creek Mine Project
Avola -
O'Chiese Indian Reserve 203 Well pad Expansion
O'Chiese Reserve 203 -
O'Chiese Indian Reserve 203 Well pad Expansion
O'Chiese Reserve -
Proposed Pipeline from 03-15 to14-10-043-10W5 located in Sunchild Indian Reserve No. 202
Sunchild First Nation Reserve #202 -
Alexis Nakota Sioux Nation 1993 Spill Remediation Project
Alexis Nakota Sioux Nation -
Sunchild 202 Reserve oil and gas development OS-7243
Sunchild Reserve 202 -
O'Chiese First Nation New School Road Culvert Replacements and Installation Project
O’Chiese First Nation -
Water Survey Canade Silverhorn Water Meter Station
Banff National Park -
Moraine Power Generation Project
Whitecourt -
Sunchild Gas Distribution Line
Sunchild -
O'Chiese Indian Reserve 203
O'Chiese Indian Reserve 203 -
Sunchild Culvert 2 Replacement Project
Sunchild First Nation -
Sunchild First Nation Child and Family Services Temporary Emergency Placement Home and Offices
Sunchild First Nation -
O'Chiese First Nation Education Way North End Subdivision
O'Chiese First Nation -
Sunchild Indian Reserve Pipeline
Sunchild Indian Reserve -
Sunchild First Nation: Community Wastewater Lagoon and Access Road
Sunchild First Nation -
Sunchild First Nation: Community Roads, Residences, and Service Infrastructure Buildout
Sunchild First Nation -
O'Chiese First Nation
O'Chiese First Nation -
Sunchild First Nation Package Water Treatment Plant
Sunchild First Nation -
Application for Approval of the 2021 Pipeline Decommission Program
Alexis Nakota Sioux Nation Whitecourt (IR 32) Reserve Lands -
O'Chiese First Nation Powwow Arbor Replacement
O'Chiese First Nation -
Sunchild Culvert 1 Replacement Project
Sunchild First Nation -
O'Chiese First Nation Former Landfills Closure and Remediation Plan
O'Chiese First Nation -
Proposed Pipeline from 11-06 to 03-02-043-10W5M in Sunchild First Nation Reserve
Sunchild First Nation Reserve #202 -
Proposed Wellsite Expansion within 11-06-043-09W5M and associated Borrow Pit in Sunchild Indian Reserve
Sunchild Reserve -
OS-5844 oil and gas well site Sunchild IR202
OS-5844 Sunchild IR 202 -
O'Chiese First Nation (OCFN) - Baptiste River Bridge Replacement
O'Chiese No. 203 IR -
Lodge at Bow Lake Staff Accommodation, Dining Tent, and Parking Lot
Banff National Park of Canada -
Wildfire Risk Reduction Project 2023-2026- FireSmart work at several facilities in the Lake Louise, Yoho, and Kootenay Field Unit
Banff National Park of Canada -
Edson Mainline Expansion Project
Rocky Mountain House -
NOVA Gas Transmission Ltd. - 2021 NGTL System Expansion Project
Grande Prairie -
Prairie Lights Power Project
Greenview