Design and Construct CJIRU - Geotechnical and Topographical Study at the 8 Wing Trenton Airfield

The proposed geotechnical and topographical investigations, drawings and report will provide information concerning existing conditions and site information for the Quinte West Training Centre construction at the southwest section of the North Property, 8 Wing Trenton. The geotechnical and topographical surveys are to be conducted to provide adequate information to assist the siting, foundations, seismic and design process for the subject new facilities. Project start date will be in the winter of 2020.


Latest update

March 4, 2021 – The Department of National Defence issued its Notice of Determination and determined that the project is not likely to cause significant adverse environmental effects.

Participate

Contacts

8 Wing Environment Officer
Department of National Defence
Andrew Tam, 8 Wing Environment Officer
Post Office Box 1000 Station Forces
Astra, Ontario K0K 3W0
Email: Andrew.Tam@forces.gc.ca

Department of National Defence
Nanette Fliesser, Director Construction Project Delivery C-8
Director General Infrastructure and Environment Engineering Services
101 Colonel By Drive
Ottawa, Ontario K1A 0K2
Telephone: 613-943-8256
Email: Nanette.Fliesser@forces.gc.ca


  • Location

    • 8 Wing/Canadian Forces Base Trenton (Ontario)
  • Nature of Activity

    • Airport and Airfields
    • Building and Property Development
  • Assessment Status

    Completed
  • Start Date

    2021-02-02
  • Proponent

    Department of National Defence
  • Authorities

    • Department of National Defence
  • Assessment Type

    Project on federal lands
  • Reference Number

    81344