Etobicoke Creek Outfall Restoration

The purpose of this project is to restore the existing outlet channels of the storm water management facility to its intended design. The scope includes but not limited to install erosion protection downstream of an emergency spillway, the restoration of soil around sheet piles, installing rock riprap on channel bed and slopes, and confining flow within the sheet pile drops.


Latest update

September 8, 2023- The Greater Toronto Airports Authority issued its Notice of Determination and the project is not likely to cause significant adverse environmental effects.

Participate

Contacts

Greater Toronto Airports Authority (GTAA)
Environmental Services
3111 Convair Drive
Toronto, Ontario L5P 1B2
Email: environment@gtaa.com


  • Location

    • Etobicoke Creek Outfall (Ontario)
  • Nature of Activity

    • Airport and Airfields
  • Assessment Status

    Completed
  • Start Date

    2023-08-01
  • Proponent

    Greater Toronto Airports Authority
  • Authorities

    • Greater Toronto Airports Authority
  • Assessment Type

    Project on federal lands
  • Reference Number

    85697