Septic System Installation and Washroom Construction

The purpose of this project is to install a new sewage disposal system (septic system), bathroom, and trenching for utilities and plumbing on a commercial property to support the experience of campers, staff, and visitors.
The project works will include site preparation, excavation, installation of the septic tank, construction of a new washroom, trenching for utilities, regrading, and revegetation. During this work, proper erosion and sediment control practices will be installed as required, equipment will be driven in the area around the excavation, and fill will be stockpiled on site. The new septic system will be in compliance with the 2012 Ontario Building Code, as amended. 


Latest update

November 30, 2023 - The assessment decision statement has been issued to the proponent.

Participate

Contacts

Rouge National Urban Park
3545 Kingston Road, Floor #2
Scarborough, Ontario M1M 1R6
Telephone: 416-264-2020
Fax: 416-264-2167
Email: rouge@pc.gc.ca


  • Location

    • Rouge National Urban Park (Ontario)
  • Nature of Activity

    • Building and Property Development
    • Waste Management
  • Assessment Status

    Completed
  • Start Date

    2023-10-13
  • Proponent

    Parks Canada
  • Authorities

    • Parks Canada Agency
  • Assessment Type

    Project on federal lands
  • Reference Number

    86009
Disclaimer

This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.

 

Nearby assessments

...within 200 kilometres
Date modified: