Chief Kinosew Awasak Mikiwahp Community Subdivision Development
This is a non-designated project on federal lands or outside Canada. The listed authorities are responsible for the project assessment.
Chief Kinosew Awasak Mikiwahp, in partnership with Driftpile Cree Nation proposes the development of a new residential subdivision at Driftpile River IR No. 150. The subdivision will include greefield development of new roads, water / wastewater / electrical / gas utilities, drainage infrastructure and storwater pond, lighting, flood mitigation berms, and buildings including a family enhancement building, Mihataakaw Sipiy Law and Governance Lodge, Food Sovereignty Program site, vehicle and storage garage, Child and Family Services building, cultural revitalization lodge, ceremonial cultural space, employee housing, and an independent living four-plex building.
The project will require vegetation clearing, grubbing, grading, excavation, import of fill, construction, construction, paving, and operation. The site has been selected for its core access to the community and connectiong to existing roads.
Latest update
The determination was based on a consideration of the following factors:
• impacts on rights of Indigenous peoples;
• Indigenous knowledge;
• community knowledge;
• comments received from the public; and
• technically and economically feasible mitigation measures.
Indigenous Services Canada is satisfied that that the carrying out of the project is not likely to cause significant adverse environmental effects. Therefore, Chief Kinosew Awasak Mikiwahp may carry out the project in whole or in part.
Participate
Key documents
| Document number | Document title | File | Date |
|---|---|---|---|
| 1 | Notice of Intent to Make a Determination – Start of Public Comment Period | - | December 31, 2025 |
Contacts
Environmental Review Process - AlbertaIndigenous Services Canada
Joël Gervais, Senior Environment Officer
630 Canada Place
9700 Jasper Avenue
Edmonton, Alberta T5J 4G2
Email: paeab-erpab@sac-isc.gc.ca
Disclaimer
This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.
-
Location
- Driftpile River IR No. 150 (Alberta)
-
Nature of Activity
- Building and Property Development
- Highways and Roads
-
Assessment Status
In progress -
Start Date
2025-12-31 -
Proponent
Chief Kinosew Awasak Mikiwahp -
Authorities
- Indigenous Services Canada
-
Assessment Type
Project on federal lands -
Reference Number
90124
Nearby assessments
...within 200 kilometres-
Driftpile Cree Nation antenna supporting structure located on the Driftpile Cree Nation in the Municipal District of Big Lakes.
Driftpile Cree Nation antenna supporting structure -
Driftpile Cree Nation Lift Station No. 1 Replacement Project
Driftpile Cree Nation -
Driftpile Health Centre
Driftpile Cree Nation -
Driftpile Cree Nation Housing Project
Driftpile Cree Nation -
Driftpile Cree Nation New Housing Construction Project
Driftpile, AB -
Driftpile Cree Nation Gas Line Connector Project
Driftpile Cree Nation -
DCN 2023 Rapid Housing Project
DCN 2023 Rapid Housing Project -
Driftpile Cree Nation Lagoon Reclamation
Driftpile Cree Nation -
Joussard Harbour Alberta - Routine Maintenance Dredging of the Joussard Harbour at Lesser Slave Lake Alberta - over the next year
Joussard Harbour -
Swan River First Nation Lakefront Development Project
Lesser Slave Lake -
Sucker Creek Housing Project 2020 (4 Units)
Sucker Creek First Nation -
Swan River 32 Lot West Subdivision Project
Swan River First Nation -
Swan River First Nation: Wastewater Lagoon Liner Repair & Sub-liner Drainage Installation
Swan River First Nation -
Swan River First Nation Waste Diversion and Recycling Facility
Swan River First Nation -
New Fibre Installation
Swan River 150E -
Swan River First Nation Housing Project 2019 (5-Units)
Swan River First Nation -
Upgrade (Multiple) Tower
Project Site 2: Sucker Creek FN 150A -
Sucker Creek First Nation Water System Upgrades
Sucker Creek First Nation -
2024-3899-00 Sucker Creek Bridge Assessment
Sucker Creek First Nation -
Three Unit Modular Housing Project
Sucker Creek First Nation -
Kapawe'no First Nation Echo Prairie Waterline Project
Kapawe'no First Nation -
Kapawe'no Adventure Trail Project
Kapawe'no Adventure Trail Project -
Upgrade (Multiple) Tower
Project Site 1: Kapawe'no FN 150B -
Whitefish Lake Fire Guard Project
Whitefish Lake First Nation 155 -
Sawridge First Nation - 2 Single Houses Project - 2025-2026
Sawridge First Nation -
New Fibre Installation - Slave Lake
Project Site 2: Slave Lake -
Whitefish Lake First Nation: Atikameg Child & Family Services Administration Building
Whitefish Lake First Nation -
New (Multiple) Tower Construction & New Fibre Installation
Project Site 4: Utikoomak Lake -
Atikameg Healing Shelter for Women and Children
Whitefish Lake First Nation -
Whitefish Lake First Nation Atikameg CFS Family Preservation and Prevention Building
Whitefish Lake First Nation -
New Fibre Installation - Slave Lake
Project Site 1: Slave Lake -
New Fibre Installation
Project Site 1: Sawridge No. 150G -
Sawridge Band Solar Farm Project
Sawridge Band -
New Fibre Installation
Project Site 2: Sawridge No. 150G -
Black Bear Power Plant Project
Swan Hills -
Sturgeon Lake - 3 Unit Housing
Sturgeon Lake IR No. 154 -
Sturgeon Lake - 3 Unit Housing
Sturgeon Lake IR No. 154 -
Smoky River Wind Project
Municipal District of Smoky River, between Nampa and Falher -
Sturgeon Lake - 3 Unit Housing
Sturgeon Lake IR No. 154 -
Upgrade (multiple) towers
Sturgeon Lake No.154 (Sturgeon Lake Cree Nation) - Site 5 -
Upgrade (multiple) towers
Sturgeon Lake No.154A (Sturgeon Lake Cree Nation) - Site 7 -
Upgrade (multiple) towers
Sturgeon Lake No.154 (Sturgeon Lake Cree Nation) - Site 4 -
ATCO 1123512 - Lubicon Feeder Project
Lubicon Lake IR No. 10240 -
Child and Family Services Building
Sturgeon Lake 154 -
Sturgeon Lake Cree Nation Child and Family Services Modular Office Complex
Sturgeon Lake Cree Nation -
Upgrade (multiple) towers
Sturgeon Lake No.154 (Sturgeon Lake Cree Nation) - Site 2 -
Upgrade (multiple) towers
Sturgeon Lake No.154 (Sturgeon Lake Cree Nation) - Site 1 -
Sturgeon Lake Cree Nation - CU263 Water Treatment Plant & System Upgrade
Sturgeon Lake -
Upgrade (multiple) towers
Sturgeon Lake No.154 (Sturgeon Lake Cree Nation) - Site 6 -
Upgrade (multiple) towers
Sturgeon Lake No.154 (Sturgeon Lake Cree Nation) - Site 3 -
New Fibre Installation
Project Site 1: Little Buffalo -
Lubicon Lake Band - Phase 2B and 3 Housing Lot Development
Hamlet of Little Buffalo -
Lubicon Lake Band Health Centre and Head Start Building
Little Buffalo Lots IR No. 6732 -
Lubicon Lake Band Administration Building
Little Buffalo -
GD 1105220 0XXX - Subd JT (90RUP, 5C) Lubicon Lake Band Ph 1
Lubicon Lake -
Application for Approval of the 2021 Pipeline Decommission Program
Alexis Nakota Sioux Nation Whitecourt (IR 32) Reserve Lands -
Lubicon Lake Band Waste Diversion Station
Little Buffalo -
Woodland Cree CMHC Co-Investment Housing Project - Marten Lake Subdivision (10-Units)
Cadotte Lake -
RW-4852 and OS-7246 Authorization to Construct and Operate a Right of Way for a natural gas Pipeline and associated riser
Alexander First Nation -
OS-7255 Authorization to Construct and Operate a Surface Lease for a Borrow Pit, a multi-well pad and log deck.
Alexander First Nation 134A -
Mihta Askiy Data Center Project
Approximately 40 km northeast of Peace River -
Alexis Nakota Sioux Nation 1993 Spill Remediation Project
Alexis Nakota Sioux Nation -
Moraine Power Generation Project
Whitecourt -
Woodland Cree M.O.M.S Temp Modular Complex
Woodland Cree First Nation -
Woodland Cree First Nation: CUAK9 2025 Five Unit Residential Lot Development and Housing Project
Woodland Cree First Nation -
UBF02669 / CU980 Highspeed Broadband Fiber Optic Network Installation at Woodland Cree First Nation
Woodland Cree First Nation -
Wolverine River Lateral Loop (Carmon Creek Section)
Carmon Lake -
Woodland Cree First Nation Transfer Station
Woodland Cree First Nation -
Loon River First Nation: CU344 Main Access Road Upgrade Project
Loon River First Nation -
166D Pumphouse Upgrades
166D Pumphouse Upgrade -
Loon River First Nation North Central Corridor Loop Temporary Contractor Yard
Loon River First Nation -
Bigstone Cree First Nation Flood Recovery Program: Culvert 166D-08 TSAG ID No. 08 Replacement
Bigstone Cree Nation -
OS-7244 Woodland Cree 226
Woodland Cree 226 -
OS-7239 Woodland Cree 226
OS-7239 -
Loon River First: Nation Industrial Park Warehouse
Loon River First Nation -
Loon River First Nation Wastewater Treatment Facility Upgrade and Expansion
Loon River First Nation -
Bigstone Cree Nation Flood Recovery Program: Culvert 166D-27 Replacement
Bigstone Cree Nation -
Loon River First Nation: Industrial Park Grocery Store
Loon River Cree Nation -
New Fibre Installation
Project Site 4 - Wabasca No. 166D: -
Loon River First Nation: CU363 Emergency Wastewater System Repairs
Loon River First Nation -
Loon River Cree Nation Pure Fibre Network Project
Loon River Cree Nation -
Loon River First Nation: CU350 BF 78716 Bridge Replacement over Loon River
Loon River First Nation -
OS-7241 Wabasca IR 166D | Authorization to Construct and Operate a Surface Lease for an access road and for a multiwell pad
Wabasca IR # 116D -
Loon River First Nation Water Treatment Plant Upgrades Design Construction
Loon River First Nation -
Loon River First Nation: Community Infrastructure Head Start Building
Loon River First Nation -
Maskotehk Flood Mitigation Upgrades - Borrow Pits
Wabasca 166D -
New Fibre Installation
Project Site 2 - Wabasca No. 166B : -
Woodland Cree 226
OS-7238 -
Woodland Cree CMHC Co-Investment Housing Project - Simon Lake Subdivision (21-Units)
Woodland Cree First Nation -
OS-7245 Woodland Cree Reserve 226
Woodland Cree 226 -
Loon River Cree Nation Borrow Pit Project
Loon River Cree Nation -
Bigstone Cree Nation High School Waterline Project
Wabasca -
Bigstone Cree First Nation Flood Recovery Program: Culvert 166A-18 TSAG ID No. 04 Replacement
Bigstone Cree Nation -
New Fibre Installation
Project Site 1 - Bigstone Cree Nation: -
Bigstone Cree Nation Education Authority
Bigstone Cree Nation Education Authority antenna supporting structure located on Bigstone Cree Nation in Wabasca-Desmarais, AB. -
Highway 947 Extension Project
-
Bigstone Cree First Nation Flood Recovery Program: Culvert 166A-17 TSAG ID No. 03 Replacement
Bigstone Cree Nation -
Bigstone B.O.S.S Modular Construction and Fabrication Yard Expansion Project
Bigstone Cree Nation -
Bigstone Cree First Nation Flood Recovery Program: Culvert 166A-10 TSAG ID No. 07 Replacement
Bigstone Cree Nation -
Bigstone Cree Nation Temporary Modular Office Complex
Bigstone Cree Nation -
Bigstone Cree Nation Education Authority
Bigstone Cree Nation Education Authority antenna supporting structure located on Bigstone Cree Nation in Wabasca-Desmarais, AB. -
Bigstone Cree Nation New High School
Bigstone Cree Nation -
Bigstone Cree Nation Education Authority: CU254 Oksi Pasikoniwew Kakik School Secondary Access Road Project
Bigstone Cree Nation -
APEX Utilities Inc. - Opasikoniwew Housing Authority: Hoole Creek Road Subdivision Phase 2 Gasification Project
Wabasca -
Hoole Creek Road Subdivision Apex Utilities
Wabasca 166A -
Bigstone Cree Nation Oilfield Supply Store
Wabasca #166 -
ATCO Gas and Pipelines Ltd.: 1088866 Wabasca IR No. 166A Gas Distribution Extension
Bigstone Cree Nation Wabasca IR No. 166A -
Peerless Housing CMHC Site 2
Peerless Trout IR No. 238 -
Peerless CMHC Housing PTFN Camp Area
Peerless Trout IR No. 238 -
Rogers Communications Inc., new radiocommunications tower (W6238) on Peerless Trout First Nation land, near Trout Lake, AB.
W6238 - Peerless Trout First Nation Land (near Trout Lake) -
Trout Lake Daycare
Peerless Trout IR No. 238 -
Wabasca Water Treatment Plant Upgrades Project
Wabasca -
New Fibre Installation
Project Site 3 - Wabasca No. 166C: -
ATCO Gas and Pipelines Ltd.: 1088866 Bigstone Cree Nation & Hamlet of Sandy Lake Gas Feeder and Mains at Wabasca IR No. 166
Bigstone Cree Nation -
Duncan's First Nation 2025 CMHC 2 Housing
Duncan's IR No. 151A -
Duncan's First Nation 2025 CMHC 2 Housing
Duncan's IR No. 151A -
Peace River Nuclear Power Project
Peace River -
Duncan's First Nation New Subdivision - 22 units
Duncan First Nation -
Regional Assessment of the Montney Formation
Brownvale -
Duncan's First Nation Three Unit Housing Project in Current Sub-Division
Duncan's First Nation -
New Fibre Installation
Project Site 5 - Wabasca No. 166: -
ATCO Gas and Pipelines Ltd.: 1098480 Wabasca IR No. 166 Phase 2 Alfred Road Gas Main & Distribution System
Bigstone Cree Nation -
Bigstone Health Centre
Bigstone Cree Nation -
North Corridor Expansion Project
Peerless Lake -
Rogers Communications Inc., new radiocommunications tower (W6225) on Peerless Trout First Nation land, near Peerless Lake, AB.
W6225 - Peerless Trout First Nation Land (near Peerless Lake) -
Wolverine River Lateral Loop (Carmon Creek Section)
Jackpine Lake -
Meanook National Wildlife Area Buildings Demolition
Meanook National Wildlife Area -
Rycroft Alternative Water Hub Facility Project
Woking -
North Corridor Expansion Project
Highway 88 -
2017 NGTL System Expansion Project
Grande Prairie -
Prairie Lights Power Project
Greenview -
Waheeba Solar Energy Project
Alexis First Nation -
Alexis Gas Distribution to New Town Subdivision (30 Lots) Project
Alexis Nakota Sioux Nation -
Alexis Nakota Sioux Nation Youth Transitional House Project
Alexis Nakota Sioux Nation -
Pasa Tibi Village Elder's Living Facility
Alexis Nakota Sioux Nation -
Rapid Housing Initiative 3 - Hill Plain
Alexis Nakota Sioux Nation -
Alexis Nakota Sioux Junior and Senior High School - Educational dock
Alexis Nakota Sioux Nation