New Fibre Installation
This is a non-designated project on federal lands or outside Canada. The listed authorities are responsible for the project assessment.
Telus Communications Inc. plans to install fiber optic cabling, for Internet purposes, to four (4) Indigenous residential homes in Okanagan, in British Columbia.
The project involves the installation of approximately twenty one point 5 (21.5) km of underground or aerial fiber optic cable as follows:
- One (1) km in NESKONLITH 1.
- Three (3) km in SAHHALTKUM 4.
- Four (4) km in OKANAGAN 1.
- Five hundred (500) m in MEADOW CREEK 3.
- Three (3) km in SALMON RIVER 1 (SPLATSIN).
- Five (5) km in ENDERBY 2.
- Five (5) km in Switsemalph.
The cable will be buried by directional drilling, trenching, or using existing conduits, or a combination of these methods in existing roadway alignments, or will be suspended on support structures to connect to residential homes and businesses.
Latest update
Participate
Key documents
| Document number | Document title | File | Date |
|---|---|---|---|
| 1 | Notice of Intent to Make a Determination - Start of Public Comment Period | - | January 13, 2026 |
Contacts
Innovation, Science and Economic Development Canada / Connected Canada BranchSophie Bélisle, Program Manager
235 Queen Street
1st Floor West Tower, CD Howe Building
Ottawa, Ontario K1A 0H5
Email: Get-connected-branchez-vous@ised-isde.gc.ca
Disclaimer
This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.
-
Location
- Project Site 1: NISKONLITH 1 (British Columbia)
- Project Site 2: OKANAGAN 1 (British Columbia)
- Project Site 3: MEADOW CREEK 3 (British Columbia)
- Project Site 4: SALMON RIVER 1 (British Columbia)
- Project Site 5: ENDERBY 2 (British Columbia)
- Project Site 6: SWITSEMALPH (British Columbia)
-
Nature of Activity
- Other, not otherwise specified
-
Assessment Status
In progress -
Start Date
2026-01-13 -
Proponent
Telus Communications Inc. -
Authorities
- Innovation, Science and Economic Development
-
Assessment Type
Project on federal lands -
Reference Number
90059
Nearby assessments
...within 200 kilometres-
Affordable Housing Units
Adams Lake Indian Band -
BC Ministry of Transportation and Infrastructure Highway 1 Four-Laning
North Bay IR 5 -
TELUS Communications Inc.'s New Antenna Proposal for Existing Tower on Mount Wallensteen.
TELUS Communications Inc.'s New Antenna Proposal for Existing Tower on Mount Wallensteen -
Shuswap North Okanagan Rail Trail
Splatsin First Nation -
New Fibre Installation
Project site 1: Enderby 2 -
Timber harvesting on CHUM CREEK 2 07179 & SCOTCH CREEK 4 07181
SCOTCH CREEK 4 07181 -
Timber harvesting on CHUM CREEK 2 07179 & SCOTCH CREEK 4 07181
CHUM CREEK 2 07179 -
Timber harvesting on Salmon River 1
Salmon River 1 -
Harvesting of damaged timber by the 2023 forest fire on Quaaout 1
Quaaout 1 -
Splatsin Shihiya K4-G7 Elementary School
Splatsin Enderby IR #2 -
New Fibre Installation
Project site 2: Salmon River -
Forest Fuel Management Quaaout #1
Quaaout #1 -
Adams Lake-Sahhltkum IR#4 Water Treatment and Reservoir
07155 - SAHHALTKUM 4 -
Okanagan Indian Band 1 - Fortis BC Natural gas pipeline replacement project
Okanagan Indian Band, Salmon River -
OKIB Round Lake/Madeline Lake/Heart Lake/Salmon River Water System Improvements
Head of the Lake, Vernon BC -
Timber harvesting on Hustalen IR #1 Adams Lake
Hustalen #1 -
New Fibre Installation
Okanagan -
Okanagan Indian Band Gravel Pit Reactivation
Okanagan IR No. 1 -
Head of the Lake Subdivision
Vernon -
Irish Creek/Head of the Lake Water System Upgrades
Okanagan Indian Band IR1 -
New School - Okanagan IR#1 Elementary School
Okanagan Indian Band -
OKIB IR1 Lot 27 & 28 - Gas Station and Convenience Store
OKIB IR1 Lot 27 & 28 -
Timixw Mixed Use Development
Vernon, BC -
Construct Buildings and Washrack at Vernon Military Camp
Vernon Military Camp, 3100 15th Ave, Vernon -
Main Camp Utilities Upgrade at Vernon Military Camp
Vernon Military Camp -
Pump Station Demolition - 3rd Canadian Division Support Group (CDSG), Detachment British Columbia Mainland - Chilliwack
Detachment British Columbia Mainland - Chilliwack -
Pump Station Demolition- 3rd Canadian Division Support Group (CDSG), Detachment British Columbia Mainland - Chilliwack
3rd Canadian Division Support Group (CDSG), Detachment British Columbia Mainland - Chilliwack -
Fence and Obstacle Course - Vernon Military Camp
Vernon Military Camp -
TELUS Cell Tower Cable Upgrade
1100 Mission Rd, Vernon -
Norah's Pond Expansion
Allan Brooks Nature Centre, Vernon, BC -
Automated Weather Station at 250 Allan Brooks Way, Vernon, BC
250 Allan Brooks Way, Vernon -
Vernon Rifle Range Geotechnical Investigation
Vernon Rifle Range -
TteS Road Realignment and Roundabout Project
Kamloops Indian Reserve No. 1 -
Tk'emlúps te Secwepemc CLC Stormwater Detention Facility
Kamloops 1 -
New Fibre Installation
TteS West Tkemlups -
Construction of a building on Kamloops Indian Reserve No. 1, City of Kamloops
Kamloops Indian Reserve No.1, city of Kamloops -
Tk'emlups Commercial Complex Lot 164
Tk'emlúps te Secwépemc 07173 - KAMLOOPS 1 -
Tk'emlúps te Secwépemc Stswékstem Engineered Waste Management Facility
Tk'emlúps te Secwépemc, Kamloops #1 -
New Fibre Installation
Project Site 02: Whispering Pines 4 -
Ajax Mine Project
Kamloops -
Tk?emlúps te Secwépemc - Mount Paul Multi-family Residential Development
Kamloops IR1, BC -
Westsyde Road Multi-Use Pathway
Whispering Pines 4 -
Whispering Pines IR#4 Watermain Extension
Whispering Pines IR#4 -
Shoreline Revetment on Whispering Pines/Clinton Indian Band Reserve Lands
Whispering Pines/Clinton Indian Band Reserve #4 -
Whispering Pines/Clinton Indian Band Living Revetment Site 2B
Whispering Pines/Clinton Indian Band Living Revetment Site 2B -
Westsyde Road Multi-Use Pathway: Phase 2
Westsyde Road Multi-Use Pathway: Phase 2 -
New Fibre Installation
Project Site 06: Louis Creek 4 -
T'kemlúps te Secwépemc - Kamloops IR1, Lot 8-1 and 9, Commercial Lease
Kamloops -
North Thompson Rail Terminal Development Project
Kamloops -
Construction of a new building in Kamloops, British Columbia
324 Mt. Paul Way, Kamloops, British Columbia -
New Fibre Installation
Project Site 10: Kamloops 4 -
Okanagan Indian Band Business Park Phase 1
Lots 1, 1-2, 1-3, and 14, Duck Lake IR7 -
OKIB Business Park, Phase 2
OKIB Business Park, Phase 2 -
Simpcw: Chinook Cove Water System Upgrades and Extension
Simpcw First Nation North Thompson IR1 -
Parking Lot repave
301 3rd Street West, Revelstoke -
Snowforest Campground Upgrades
Mount Revelstoke National Park of Canada -
Timber harvesting on North Thompson 1
North Thompson IR #1 -
Dunn Lake Road Widening and Realignment Project
Simpcw First Nation -
New Fibre Installation
Project Site 08: North Thompson 1 -
Combined Operations Building - Kelowna International Airport
Kelowna International Airport -
Runway End Safety Area - Kelowna International Airport
Kelowna International Airport -
Simpcw Community Centre - NEQWEYQWELSTEN SCHOOL
Simpcw First Nation, North Thompson 1 -
Yellowhead Copper Project
150 kilometres northeast of Kamloops -
Douglas Lake Ranch Transmission 3 - Phase Line Relocation
Douglas Lake IR 3 -
Harper Creek Mine Project
Vavenby -
Upper Nicola Band/Okanagan Nation Alliance Solar Farm Project
NICOLA LAKE 1 -
Upper Nicola Band - Quilchena Community Centre
Upper Nicola Band - Quilchena Community Centre -
Upper Nicola Band - Nicola River Road and Michel Road Drainage Upgrades
Upper Nicola -
Mount Revelstoke Telemetry Tower
Mount Revelstoke National Park of Canada -
Skeetchestn Pipeline Segment Replacement and Valve Site Installation
Site Location -
Skeetchestn Learning Garden Centre
Skeetchestn Indian Band -
New Telus Communications Inc. Telecommunication Tower Project on Skeetchestn Reserve.
Telecommunication Tower Project on Skeetchestn Reserve -
Ruddock Creek Mine Project
Avola -
Lower Nicola Indian Band Community Solar Gardens
Lower Nicola Reserve Lands - Nicola Mameet No. 1, Joeyaska No. 2, and Zoht No. 4 -
Summerland Irrigation Infrastructure Rehabilitation
Summerland -
Summerland Chemical Storage Building Project
Summerland -
Field Covering System and Cherry Orchard
Summerland Research and Development Centre -
Agriculture and Agri-Food Canada Building Demolition at Summerland
Summerland -
Septic Tank Replacement at Edgewood BC Post Office
211 Lakeshore Ave, Edgewood, BC, V0G1J0 -
Penticton IR1 - Bell Media Tower Replacement Project
Penticton IR 1 - Mount Nkwala -
New Fibre Installation
Nooaitch -
Penticton Indian Band Sage Road 24 Lot Subdivision
Penticton Indian Band 24 Lot Sage Road Subdivision Development -
New Rogers Communications Inc. Telecommunication Tower Project in Glacier National Park along Highway 1
New Rogers Communications Inc. Telecommunication Tower Project in Glacier National Park along Highway 1 -
Outma Sqilx'W School Addition
Penticton Indian Band IR. No. 1 -
Hazard Spruce Tree Removal
Glacier National Park -
Shackan - Sand and Gravel operation on Shackan IR11
Shackan 11 -
Project Removed by Federal Authority - Penticton Airport - Lot 28 - Construction of 11 private hangars
Penticton -
Terminated - Penticton Airport - North Apron Expansion
Penticton -
Project Removed by Federal Authority - Penticton Airport - Lot 43 - Canadian Helicopters Ltd - Lease Expansion to Construct New Aircraft Storage Hangar
Penticton -
Ashcroft Indian Band - Community Centre
Ashcroft Indian Band - Community Centre -
Terminated - Penticton Airport Parking Lot Rehabilitation and Expansion
Penticton Airport -
New Fibre Installation
Coldwater -
Kingsvale-Oliver Natural Gas Pipeline Reinforcement Project
Kingsvale -
Cook's Ferry Indian Band, BC
Cook's Ferry Indian Band, BC -
Rogers Communications Inc. Telecommunication Tower Project in Glacier National Park along Highway 1
Rogers Communications Inc. Telecommunication Tower Project in Glacier National Park along Highway 1 -
Sackum Creek Overhead Bridge Replacement
Sackum IR No. 3 and Gulada IR No. 3A -
FortisBC Pipeline Integrity Dig at Vaseux-Bighorn National Wildlife Area
Vaseux-Bighorn National Wildlife Area -
Vaseux Floodplain re-engagement at Vaseux-Bighorn National Wildlife Area
Vaseux-Bighorn National Wildlife Area -
Nzen'man' Bird's Nest Project
Nzen'man' Bird's Nest Project -
Pole Removal at NRC Dominion Radio Astrophysical Observatory
Dominion Radio Astrophysical Observatory, British Columbia -
Boardwalk Replacement Project - Vaseux Bighorn National Wildlife Area
Vaseux-Bighorn National Wildlife Area -
Princeton Detachment Replacement
Princeton -
Underground Conduit Upgrade at NRC Dominion Radio Astrophysical Observatory
Dominion Radio Astrophysical Observatory -
Canadian Hydrogen Observatory and Radio-transient Detector (Dominion Radio Astrophysical Observatory)
Dominion Radio Astrophysical Observatory -
Well and Septic Installation Project at NRC Dominion Radio Astrophysical Observatory
Dominion Radio Astrophysical Observatory -
Fuel tank removal at the NRC Dominion Radio Astrophysical Observatory
Dominion Radio Astrophysical Observatory -
Lytton First Nation - Nuuautin IR2B Subdivision & Stein Water System Improvement Project
Lytton First Nation - Nuuautin IR2B Subdivision & Stein Water System Improvement Project -
Lytton First Nation - Battlefield Housing and Food Hub
Lytton First Nation, Lytton, BC -
Skuppah Indian Band - Food Security Centre
Inklyuhkinatko no 2 reserve -
Lytton First Nation - Stein Water System Intake Improvements Project
Lytton First Nation - Stein Water System Intake Improvements Project -
Skuppah Indian Band - Food Security and Cultural Garden
Inklyuhkinatko Reserve No. 2 -
Kingsvale-Oliver Natural Gas Pipeline Reinforcement Project
Oliver -
Upper Similkameen Indian Band - Water System Upgrades
Chuchuwayha I.R. No. 2 -
Speyum Creek Watercourse Restoration
Speyum Creek -
New Fibre Installation - TELUS
Project Site 01: Lillooet Corridor -
Xaxli'p First Nation Green Hydrogen Production Facility
Xaxli'p Fountain IR1B, Lillooet, BC -
Lower Similkameen Indian Band - Deflection Berms Project
Lower Similkameen Indian Band - Deflection Berms Project -
McCartney's Flat IR#4 Water System Improvements
T'IT'Q'ET McCartney's Flat IR#4 -
Orchard/Vineyard Lease - Lot 42, Similkameen IR#2
Lot 42, Similkameen IR#2 -
Cayoose Creek Water System Connection to Village of Lillooet
Cayoose Creek IR 1 -
DWS Cayoose Creek IR #1 interconnection with DOL
Seton River near Lillooet -
Osoyoos Indian Band - Rendezvous Beach Resort
Osoyoos Indian Band - Rendezvous Beach Resort -
Proposed Vineyard at Osoyoos IR1
Osoyoos IR1 -
Lower Similkameen Indian Band - Flood Mitigation Project
Chopaka 7 & 8 Indian Reserve -
Osoyoos Indian Band - Wolf Creek Affordable Housing Project
Osoyoos Indian Band - Wolf Creek Affordable Housing Project -
Spuzzum First Nation Drinking Water Access Road
Spuzzum Access Road -
Electric Vehicle Charging Station Installation at Osoyoos Border Crossing
Osoyoos Border Crossing -
Yale First Nation Recreation Centre
Stulkawhits No. 8 Reserve Land -
New Fibre Installation
Canoe Creek IR#2 -
Marine yard development
Marine yard development -
Chawathil - Schkam IR#2 Sewer System Improvements
Chawathil, Schkam IR#2 -
Maintenance Dredging - Lhoist North America of Canada Inc.
Maintenance Dredging - Lhoist North America of Canada Inc. -
Record Ridge Mine Project
7 kilometres southwest of Rossland -
Revision to the Posting for IAA Reference Number 85749 (Canoe Creek). Telus Communications Inc. is Proposing a Revision to their Original Telecommunication Tower Project in Canoe Creek I.R. No. 1 on Stswecem'c Xget'tem Nation Lands
Telecommunication Tower Project in Canoe Creek I.R. No. 1 on Stswecem'c Xget'tem Nation Lands -
Stswecem'c Xget'tem First Nation - Telus Telecommunications Tower - Canoe Creek/Meadow Lake
Stswecem'c Xget'tem First Nation -
New Telus Communications Inc. Telecommunication Tower Project in Canoe Creek I.R. No. 1 on Stswecem'c Xget'tem Nation Lands
Canoe Creek I.R. No. 1 on Stswecem'c Xget'tem Nation Lands -
Paterson Port of Entry Redevelopment
Paterson Port of Entry -
New Dock Installation - 317 Sasamat Lane
New Dock Installation - 317 Sasamat Lane -
New Telus Communications Inc. Telecommunication Tower Project in Dog Creek 1 Reserve on Stswecem'c Xget'tem Nation Lands
Dog Creek I.R. No. 1 on Stswecem'c Xget'tem Nation Lands -
Revision to the Posting for IAA Reference Number 85748 (Dog Creek). Telus Communications Inc. is Proposing a Revision to their Original Telecommunication Tower Project in Dog Creek I.R. No. 1 on Stswecem'c Xget'tem Nation Lands.
Telecommunication Tower Project in Dog Creek I.R. No. 1 on Stswecem'c Xget'tem Nation Lands. -
Stswecem'c Xget'tem First Nation - Telus Telecommunications Tower - Dog Creek
Stswecem'c Xgat'tem First Nation -
N'Quatqua-Wastewater and Sludge Management
07991 - NEQUATQUE 1-75805CLSRBC / 75667CLSRBC -
N'Quatqua Multi-Use Facility Project
N'Quatqua Multi-Use Facility Project -
N'Quatqua Watermain Extension and Phase 1 Subdivision
N'Quatqua IR#1 -
Timber Harvesting on Pete Suckers IR 13
Pete Suckers IR 13 -
Esk'Etemc First Nation Road and Drainage Improvements (Alkali Lake)
Alkali Lake 1; Swan Lake 3; and Alkali Lake 4A