OKIB Round Lake/Madeline Lake/Heart Lake/Salmon River Water System Improvements
This is a non-designated project on federal lands or outside Canada. The listed authorities are responsible for the project assessment.
PROJECT DESCRIPTION
Many members of the Okanagan Indian Band (OKIB) community currently do not have reliable access to safe, clean drinking water that is adequately accessible.
- The Madeline Lake water system is currently on a long-term drinking water advisory (do not consume advisory for children under 2 and pregnant women) due to elevated manganese above the Guidelines for Canadian Drinking Water Quality health limit.
- Round Lake, Madeline Lake and Salmon River Water (RMS) systems all have poor water quality, insufficient water source capacity, no treatment of disinfection, no reservoir storage and no operational redundancy. Currently, each of these systems has a single groundwater well for their source.
Upgrades to the water systems are needed to improve the quality and availability of drinking water for the OKIB membership, and to provide fire protection to the community.
Integrating the three small water systems rather that having three independent water systems provides considerable benefits, including significantly reduced capital costs for source, treatment and storage. It will also provide long-term savings in operation and maintenance (O&M) which also reduces the impact on the environment. Extending the distribution system between the three areas will also allow additional lots to connect to the water system rather than having their own private water system.
This project is proposed to address deficiencies with three existing OKIB water systems. The plan is to:
- Interconnect the three water systems with a new distribution system.
- Develop a new well and back-up well.
- Add treatment for iron/manganese removal with disinfection.
- Add a reservoir for equalization and fire protection.
Latest update
OKIB Round Lake/Madeline Lake/Heart Lake/Salmon River Water System Improvements – Public Comments Invited
February 19, 2025 – Indigenous Services Canada must determine whether the proposed OKIB Round Lake/Madeline Lake/Heart Lake/Salmon River Water System Improvements, located in Head of the Lake, Vernon BC is likely to cause significant adverse environmental effects. To help inform this determination, Indigenous Services Canada is inviting comments from the public respecting that determination.
Written comments must be submitted by March 21, 2025 to the BC Environment Team.
Participate
Key documents
| Document number | Document title | File | Date |
|---|---|---|---|
| 1 | Notice of Intent to Make a Determination | PDF (252 KB) | February 19, 2025 |
Contacts
BC Environment TeamIndigenous Services Canada
600-1138 Melville Street
Vancouver, British Columbia V6E 4S3
Email: bcciarpubliccomments@sac-isc.gc.ca
Disclaimer
This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.
-
Location
- Head of the Lake, Vernon BC (British Columbia)
-
Nature of Activity
- Water Management
-
Assessment Status
In progress -
Start Date
2025-02-19 -
Proponent
Okanagan Indian Band -
Authorities
- Indigenous Services Canada
-
Assessment Type
Project on federal lands -
Reference Number
89301
Nearby assessments
...within 200 kilometres-
New Fibre Installation
Okanagan -
Okanagan Indian Band 1 - Fortis BC Natural gas pipeline replacement project
Okanagan Indian Band, Salmon River -
New Fibre Installation
Project Site 2: OKANAGAN 1 -
New Fibre Installation
Project Site 4: SALMON RIVER 1 -
New Fibre Installation
Project site 2: Salmon River -
Timber harvesting on Salmon River 1
Salmon River 1 -
Okanagan Indian Band Gravel Pit Reactivation
Okanagan IR No. 1 -
Head of the Lake Subdivision
Vernon -
Irish Creek/Head of the Lake Water System Upgrades
Okanagan Indian Band IR1 -
Splatsin Shihiya K4-G7 Elementary School
Splatsin Enderby IR #2 -
New School - Okanagan IR#1 Elementary School
Okanagan Indian Band -
OKIB IR1 Lot 27 & 28 - Gas Station and Convenience Store
OKIB IR1 Lot 27 & 28 -
New Fibre Installation
Project site 1: Enderby 2 -
Timixw Mixed Use Development
Vernon, BC -
New Fibre Installation
Project Site 5: ENDERBY 2 -
Main Camp Utilities Upgrade at Vernon Military Camp
Vernon Military Camp -
Construct Buildings and Washrack at Vernon Military Camp
Vernon Military Camp, 3100 15th Ave, Vernon -
TELUS Cell Tower Cable Upgrade
1100 Mission Rd, Vernon -
Fence and Obstacle Course - Vernon Military Camp
Vernon Military Camp -
Pump Station Demolition - 3rd Canadian Division Support Group (CDSG), Detachment British Columbia Mainland - Chilliwack
Detachment British Columbia Mainland - Chilliwack -
Pump Station Demolition- 3rd Canadian Division Support Group (CDSG), Detachment British Columbia Mainland - Chilliwack
3rd Canadian Division Support Group (CDSG), Detachment British Columbia Mainland - Chilliwack -
Norah's Pond Expansion
Allan Brooks Nature Centre, Vernon, BC -
Automated Weather Station at 250 Allan Brooks Way, Vernon, BC
250 Allan Brooks Way, Vernon -
Vernon Rifle Range Geotechnical Investigation
Vernon Rifle Range -
TELUS Communications Inc.'s New Antenna Proposal for Existing Tower on Mount Wallensteen.
TELUS Communications Inc.'s New Antenna Proposal for Existing Tower on Mount Wallensteen -
Shuswap North Okanagan Rail Trail
Splatsin First Nation -
Affordable Housing Units
Adams Lake Indian Band -
New Fibre Installation
Project Site 6: SWITSEMALPH -
BC Ministry of Transportation and Infrastructure Highway 1 Four-Laning
North Bay IR 5 -
New Fibre Installation
Project Site 3: MEADOW CREEK 3 -
Okanagan Indian Band Business Park Phase 1
Lots 1, 1-2, 1-3, and 14, Duck Lake IR7 -
OKIB Business Park, Phase 2
OKIB Business Park, Phase 2 -
Timber harvesting on CHUM CREEK 2 07179 & SCOTCH CREEK 4 07181
CHUM CREEK 2 07179 -
Adams Lake-Sahhltkum IR#4 Water Treatment and Reservoir
07155 - SAHHALTKUM 4 -
New Fibre Installation
Project Site 1: NISKONLITH 1 -
Harvesting of damaged timber by the 2023 forest fire on Quaaout 1
Quaaout 1 -
Timber harvesting on CHUM CREEK 2 07179 & SCOTCH CREEK 4 07181
SCOTCH CREEK 4 07181 -
Combined Operations Building - Kelowna International Airport
Kelowna International Airport -
Runway End Safety Area - Kelowna International Airport
Kelowna International Airport -
Forest Fuel Management Quaaout #1
Quaaout #1 -
Timber harvesting on Hustalen IR #1 Adams Lake
Hustalen #1 -
Tk'emlúps te Secwépemc - East Shuswap Road: Watermain and Reservoir
Harper Ranch Pinantan Road -
TteS Road Realignment and Roundabout Project
Kamloops Indian Reserve No. 1 -
Tk'emlúps te Secwepemc CLC Stormwater Detention Facility
Kamloops 1 -
New Fibre Installation
TteS West Tkemlups -
Tk'emlups Commercial Complex Lot 164
Tk'emlúps te Secwépemc 07173 - KAMLOOPS 1 -
Ajax Mine Project
Kamloops -
Construction of a building on Kamloops Indian Reserve No. 1, City of Kamloops
Kamloops Indian Reserve No.1, city of Kamloops -
Tk?emlúps te Secwépemc - Mount Paul Multi-family Residential Development
Kamloops IR1, BC -
Tk'emlúps te Secwépemc Stswékstem Engineered Waste Management Facility
Tk'emlúps te Secwépemc, Kamloops #1 -
Construction of a new building in Kamloops, British Columbia
324 Mt. Paul Way, Kamloops, British Columbia -
Douglas Lake Ranch Transmission 3 - Phase Line Relocation
Douglas Lake IR 3 -
T'kemlúps te Secwépemc - Kamloops IR1, Lot 8-1 and 9, Commercial Lease
Kamloops -
North Thompson Rail Terminal Development Project
Kamloops -
Upper Nicola Band/Okanagan Nation Alliance Solar Farm Project
NICOLA LAKE 1 -
Upper Nicola Band - Quilchena Community Centre
Upper Nicola Band - Quilchena Community Centre -
Upper Nicola Band - Nicola River Road and Michel Road Drainage Upgrades
Upper Nicola -
New Fibre Installation
Project Site 02: Whispering Pines 4 -
Westsyde Road Multi-Use Pathway
Whispering Pines 4 -
Whispering Pines IR#4 Watermain Extension
Whispering Pines IR#4 -
Shoreline Revetment on Whispering Pines/Clinton Indian Band Reserve Lands
Whispering Pines/Clinton Indian Band Reserve #4 -
Whispering Pines/Clinton Indian Band Living Revetment Site 2B
Whispering Pines/Clinton Indian Band Living Revetment Site 2B -
Westsyde Road Multi-Use Pathway: Phase 2
Westsyde Road Multi-Use Pathway: Phase 2 -
New Fibre Installation
Project Site 10: Kamloops 4 -
New Fibre Installation
Project Site 06: Louis Creek 4 -
Summerland Irrigation Infrastructure Rehabilitation
Summerland -
Summerland Chemical Storage Building Project
Summerland -
Field Covering System and Cherry Orchard
Summerland Research and Development Centre -
Agriculture and Agri-Food Canada Building Demolition at Summerland
Summerland -
Parking Lot repave
301 3rd Street West, Revelstoke -
Penticton IR1 - Bell Media Tower Replacement Project
Penticton IR 1 - Mount Nkwala -
Snowforest Campground Upgrades
Mount Revelstoke National Park of Canada -
Simpcw: Chinook Cove Water System Upgrades and Extension
Simpcw First Nation North Thompson IR1 -
Penticton Indian Band Sage Road 24 Lot Subdivision
Penticton Indian Band 24 Lot Sage Road Subdivision Development -
Lower Nicola Indian Band Community Solar Gardens
Lower Nicola Reserve Lands - Nicola Mameet No. 1, Joeyaska No. 2, and Zoht No. 4 -
Outma Sqilx'W School Addition
Penticton Indian Band IR. No. 1 -
Timber harvesting on North Thompson 1
North Thompson IR #1 -
Dunn Lake Road Widening and Realignment Project
Simpcw First Nation -
New Fibre Installation
Project Site 08: North Thompson 1 -
Project Removed by Federal Authority - Penticton Airport - Lot 28 - Construction of 11 private hangars
Penticton -
Terminated - Penticton Airport - North Apron Expansion
Penticton -
Project Removed by Federal Authority - Penticton Airport - Lot 43 - Canadian Helicopters Ltd - Lease Expansion to Construct New Aircraft Storage Hangar
Penticton -
Terminated - Penticton Airport Parking Lot Rehabilitation and Expansion
Penticton Airport -
Simpcw Community Centre - NEQWEYQWELSTEN SCHOOL
Simpcw First Nation, North Thompson 1 -
Septic Tank Replacement at Edgewood BC Post Office
211 Lakeshore Ave, Edgewood, BC, V0G1J0 -
Skeetchestn Pipeline Segment Replacement and Valve Site Installation
Site Location -
Mount Revelstoke Telemetry Tower
Mount Revelstoke National Park of Canada -
Skeetchestn Learning Garden Centre
Skeetchestn Indian Band -
Yellowhead Copper Project
150 kilometres northeast of Kamloops -
Deadman River Crossing 5 Permanent Erosion Mitigation Project
Skeetchestn Indian Reserve #0 -
New Fibre Installation
Nooaitch -
New Telus Communications Inc. Telecommunication Tower Project on Skeetchestn Reserve.
Telecommunication Tower Project on Skeetchestn Reserve -
Telus Communications Tower - Skeetchestn First Nation
Skeetchestn First Nation reserve land -
Vaseux Floodplain re-engagement at Vaseux-Bighorn National Wildlife Area
Vaseux-Bighorn National Wildlife Area -
FortisBC Pipeline Integrity Dig at Vaseux-Bighorn National Wildlife Area
Vaseux-Bighorn National Wildlife Area -
Pole Removal at NRC Dominion Radio Astrophysical Observatory
Dominion Radio Astrophysical Observatory, British Columbia -
New Fibre Installation
Coldwater -
Kingsvale-Oliver Natural Gas Pipeline Reinforcement Project
Kingsvale -
Boardwalk Replacement Project - Vaseux Bighorn National Wildlife Area
Vaseux-Bighorn National Wildlife Area -
Harper Creek Mine Project
Vavenby -
Shackan - Sand and Gravel operation on Shackan IR11
Shackan 11 -
Underground Conduit Upgrade at NRC Dominion Radio Astrophysical Observatory
Dominion Radio Astrophysical Observatory -
Canadian Hydrogen Observatory and Radio-transient Detector (Dominion Radio Astrophysical Observatory)
Dominion Radio Astrophysical Observatory -
Well and Septic Installation Project at NRC Dominion Radio Astrophysical Observatory
Dominion Radio Astrophysical Observatory -
Fuel tank removal at the NRC Dominion Radio Astrophysical Observatory
Dominion Radio Astrophysical Observatory -
Princeton Detachment Replacement
Princeton -
Kingsvale-Oliver Natural Gas Pipeline Reinforcement Project
Oliver -
Cook's Ferry Indian Band, BC
Cook's Ferry Indian Band, BC -
Ashcroft Indian Band - Community Centre
Ashcroft Indian Band - Community Centre -
Upper Similkameen Indian Band - Water System Upgrades
Chuchuwayha I.R. No. 2 -
Sackum Creek Overhead Bridge Replacement
Sackum IR No. 3 and Gulada IR No. 3A -
Nzen'man' Bird's Nest Project
Nzen'man' Bird's Nest Project -
Lower Similkameen Indian Band - Deflection Berms Project
Lower Similkameen Indian Band - Deflection Berms Project -
Ruddock Creek Mine Project
Avola -
Orchard/Vineyard Lease - Lot 42, Similkameen IR#2
Lot 42, Similkameen IR#2 -
Osoyoos Indian Band - Rendezvous Beach Resort
Osoyoos Indian Band - Rendezvous Beach Resort -
Proposed Vineyard at Osoyoos IR1
Osoyoos IR1 -
Lower Similkameen Indian Band - Flood Mitigation Project
Chopaka 7 & 8 Indian Reserve -
Osoyoos Indian Band - Wolf Creek Affordable Housing Project
Osoyoos Indian Band - Wolf Creek Affordable Housing Project -
New Rogers Communications Inc. Telecommunication Tower Project in Glacier National Park along Highway 1
New Rogers Communications Inc. Telecommunication Tower Project in Glacier National Park along Highway 1 -
Lytton First Nation - Nuuautin IR2B Subdivision & Stein Water System Improvement Project
Lytton First Nation - Nuuautin IR2B Subdivision & Stein Water System Improvement Project -
Electric Vehicle Charging Station Installation at Osoyoos Border Crossing
Osoyoos Border Crossing -
Hazard Spruce Tree Removal
Glacier National Park -
Skuppah Indian Band - Food Security Centre
Inklyuhkinatko no 2 reserve -
Timber harvesting on Boothroyld IR 2- 5- 5A- 5C- 5D- 6- 6A, Chaumox 11, Speyum 3
Boothroyd BC -
Skuppah Indian Band - Food Security and Cultural Garden
Inklyuhkinatko Reserve No. 2 -
Lytton First Nation - Battlefield Housing and Food Hub
Lytton First Nation, Lytton, BC -
Speyum Creek Watercourse Restoration
Speyum Creek -
Lytton First Nation - Stein Water System Intake Improvements Project
Lytton First Nation - Stein Water System Intake Improvements Project -
Rogers Communications Inc. Telecommunication Tower Project in Glacier National Park along Highway 1
Rogers Communications Inc. Telecommunication Tower Project in Glacier National Park along Highway 1 -
Spuzzum First Nation Drinking Water Access Road
Spuzzum Access Road -
New Fibre Installation - TELUS
Project Site 01: Lillooet Corridor -
Xaxli'p First Nation Green Hydrogen Production Facility
Xaxli'p Fountain IR1B, Lillooet, BC -
McCartney's Flat IR#4 Water System Improvements
T'IT'Q'ET McCartney's Flat IR#4 -
Yale First Nation Recreation Centre
Stulkawhits No. 8 Reserve Land -
Cayoose Creek Water System Connection to Village of Lillooet
Cayoose Creek IR 1 -
DWS Cayoose Creek IR #1 interconnection with DOL
Seton River near Lillooet -
Maintenance Dredging - Lhoist North America of Canada Inc.
Maintenance Dredging - Lhoist North America of Canada Inc. -
Record Ridge Mine Project
7 kilometres southwest of Rossland -
Marine yard development
Marine yard development -
Chawathil - Schkam IR#2 Sewer System Improvements
Chawathil, Schkam IR#2 -
Paterson Port of Entry Redevelopment
Paterson Port of Entry -
New Dock Installation - 317 Sasamat Lane
New Dock Installation - 317 Sasamat Lane