Affordable Housing Units
Adams Lake Indian Band is proposing to build a 28-unit apartment building. The mid-rise apartment building will be six (6) storey high. The construction will include the building and parking areas. Project activities include the clearing and grubbing, installation of access driveway/parking, construction of foundations, backfill and grading, utilities and services including sewer and water piping as well as power and communication lines.
Latest update
05-08-2023 – The public comment period on the project is closed. Canada Mortgage and Housing Corporation is considering comments received to help inform its determination on whether the carrying out of the project is likely to cause significant adverse environmental effects.
Participate
Key documents
| Document number | Document title | File | Date |
|---|---|---|---|
| 2 | Affordable Housing Units | - | May 11, 2023 |
Contacts
Adrian SecuCanada Mortgage and Housing Corporation
Adrian Secu, Principal Technical Services
700 Montreal Road
Ottawa, Ontario K1A 0P7
Telephone: 1-800-668-2642
Email: iaa-lei@cmhc-schl.gc.ca
Disclaimer
This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.
-
Location
- Adams Lake Indian Band (British Columbia)
-
Nature of activity
- Building and Property Development
-
Assessment status
Completed -
Start date
2023-04-06 -
Proponent
Adams Lake Indian Band -
Authorities
- Canada Mortgage and Housing Corporation
-
Assessment type
Project on federal lands -
Reference number
84496
Nearby assessments
...within 200 kilometres-
New Fibre Installation
Project Site 6: SWITSEMALPH -
BC Ministry of Transportation and Infrastructure Highway 1 Four-Laning
North Bay IR 5 -
Shuswap North Okanagan Rail Trail
Splatsin First Nation -
TELUS Communications Inc.'s New Antenna Proposal for Existing Tower on Mount Wallensteen.
TELUS Communications Inc.'s New Antenna Proposal for Existing Tower on Mount Wallensteen -
New Fibre Installation
Project site 1: Enderby 2 -
Timber harvesting on Salmon River 1
Salmon River 1 -
New Fibre Installation
Project Site 5: ENDERBY 2 -
Splatsin Shihiya K4-G7 Elementary School
Splatsin Enderby IR #2 -
New Fibre Installation
Project Site 3: MEADOW CREEK 3 -
New Fibre Installation
Project Site 4: SALMON RIVER 1 -
New Fibre Installation
Project site 2: Salmon River -
New Fibre Installation
Project Site 2: OKANAGAN 1 -
Timber harvesting on CHUM CREEK 2 07179 & SCOTCH CREEK 4 07181
SCOTCH CREEK 4 07181 -
Timber harvesting on CHUM CREEK 2 07179 & SCOTCH CREEK 4 07181
CHUM CREEK 2 07179 -
Okanagan Indian Band 1 - Fortis BC Natural gas pipeline replacement project
Okanagan Indian Band, Salmon River -
Harvesting of damaged timber by the 2023 forest fire on Quaaout 1
Quaaout 1 -
OKIB Round Lake/Madeline Lake/Heart Lake/Salmon River Water System Improvements
Head of the Lake, Vernon BC -
New Fibre Installation
Okanagan -
Forest Fuel Management Quaaout #1
Quaaout #1 -
Adams Lake-Sahhltkum IR#4 Water Treatment and Reservoir
07155 - SAHHALTKUM 4 -
New Fibre Installation
Project Site 1: NISKONLITH 1 -
Timber harvesting on Hustalen IR #1 Adams Lake
Hustalen #1 -
Okanagan Indian Band Gravel Pit Reactivation
Okanagan IR No. 1 -
Head of the Lake Subdivision
Vernon -
Irish Creek/Head of the Lake Water System Upgrades
Okanagan Indian Band IR1 -
New School - Okanagan IR#1 Elementary School
Okanagan Indian Band -
OKIB IR1 Lot 27 & 28 - Gas Station and Convenience Store
OKIB IR1 Lot 27 & 28 -
Timixw Mixed Use Development
Vernon, BC -
Construct Buildings and Washrack at Vernon Military Camp
Vernon Military Camp, 3100 15th Ave, Vernon -
Main Camp Utilities Upgrade at Vernon Military Camp
Vernon Military Camp -
Pump Station Demolition - 3rd Canadian Division Support Group (CDSG), Detachment British Columbia Mainland - Chilliwack
Detachment British Columbia Mainland - Chilliwack -
Pump Station Demolition- 3rd Canadian Division Support Group (CDSG), Detachment British Columbia Mainland - Chilliwack
3rd Canadian Division Support Group (CDSG), Detachment British Columbia Mainland - Chilliwack -
Fence and Obstacle Course - Vernon Military Camp
Vernon Military Camp -
TELUS Cell Tower Cable Upgrade
1100 Mission Rd, Vernon -
Norah's Pond Expansion
Allan Brooks Nature Centre, Vernon, BC -
Automated Weather Station at 250 Allan Brooks Way, Vernon, BC
250 Allan Brooks Way, Vernon -
Vernon Rifle Range Geotechnical Investigation
Vernon Rifle Range -
Tk'emlúps te Secwépemc - East Shuswap Road: Watermain and Reservoir
Harper Ranch Pinantan Road -
TteS Road Realignment and Roundabout Project
Kamloops Indian Reserve No. 1 -
Tk'emlúps te Secwepemc CLC Stormwater Detention Facility
Kamloops 1 -
New Fibre Installation
TteS West Tkemlups -
Tk'emlups Commercial Complex Lot 164
Tk'emlúps te Secwépemc 07173 - KAMLOOPS 1 -
Construction of a building on Kamloops Indian Reserve No. 1, City of Kamloops
Kamloops Indian Reserve No.1, city of Kamloops -
Tk'emlúps te Secwépemc Stswékstem Engineered Waste Management Facility
Tk'emlúps te Secwépemc, Kamloops #1 -
Ajax Mine Project
Kamloops -
Tk?emlúps te Secwépemc - Mount Paul Multi-family Residential Development
Kamloops IR1, BC -
New Fibre Installation
Project Site 02: Whispering Pines 4 -
T'kemlúps te Secwépemc - Kamloops IR1, Lot 8-1 and 9, Commercial Lease
Kamloops -
Construction of a new building in Kamloops, British Columbia
324 Mt. Paul Way, Kamloops, British Columbia -
Westsyde Road Multi-Use Pathway
Whispering Pines 4 -
North Thompson Rail Terminal Development Project
Kamloops -
Whispering Pines IR#4 Watermain Extension
Whispering Pines IR#4 -
Shoreline Revetment on Whispering Pines/Clinton Indian Band Reserve Lands
Whispering Pines/Clinton Indian Band Reserve #4 -
Whispering Pines/Clinton Indian Band Living Revetment Site 2B
Whispering Pines/Clinton Indian Band Living Revetment Site 2B -
Westsyde Road Multi-Use Pathway: Phase 2
Westsyde Road Multi-Use Pathway: Phase 2 -
New Fibre Installation
Project Site 06: Louis Creek 4 -
New Fibre Installation
Project Site 10: Kamloops 4 -
Okanagan Indian Band Business Park Phase 1
Lots 1, 1-2, 1-3, and 14, Duck Lake IR7 -
OKIB Business Park, Phase 2
OKIB Business Park, Phase 2 -
Runway End Safety Area - Kelowna International Airport
Kelowna International Airport -
Combined Operations Building - Kelowna International Airport
Kelowna International Airport -
Parking Lot repave
301 3rd Street West, Revelstoke -
Snowforest Campground Upgrades
Mount Revelstoke National Park of Canada -
Simpcw: Chinook Cove Water System Upgrades and Extension
Simpcw First Nation North Thompson IR1 -
Timber harvesting on North Thompson 1
North Thompson IR #1 -
Dunn Lake Road Widening and Realignment Project
Simpcw First Nation -
New Fibre Installation
Project Site 08: North Thompson 1 -
Simpcw Community Centre - NEQWEYQWELSTEN SCHOOL
Simpcw First Nation, North Thompson 1 -
Douglas Lake Ranch Transmission 3 - Phase Line Relocation
Douglas Lake IR 3 -
Yellowhead Copper Project
150 kilometres northeast of Kamloops -
Upper Nicola Band/Okanagan Nation Alliance Solar Farm Project
NICOLA LAKE 1 -
Upper Nicola Band - Quilchena Community Centre
Upper Nicola Band - Quilchena Community Centre -
Upper Nicola Band - Nicola River Road and Michel Road Drainage Upgrades
Upper Nicola -
Mount Revelstoke Telemetry Tower
Mount Revelstoke National Park of Canada -
Harper Creek Mine Project
Vavenby -
Skeetchestn Pipeline Segment Replacement and Valve Site Installation
Site Location -
Skeetchestn Learning Garden Centre
Skeetchestn Indian Band -
Deadman River Crossing 5 Permanent Erosion Mitigation Project
Skeetchestn Indian Reserve #0 -
New Telus Communications Inc. Telecommunication Tower Project on Skeetchestn Reserve.
Telecommunication Tower Project on Skeetchestn Reserve -
Telus Communications Tower - Skeetchestn First Nation
Skeetchestn First Nation reserve land -
Ruddock Creek Mine Project
Avola -
Lower Nicola Indian Band Community Solar Gardens
Lower Nicola Reserve Lands - Nicola Mameet No. 1, Joeyaska No. 2, and Zoht No. 4 -
Summerland Irrigation Infrastructure Rehabilitation
Summerland -
Summerland Chemical Storage Building Project
Summerland -
On-Farm Composting System, Pilot Project
Summerland Research and Development Centre -
Field Covering System and Cherry Orchard
Summerland Research and Development Centre -
Agriculture and Agri-Food Canada Building Demolition at Summerland
Summerland -
Septic Tank Replacement at Edgewood BC Post Office
211 Lakeshore Ave, Edgewood, BC, V0G1J0 -
Penticton IR1 - Bell Media Tower Replacement Project
Penticton IR 1 - Mount Nkwala -
Penticton Indian Band Sage Road 24 Lot Subdivision
Penticton Indian Band 24 Lot Sage Road Subdivision Development -
Outma Sqilx'W School Addition
Penticton Indian Band IR. No. 1 -
New Fibre Installation
Nooaitch -
Project Removed by Federal Authority - Penticton Airport - Lot 28 - Construction of 11 private hangars
Penticton -
Terminated - Penticton Airport - North Apron Expansion
Penticton -
Project Removed by Federal Authority - Penticton Airport - Lot 43 - Canadian Helicopters Ltd - Lease Expansion to Construct New Aircraft Storage Hangar
Penticton -
New Rogers Communications Inc. Telecommunication Tower Project in Glacier National Park along Highway 1
New Rogers Communications Inc. Telecommunication Tower Project in Glacier National Park along Highway 1 -
Terminated - Penticton Airport Parking Lot Rehabilitation and Expansion
Penticton Airport -
Hazard Spruce Tree Removal
Glacier National Park -
Shackan - Sand and Gravel operation on Shackan IR11
Shackan 11 -
New Fibre Installation
Coldwater -
Ashcroft Indian Band - Community Centre
Ashcroft Indian Band - Community Centre -
Kingsvale-Oliver Natural Gas Pipeline Reinforcement Project
Kingsvale -
Cook's Ferry Indian Band, BC
Cook's Ferry Indian Band, BC -
Rogers Communications Inc. Telecommunication Tower Project in Glacier National Park along Highway 1
Rogers Communications Inc. Telecommunication Tower Project in Glacier National Park along Highway 1 -
FortisBC Pipeline Integrity Dig at Vaseux-Bighorn National Wildlife Area
Vaseux-Bighorn National Wildlife Area -
Vaseux Floodplain re-engagement at Vaseux-Bighorn National Wildlife Area
Vaseux-Bighorn National Wildlife Area -
Pole Removal at NRC Dominion Radio Astrophysical Observatory
Dominion Radio Astrophysical Observatory, British Columbia -
Sackum Creek Overhead Bridge Replacement
Sackum IR No. 3 and Gulada IR No. 3A -
Boardwalk Replacement Project - Vaseux Bighorn National Wildlife Area
Vaseux-Bighorn National Wildlife Area -
Nzen'man' Bird's Nest Project
Nzen'man' Bird's Nest Project -
Princeton Detachment Replacement
Princeton -
Canadian Hydrogen Observatory and Radio-transient Detector (Dominion Radio Astrophysical Observatory)
Dominion Radio Astrophysical Observatory -
Underground Conduit Upgrade at NRC Dominion Radio Astrophysical Observatory
Dominion Radio Astrophysical Observatory -
Well and Septic Installation Project at NRC Dominion Radio Astrophysical Observatory
Dominion Radio Astrophysical Observatory -
Fuel tank removal at the NRC Dominion Radio Astrophysical Observatory
Dominion Radio Astrophysical Observatory -
Lytton First Nation - Nuuautin IR2B Subdivision & Stein Water System Improvement Project
Lytton First Nation - Nuuautin IR2B Subdivision & Stein Water System Improvement Project -
Kingsvale-Oliver Natural Gas Pipeline Reinforcement Project
Oliver -
Lytton First Nation - Battlefield Housing and Food Hub
Lytton First Nation, Lytton, BC -
Skuppah Indian Band - Food Security Centre
Inklyuhkinatko no 2 reserve -
Skuppah Indian Band - Food Security and Cultural Garden
Inklyuhkinatko Reserve No. 2 -
Lytton First Nation - Stein Water System Intake Improvements Project
Lytton First Nation - Stein Water System Intake Improvements Project -
Upper Similkameen Indian Band - Water System Upgrades
Chuchuwayha I.R. No. 2 -
Timber harvesting on Boothroyld IR 2- 5- 5A- 5C- 5D- 6- 6A, Chaumox 11, Speyum 3
Boothroyd BC -
Speyum Creek Watercourse Restoration
Speyum Creek -
Lower Similkameen Indian Band - Deflection Berms Project
Lower Similkameen Indian Band - Deflection Berms Project -
New Fibre Installation - TELUS
Project Site 01: Lillooet Corridor -
Orchard/Vineyard Lease - Lot 42, Similkameen IR#2
Lot 42, Similkameen IR#2 -
Osoyoos Indian Band - Rendezvous Beach Resort
Osoyoos Indian Band - Rendezvous Beach Resort -
Proposed Vineyard at Osoyoos IR1
Osoyoos IR1 -
Xaxli'p First Nation Green Hydrogen Production Facility
Xaxli'p Fountain IR1B, Lillooet, BC -
McCartney's Flat IR#4 Water System Improvements
T'IT'Q'ET McCartney's Flat IR#4 -
Lower Similkameen Indian Band - Flood Mitigation Project
Chopaka 7 & 8 Indian Reserve -
Osoyoos Indian Band - Wolf Creek Affordable Housing Project
Osoyoos Indian Band - Wolf Creek Affordable Housing Project -
Cayoose Creek Water System Connection to Village of Lillooet
Cayoose Creek IR 1 -
DWS Cayoose Creek IR #1 interconnection with DOL
Seton River near Lillooet -
Electric Vehicle Charging Station Installation at Osoyoos Border Crossing
Osoyoos Border Crossing -
Spuzzum First Nation Drinking Water Access Road
Spuzzum Access Road