Dunn Lake Road Widening and Realignment Project
The Proposed Project
The Ministry of Transportation and Infrastructure (MOTI) is seeking a s.28(2) permit from Indigenous Services Canada to widen, realign, and pave approximately 10km of Dunn Lake Road passing through the Simpcw First Nation north of Barrier, BC. Simpcw First Nation is in support of this improvement project.
The affected area on Simpcw First Nation land covers approximately 20.6 ha and has previously been cleared. The reconstruction of Dunn Lake Road to two lane paved surface will involve most common aspects of highway construction, including grading, milling and paving, and improvements to roadway drainage. Other works include grubbing & clearing; removal of contaminated soils; controlled excavation of archeological materials; relocation and tie-ins to civil water system in the community of Chu Chua; relocation of power, telephone, and fiber optic infrastructure; environmental offsetting; replacement and upgrades of drainage structures in Newhykulston and Skowootum Creeks as well as channelization work immediately above and below; and decommissioning and restoration of abandoned road surfaces.
Disclaimer
This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.
Latest update
Contacts
Lands and Economic DevelopmentNicole Louiseize, Environmental Specialist
, British Columbia
Telephone: 778-227-6741
Email: nicole.louiseize@canada.ca
-
Location
- Simpcw First Nation (British Columbia)
-
Nature of Activity
- Highways and Roads
-
Assessment Status
In progress -
Start Date
2021-07-16 -
Proponent
Ministry of Transportation and Infrastructure (MOTI) -
Authorities
- Indigenous Services Canada
-
Assessment Type
Project on federal lands -
Reference Number
82795
Nearby assessments
..within 200 kilometres-
Simpcw Community Centre - NEQWEYQWELSTEN SCHOOL
Simpcw First Nation, North Thompson 1 -
Whispering Pines IR#4 Watermain Extension
Whispering Pines IR#4 -
Harper Creek Mine Project
Vavenby -
Forest Fuel Management Quaaout #1
Quaaout #1 -
Tk'emlúps te Secwépemc Stswékstem Engineered Waste Management Facility
Tk'emlúps te Secwépemc, Kamloops #1 -
North Thompson Rail Terminal Development Project
Kamloops -
TteS Road Realignment and Roundabout Project
Kamloops Indian Reserve No. 1 -
New Fibre Installation
TteS West Tkemlups -
Construction of a new building in Kamloops, British Columbia
324 Mt. Paul Way, Kamloops, British Columbia -
Harper Creek Mine Project
Kamloops -
Skeetchestn Learning Garden Centre
Skeetchestn Indian Band -
BC Ministry of Transportation and Infrastructure Highway 1 Four-Laning
North Bay IR 5 -
Ruddock Creek Mine Project
Avola -
Okanagan Indian Band 1 - Fortis BC Natural gas pipeline replacement project
Okanagan Indian Band, Salmon River -
New Fibre Installation
Okanagan -
Okanagan Indian Band Gravel Pit Reactivation
Okanagan IR No. 1 -
Irish Creek/Head of the Lake Water System Upgrades
Okanagan Indian Band IR1 -
New School - Okanagan IR#1 Elementary School
Okanagan Indian Band -
TELUS Cell Tower Cable Upgrade
1100 Mission Rd, Vernon -
Construct Buildings and Washrack at Vernon Military Camp
Vernon Military Camp, 3100 15th Ave, Vernon -
Pump Station Demolition - 3rd Canadian Division Support Group (CDSG), Detachment British Columbia Mainland - Chilliwack
Detachment British Columbia Mainland - Chilliwack -
Vernon Rifle Range Geotechnical Investigation
Vernon Rifle Range -
New Fibre Installation
Canoe Creek IR#2 -
Lower Nicola Indian Band Community Solar Gardens
Lower Nicola Reserve Lands - Nicola Mameet No. 1, Joeyaska No. 2, and Zoht No. 4 -
Parking Lot repave
301 3rd Street West, Revelstoke -
New Fibre Installation
Nooaitch -
DWS Cayoose Creek IR #1 interconnection with DOL
Seton River near Lillooet -
Timber Harvesting on Pete Suckers IR 13
Pete Suckers IR 13 -
Okanagan Indian Band Business Park Phase 1
Lots 1, 1-2, 1-3, and 14, Duck Lake IR7 -
OKIB Business Park, Phase 2
OKIB Business Park, Phase 2 -
New Fibre Installation
Coldwater -
Williams Lake First Nation Community Playground Project
Williams Lake First Nation Community Playground Project -
Combined Operations Building - Kelowna International Airport
Kelowna International Airport -
Runway End Safety Area - Kelowna International Airport
Kelowna International Airport -
New Fibre Installation
James Louie 3A Reserve (Williams Lake First Nation) -
Kingsvale-Oliver Reinforcement Project
Kingsvale -
Spanish Mountain Gold Project
70 kilometres northeast of Williams Lake -
Spanish Mountain Gold Mine Project
70 kilometres northeast of Williams Lake -
Construction of a Cattle Exclusion Snake Fence - 3rd Canadian Division Support Base
3rd Canadian Division Support Base -
Speyum Creek Watercourse Restoration
Speyum Creek -
AIB reservoir Construction
Ashcroft -
N'Quatqua Multi-Use Facility Project
N'Quatqua Multi-Use Facility Project -
N'Quatqua Watermain Extension and Phase 1 Subdivision
N'Quatqua IR#1 -
Hazard Spruce Tree Removal
Glacier National Park -
Management of the Douglas-Fir Beetle (Dendroctonus pseudotsugae) Timber Harvest
Lot 7741 -
Management of the Douglas-Fir Beetle (Dendroctonus pseudotsugae) Timber Harvest Lot 7741
Management of the Douglas-Fir Beetle (Dendroctonus pseudotsugae) Timber Harvest Lot 7741 -
Summerland Irrigation Infrastructure Rehabilitation
Summerland -
Agriculture and Agri-Food Canada Building Demolition at Summerland
Summerland -
Penticton IR1 - Bell Media Tower Replacement Project
Penticton IR 1 - Mount Nkwala