Suncor Base Mine Extension Project
Suncor Energy Inc. is proposing to develop the Base Mine Extension Project to sustain the supply of bitumen to the existing upgraders at Suncor's Oil Sands Base Plant operation (Base Plant). The project includes an open-pit mining operation and associated infrastructure to supply bitumen to new froth production facilities and various other production facilities at the existing Base Plant. The project is located adjacent to existing Base Plant operations approximately three kilometres north of Fort McMurray, Alberta, within the Regional Municipality of Wood Buffalo. Project construction is expected to start in 2026 and its footprint is anticipated to be approximately 30 000 hectares.
Latest update
April 6, 2022 – The Impact Assessment Agency of Canada has extended the time limit for the proponent to provide the required information or studies for the impact assessment of the project.
May 31, 2021 – The Impact Assessment Agency of Canada has commenced an impact assessment for the Suncor Base Mine Extension Project and has issued the Tailored Impact Statement Guidelines and required plans for the preparation of the Impact Statement.
At a glance
Planning
Planning
Key documents
- Permitting Plan May 31, 2021
- Cooperation Plan May 31, 2021
- Indigenous Engagement and Partnership Plan (Updated: January 5, 2022) May 31, 2021
- Public Participation Plan May 31, 2021
- Tailored Impact Statement Guidelines May 31, 2021
- Notice of Referral to Review Panel January 28, 2021
- Summary of the Detailed Project Description of a Designated Project July 23, 2020
- Detailed Project Description of a Designated Project and Responses to Summary of Issues July 23, 2020
- Summary of Issues May 11, 2020
- Initial Project Description (updated) March 2, 2020
- Summary of an Initial Project Description (updated) March 2, 2020
Comment periods
- Public Notice - Suncor Base Mine Extension Project - Comment Period on the Draft Tailored Impact Statement Guidelines and Draft Public Participation Plan February 26, 2021 to May 7, 2021 - Closed
- Public Notice - Public Comments Invited on a Summary of the Initial Project Description March 2, 2020 to May 1, 2020 - Closed
Impact Statement
Time limit extension
The time limit for the assessment has been extended to February 25, 2025 as requested by the proponent and granted by the Agency.
Impact Statement
Key documents
- Notice of Commencement of an Impact Assessment May 31, 2021
Decision Making
Date of decision
Anticipated on December 28, 2026
Decision Making
Post Decision
Post Decision phase is an ongoing process
Post Decision
Participate
Contacts
Suncor Base Mine Extension ProjectImpact Assessment Agency of Canada
160 Elgin St, 22nd Floor
Ottawa, Ontario K1A 0H3
Telephone: 343-549-5813
Email: basemine-minebase@iaac-aeic.gc.ca
-
Location
- 3 kilometres north of Fort McMurray (Alberta)
-
Nature of Activity
- Oil and Gas
-
Assessment Status
In progress -
Start Date
2020-03-02 -
Proponent
Suncor Energy Inc. -
Authorities
- Impact Assessment Agency of Canada
-
Assessment Type
Impact assessment by Review Panel -
Reference Number
80521
Disclaimer
This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.
Nearby assessments
...within 200 kilometres-
Suncor Energy Coke Fired Boiler Replacement Project
25 kilometres north of Fort McMurray -
Clearwater Multi-User Access Project, Alberta
Clearwater River -
2017 NGTL System Expansion Project
Fort McMurray -
New Fibre Installation
Project site 1: Regional Municipality of Wood Buffalo -
Fort McKay First Nation: 2023/24 Residential Redevelopment Project
Fort McKay First Nation -
Fort McKay First Nation K-9 School
Fort McKay First Nation -
Fort McMurray First Nation: Gregoire Lake Water and Sewage Project
Gregoire Lake -
New Fibre Installation
Project site 2: Regional Municipality of Wood Buffalo -
ATCO Gas and Pipelines Ltd.: 1088748 Gregoire Lake IR No. 176A Lakeshore Drive Gas Distribution System Extension
Fort McMurray First Nation -
Jackpine Mine Expansion Project
Fort McKay -
New Fibre Installation
Project site 3: Regional Municipality of Wood Buffalo -
Fort McMurray First Nation Water and Wastewater Infrastructure
Fort McMurray First Nation -
Pierre River Mine Project
Fort McKay -
Frontier Oil Sands Mine Project
Fort McKay -
Sundog Renewable Generating Station Project
130 kilometres upstream of Fort McMurray -
Janvier Secondary Egress Road
Chipewyan Prairie First Nation -
Chipewyan Prairie First Nation Housing Project 2020-21 (5 Units)
Chipewyan Prairie First Nation -
ATCO Gas and Pipelines: 1091764 North Janvier Natural Gas Delivery Pipeline Upgrade Project
Chipewyan Prairie First Nation -
New Fibre Installation
Project site 4: Regional Municipality of Wood Buffalo -
Chipewyan Prairie First Nation 2021 Subdivision Project (Phase 1)
Chipewyan Prairie First Nation -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
CLEARWATER RIVER DENE BAND NO. 222 (Tower 1) -
Clearwater River Dene Subdivision
Clearwater River Dene IR 122 -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
CLEARWATER RIVER DENE BAND NO. 222 (Tower 2) -
Pelican Renewable Generating Station Project
180 kilometres upstream of Fort McMurray -
Patterson Lake South Mine Project
Patterson Lake -
New Fibre Installation
Project Site 5 - Wabasca No. 166: -
ATCO Gas and Pipelines Ltd.: 1098480 Wabasca IR No. 166 Phase 2 Alfred Road Gas Main & Distribution System
Bigstone Cree Nation -
Big Bear Camp Aerodrome Project
Grygar Lake -
New Fibre Installation
Project Site 3 - Wabasca No. 166C: -
Wabasca Water Treatment Plant Upgrades Project
Wabasca -
ATCO Gas and Pipelines Ltd.: 1088866 Bigstone Cree Nation & Hamlet of Sandy Lake Gas Feeder and Mains at Wabasca IR No. 166
Bigstone Cree Nation -
Rook I Project
Patterson Lake -
Chipewyan Prairie First Nation Wastewater Treatment Plant Expansion
Chipewyan Prairie First Nation -
ATCO Gas and Pipelines Ltd.: 1088866 Wabasca IR No. 166A Gas Distribution Extension
Bigstone Cree Nation Wabasca IR No. 166A -
Bigstone Cree Nation Oilfield Supply Store
Wabasca #166 -
Bigstone Cree Nation Education Authority: CU254 Oksi Pasikoniwew Kakik School Secondary Access Road Project
Bigstone Cree Nation -
Bigstone Cree Nation New High School
Bigstone Cree Nation -
Bigstone B.O.S.S Modular Construction and Fabrication Yard Expansion Project
Bigstone Cree Nation -
Bigstone Cree First Nation Flood Recovery Program: Culvert 166A-10 TSAG ID No. 07 Replacement
Bigstone Cree Nation -
New Fibre Installation
Project Site 1 - Bigstone Cree Nation: -
Bigstone Cree First Nation Flood Recovery Program: Culvert 166A-17 TSAG ID No. 03 Replacement
Bigstone Cree Nation -
Bigstone Cree First Nation Flood Recovery Program: Culvert 166A-18 TSAG ID No. 04 Replacement
Bigstone Cree Nation -
Bigstone Cree Nation High School Waterline Project
Wabasca -
Big Egg Lake Water Control Structure
Athabasca Chipewyan First Nation Jackfish Reserve (I.R. 201) -
New Fibre Installation
Project Site 2 - Wabasca No. 166B : -
New Fibre Installation
Project Site 4 - Wabasca No. 166D: -
OS-7241 Wabasca IR 166D | Authorization to Construct and Operate a Surface Lease for an access road and for a multiwell pad
Wabasca IR # 116D -
Bigstone Cree Nation Flood Recovery Program: Culvert 166D-27 Replacement
Bigstone Cree Nation -
Bigstone Cree First Nation Flood Recovery Program: Culvert 166D-08 TSAG ID No. 08 Replacement
Bigstone Cree Nation -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
TURNOR LAKE I.R. 193B (Tower 2) -
Rogers Communications Inc., new radiocommunications tower (W6225) on Peerless Trout First Nation land, near Peerless Lake, AB.
W6225 - Peerless Trout First Nation Land (near Peerless Lake) -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
TURNOR LAKE I.R. 193B (Tower 1) -
Birch Narrows Dene Nation Community Centre
Birch Narrows Dene Nation -
North Corridor Expansion Project
Peerless Lake -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
TURNOR LAKE I.R. 193B (Tower 3) -
Rogers Communications Inc., new radiocommunications tower (W6238) on Peerless Trout First Nation land, near Trout Lake, AB.
W6238 - Peerless Trout First Nation Land (near Trout Lake) -
Re-establish Former Water Level and Flow monitoring stations at four sites within the Peace Athabasca Delta of Wood Buffalo National Park
Wood Buffalo National Park -
Dog Camp Water Control Structure
Wood Buffalo National Park of Canada -
Re-establish Former Water Level and Flow monitoring stations at four sites within the Peace Athabasca Delta of Wood Buffalo National Park
Wood Buffalo National Park -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
BUFFALO RIVER DENE NATION I.R. 193 (Tower 1) -
Fixed Point-to-Point Link from Buffalo Narrows, SK to Dillon, SK
Buffalo River Dene Nation I.R. 193 -
Peace-Athabasca Delta Field Station
Detailed Impact Assessment, Wood Buffalo National Park -
Buffalo River Dene Nation Fire Hall
Peter Pond Lake Indian Reserve No. 193 -
Establish Water Survey of Canada river depth station on north branch of Quatre Fourches
Wood Buffalo National Park -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
BUFFALO RIVER DENE NATION I.R. 193 (Tower 2) -
Buffalo River Dene Nation Subdivision Stage 4
Buffalo River Dene Nation IR 193 -
Buffalo River Dene Nation Solid Waste Transfer Station
BUFFALO RIVER DENE NATION RESERVE #193