Suncor Base Mine Extension Project
Suncor Energy Inc. is proposing to develop the Base Mine Extension Project to sustain the supply of bitumen to the existing upgraders at Suncor's Oil Sands Base Plant operation (Base Plant). The project includes an open-pit mining operation and associated infrastructure to supply bitumen to new froth production facilities and various other production facilities at the existing Base Plant. The project is located adjacent to existing Base Plant operations approximately three kilometres north of Fort McMurray, Alberta, within the Regional Municipality of Wood Buffalo. Project construction is expected to start in 2026 and its footprint is anticipated to be approximately 30 000 hectares.
Disclaimer
This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.
Latest update
April 6, 2022 – The Impact Assessment Agency of Canada has extended the time limit for the proponent to provide the required information or studies for the impact assessment of the project.
May 31, 2021 – The Impact Assessment Agency of Canada has commenced an impact assessment for the Suncor Base Mine Extension Project and has issued the Tailored Impact Statement Guidelines and required plans for the preparation of the Impact Statement.
Participate
Key documents
Contacts
Suncor Base Mine Extension ProjectImpact Assessment Agency of Canada
160 Elgin St, 22nd Floor
Ottawa, Ontario K1A 0H3
Telephone: 343-549-5813
Email: basemine-minebase@iaac-aeic.gc.ca
-
Location
- 3 kilometres north of Fort McMurray (Alberta)
-
Nature of Activity
- Oil and Gas
-
Assessment Status
In progress -
Start Date
2020-03-02 -
Proponent
Suncor Energy Inc. -
Authorities
- Impact Assessment Agency of Canada
-
Assessment Type
Impact assessment by Review Panel -
Reference Number
80521
Nearby assessments
...within 200 kilometres-
Suncor Energy Coke Fired Boiler Replacement Project
25 kilometres north of Fort McMurray -
Clearwater Multi-User Access Project, Alberta
Clearwater River -
2017 NGTL System Expansion Project
Fort McMurray -
Fort McKay First Nation K-9 School
Fort McKay First Nation -
Fort McMurray First Nation: Gregoire Lake Water and Sewage Project
Gregoire Lake -
Jackpine Mine Expansion Project
Fort McKay -
Fort McMurray First Nation Water and Wastewater Infrastructure
Fort McMurray First Nation -
Pierre River Mine Project
Fort McKay -
Frontier Oil Sands Mine Project
Fort McKay -
Sundog Renewable Generating Station Project
130 kilometres upstream of Fort McMurray -
Chipewyan Prairie First Nation Janvier Secondary Egress Road
Chipewyan Prairie First Nation -
Chipewyan Prairie First Nation Housing Project 2020-21 (5 Units)
Chipewyan Prairie First Nation -
Chipewyan Prairie First Nation 2021 Subdivision Project (Phase 1)
Chipewyan Prairie First Nation -
Clearwater River Dene Subdivision
Clearwater River Dene IR 122 -
Pelican Renewable Generating Station Project
180 kilometres upstream of Fort McMurray -
Patterson Lake South Mine Project
Patterson Lake -
Wabasca Water Treatment Plant Upgrades Project
Wabasca -
Rook 1 Project
Patterson Lake -
Chipewyan Prairie First Nation Wastewater Treatment Plant Expansion
Chipewyan Prairie First Nation -
Bigstone Cree Nation Oilfield Supply Store
Wabasca #166 -
Bigstone Cree Nation New High School
Bigstone Cree Nation -
Bigstone B.O.S.S Modular Construction and Fabrication Yard Expansion Project
Bigstone Cree Nation -
Bigstone Cree First Nation Flood Recovery Program: Culvert 166A-10 TSAG ID No. 07 Replacement
Bigstone Cree Nation -
Bigstone Cree First Nation Flood Recovery Program: Culvert 166A-17 TSAG ID No. 03 Replacement
Bigstone Cree Nation -
Bigstone Cree First Nation Flood Recovery Program: Culvert 166A-18 TSAG ID No. 04 Replacement
Bigstone Cree Nation -
Bigstone Cree Nation High School Waterline Project
Wabasca -
OS-7241 Wabasca IR 166D | Authorization to Construct and Operate a Surface Lease for an access road and for a multiwell pad
Wabasca IR # 116D -
Bigstone Cree First Nation Flood Recovery Program: Culvert 166D-27 Replacement
Bigstone Cree Nation -
Bigstone Cree First Nation Flood Recovery Program: Culvert 166D-08 TSAG ID No. 08 Replacement
Bigstone Cree Nation -
North Corridor Expansion Project
Peerless Lake -
Re-establish Former Water Level and Flow monitoring stations at four sites within the Peace Athabasca Delta of Wood Buffalo National Park
Wood Buffalo National Park -
Re-establish Former Water Level and Flow monitoring stations at four sites within the Peace Athabasca Delta of Wood Buffalo National Park
Wood Buffalo National Park -
Peace-Athabasca Delta Field Station
Detailed Impact Assessment, Wood Buffalo National Park -
Establish Water Survey of Canada river depth station on north branch of Quatre Fourches
Wood Buffalo National Park -
Buffalo River Dene Nation Subdivision Stage 4
Buffalo River Dene Nation IR 193 -
Buffalo River Dene Nation Solid Waste Transfer Station
BUFFALO RIVER DENE NATION RESERVE #193