The Nepean Bridge Replacement Project

The Energy Services Modernization (ESM) project is a federal greening government project initiated under the Energy Services Acquisition Program (ESAP) to modernize the District Energy System, which provides heating services to over 80 buildings and cooling services to nearly 70 buildings in the National Capital Region. The ESM project is a demonstration of the Government of Canada leading by example in the context of climate change, by making its own operations greener and adopting technologies that significantly cut carbon pollution, improve energy efficiency, increase safety and reliability, and ensure a safer future for our children and generations to follow.

As part of the ESM project, an underground energy distribution system is required to connect the Tunney's Pasture and the Cliff Energy Centres through the installation of direct buried network of low-temperature hot water and an allowance for future chilled water pipes. This extensive ESM underground construction work has been in progress for over the past two years with construction completion in late Fall 2024. To complete the distribution system's interconnection work, piping from Tunney's Pasture and Cliff Energy Centres will require installation across the Nepean Bay.

Currently, the Nepean Bay pedestrian bridge does not have the structural capacity to service its current use and the weight of the new energy distribution pipes. To support the new energy distribution piping, a new Nepean Bay pedestrian bridge will be constructed at the same location as the current bridge, which connects the Ottawa River Multi-use Pathway between the LeBreton Pathway and Vimy Place. The new bridge will be five (5) meters wide and preassembled on shore prior to lifting into place over Nepean Bay. Clearances over the waterway will be maintained, and no in-water works construction activities are anticipated .

More


Latest update

January 21, 2024 – The public comment period on the project is closed. The authorities are considering comments received to help inform its determination on whether the carrying out of the project is likely to cause significant adverse environmental effects.

Participate

Key documents

Key documents
Document Number Document Title File Date
1 The Nepean Bridge Replacement Project - December 21, 2023

Contacts

Environment, Health and Safety
Public Services and Procurement Canada
11 Laurier Street
Portage III, Place du Portage
Gatineau, Quebec K1A 0S5
Email: TPSGC.RCNLVEEListedeControle-NCRECMPChecklist.PWGSC@tpsgc-pwgsc.gc.ca


  • Location

    • The Nepean Bridge Replacement Project (Ontario)
  • Nature of Activity

    • Bridges
  • Assessment Status

    In progress
  • Start Date

    2023-12-21
  • Proponent

    PSPC, NCC
  • Authorities

    • National Capital Commission
    • Public Services and Procurement Canada
  • Assessment Type

    Project on federal lands
  • Reference Number

    87183
Disclaimer

This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.

 