Storm Damage Repairs, Burnt Islands, NL

DFO, Small Craft Harbour intends to carry out repairs to the existing infrastructure which was damaged during a recent storm. The scope of work for this project involves repairs to infrastructure at two sites in Burnt Islands. Activities at site 1 will include removal of the existing concrete deck wharf to facilitate repair and construction work. A new timber crib wharf with concrete decking will be constructed in the same footprint but with a larger configuration extending the footprint slightly.

At site 2 the existing creosote timber cribs from an old cribwork wharf will be demolished to +0.50m L.N.T. The old footprint will then be encased in armourstone to construct a breakwater type structure.


Latest update

January 16, 2024 – The authorities issued its Notice of Determination and determined that the project is not likely to cause significant adverse environmental effects.

Participate

Key documents

Key documents
Document Number Document Title File Date
1 Notice of Determination - January 16, 2024

Contacts

Fisheries and Oceans Canada
Paul Curran, Regional Engineer
10 Barters Hill
St. John's, Newfoundland and Labrador A1C 5X1
Telephone: 709-772-6660
Email: paul.curran@dfo-mpo.gc.ca


  • Location

    • Burnt Islands, Newfoundland (Newfoundland and Labrador)
  • Nature of Activity

    • Ports and Harbours
  • Assessment Status

    Completed
  • Start Date

    2022-12-15
  • Proponent

    Fisheries and Oceans Canada- Small Craft Harbours (DFO-SCH)
  • Authorities

    • Fisheries and Oceans Canada
    • Transport Canada
  • Assessment Type

    Project on federal lands
  • Reference Number

    84175