Miawpukek First Nation Centre Culvert Replacement

The project is the replacement of a damaged culvert (CSP culvert, 28m length and 4000mm in diameter) located on Miawpukek Drive in Conne River. Miawpukek Drive serves as the major connector road of Conne River. The replacement aluminum culvert will be approximately 28m in length, 3990 mm in diameter. The physical works will include excavation, culvert removal, culvert replacement, filling road repaving, sidewalk replacement and guardrail replacement. The sizes of areas affected are approximately 115m2 for the road surface, 20m2 from the sidewalk surface, and 175 – 200m2 for the roadside slope.


Latest update

October 7, 2022 – Indigenous Services Canada issued its notice of determination and determined that the project is not likely to cause significant adverse environmental effects.

Participate

Key documents

Key documents
Document Number Document Title File Date
2 Notice of Determination - October 7, 2022
1 Notice of Intent to Make a Determination - Start of Public Comment Period - June 1, 2022

Contacts

Indigenous Services Canada - Atlantic
Indigenous Services Canada
PO BOX 160
40 Havelock Street
Amherst, Nova Scotia B4H 3Z3
Telephone: 1-800-567-9604
Fax: 902-661-6237
Email: aadnc.paeat-erpat.aandc@canada.ca


  • Location

    • Miawpukek First Nation (Newfoundland and Labrador)
  • Nature of Activity

    • Highways and Roads
    • Other, not otherwise specified
  • Assessment Status

    Completed
  • Start Date

    2022-06-01
  • Proponent

    Miawpukek First Nation
  • Authorities

    • Indigenous Services Canada
  • Assessment Type

    Project on federal lands
  • Reference Number

    83683