The Department of National Defence (DND) is proposing a project which will include modifications of the existing fuel tank product transfer area concrete pads for storage tank systems located at various buildings. Some of the existing fuel tanks will be replaced. More specifically, one existing diesel containing fuel tank with a capacity of 9,208 liters will be replaced with a new double wall vacuum monitored 9,100-liter fuel tank. Additionally, seven diesel fuel tanks with a capacity of 455 liters will be replaced with new double wall diesel fuel tanks having a capacity of 454 liters each. Decommissioned fuel storage tanks will be permanently removed and disposed.


Latest update

June 14, 2022 – The public comment period on the project is closed. The Department of National Defence is considering comments received to help inform its determination on whether the carrying out of the project is likely to cause significant adverse environmental effects.

Participate

Key documents

Key documents
Document Number Document Title File Date
1 Public Comment Period on Intent to Make a Determination - May 25, 2022

Contacts

Garrett Sykes
Department of National Defence
Garrett Sykes, Officer Commanding
5 Wing Goose Bay
Happy Valley-Goose Bay, Newfoundland and Labrador A0P 1S0
Email: garrett.sykes@forces.gc.ca


  • Location

    • 5 Wing Goose Bay (Newfoundland and Labrador)
  • Nature of Activity

    • Building and Property Development
  • Assessment Status

    In progress
  • Start Date

    2022-05-25
  • Proponent

    Department of National Defence
  • Authorities

    • Department of National Defence
  • Assessment Type

    Project on federal lands
  • Reference Number

    83659