DFO-SCH Infilling and Floating Dock Installation, Pinsent's Arm, NL

DFO, Small Craft Harbours are proposing to install a new floating dock system in Pinsent's Arm, Newfoundland Labrador. The project will require infilling of the upland area; and construction and installation of a new cribwork headblock, as well as two new floating docks, each measuring 16m in length. The new floating docks will be anchored to the headblock via gangway and anchored using concrete blocks.


Latest update

June 04, 2021 - The assessment decision statement has been issued to the proponent.

Participate

Contacts

Fisheries and Oceans Canada
Paul Curran, Regional Engineer
10 Barters Hill
St. John's, Newfoundland and Labrador A1C 5X1
Telephone: 709-772-6660
Email: paul.curran@dfo-mpo.gc.ca


  • Location

    • DFO-SCH Infilling and Floating Dock Installation, Pinsent's Arm, NL (Newfoundland and Labrador)
  • Nature of Activity

    • Ports and Harbours
  • Assessment Status

    Completed
  • Start Date

    2020-06-16
  • Proponent

    DFO, Small Craft Harbours Branch
  • Authorities

    • Fisheries and Oceans Canada
  • Assessment Type

    Project on federal lands
  • Reference Number

    80784