Harbour Redevelopment, Raleigh, Newfoundland

DFO, Small Craft Harbour is proposing redevelopment of the Raleigh site. The scope of work for this project involves the removal of a finger pier wharf consisting of ballasted timber crib with a concrete deck and the removal of an existing storage building situated on the existing wharf. The current infrastructure will be replaced with a new treated timber crib finger pier that will be protected with an armour stone breakwater. The interior of the redevelopment will include the addition of two (2) floating docks and a launchway. A new storage building will be constructed near the entrance of the facility.


Latest update

March 14, 2024 – The authorities issued their Notice of Determination and determined that the project is not likely to cause significant adverse environmental effects.

Participate

Key documents

Key documents
Document Number Document Title File Date
1 Notice of Determination - March 14, 2024

Contacts

Fisheries and Oceans Canada
Paul Curran, Regional Engineer
10 Barters Hill
St. John's, Newfoundland and Labrador A1C 5X1
Telephone: 709-772-6660
Email: paul.curran@dfo-mpo.gc.ca


  • Location

    • Raleigh (Newfoundland and Labrador)
  • Nature of Activity

    • Ports and Harbours
  • Assessment Status

    Completed
  • Start Date

    2021-08-31
  • Proponent

    Fisheries and Oceans Canada- Small Craft Harbours (DFO-SCH)
  • Authorities

    • Fisheries and Oceans Canada
    • Transport Canada
  • Assessment Type

    Project on federal lands
  • Reference Number

    82947
Disclaimer

This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.

 

Nearby assessments

...within 200 kilometres
Date modified: