New Prosperity Gold-Copper Mine Project

The Project consists of an open pit mine development and a 70,000 tonne per day concentrator facility with an average annual production of 108 million pounds of copper and 247 thousand ounces of gold production over a 20 year mine life. The project mine site, which includes the open pit, concentrator facility, support infrastructure, and associated tailings and waste rock areas, is approximately 125 km southwest of Williams Lake, British Columbia. The Project also includes an approximately 125 km long power transmission line corridor, an existing concentrate load-out facility at Macalister, BC, and existing access from Williams Lake with construction of 2.8 km of new mine road.


Disclaimer

This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given project.


Latest update

February 26, 2014 - The Minister of the Environment issued the environmental assessment decision statement.

Participate

List all documents

Contacts

  • Impact Assessment Agency of Canada
  • 22nd Floor, Place Bell
  • Ottawa, ON, K1A 0H3
  • Telephone: 613-957-0700 or 1-866-582-1884
  • Fax: 613-957-0862
  • Email: iaac.information.aeic@canada.ca

Date modified: