Project Demolition of Administrative Building #2

  • Location (St. Regis Village, Akwesasne Reserve No. 15, Québec, Quebec)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 80733
  • Last Modified: 2020-05-29
  • The proposed project involves the demolition of a three storey building with a gross floor area of approximately 721 square metres (approximately 240 square metres for each floor). The 0.144 hectare site is generally an asphalt paved parking area with the Building being the sole structure on the site. The project includes: Complete demolition and disposal of the Building including foundations.  Removal and lawful disposal of any hazardous materials and designated ...

Project Saint John Airport Wastewater Treatment Facility Upgrades

  • Location (Saint John Airport Wastewater Treatment Facility Upgrades, New Brunswick)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 80742
  • Last Modified: 2020-05-29
  • The project consists of upgrading an aging wastewater treatment facility. The upgrades will include switching the facility from a chlorination disinfection system to a UV disinfection system, and will allow the new facility to process 170 cubic meters of wastewater per day, up from 105. More specifically, the project scope includes: - wastewater lift station, - 2 pump stations, and - 1 wastewater treatment plant The project will benefit the public by ensuring that wastewater effluent standards ...

Project Gull Bay Roads Rehabilitation

  • Location (Neebing, Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 80744
  • Last Modified: 2020-05-29
  • The project will reconstruct approximately a combined total of 10 kilometres of contiguous roads on reserve including improvements or relocation of the entrance to Highway 527. The work includes resurfacing and grading, widening of roadway sections, brush clearing, ditching, sightline improvements, regulatory and warning signs, installation of approximately 43 culverts and drainage modifications.

Project Storm Sewer Rehabilitation: Blackburn Hamlet Bypass and Renaud Road

  • Location (Ottawa, Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 80741
  • Last Modified: 2020-05-29
  • Project Purpose             The City of Ottawa has identified two sites with storm sewer assets in the Blackburn Hamlet area which have reached the end of their service life and are in need of replacement. The infrastructure requiring replacement is critical to road, channel, and sewer stabilization. Impacts to the surrounding streets, neighbourhoods, and the environment are expected to be minor. Project Summary ...

Project Phase 5 of the dust collector replacement program at the Viterra grain terminal in the port of Montreal

  • Location (Port of Montreal (Quebec), Quebec)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 80743
  • Last Modified: 2020-05-29
  • Phase 5 of a multi-year program to improve dust collection at Viterra's grain terminal (Elevator n°4) by replacing the cyclone systems with new higher efficiency bag-house dust collection systems. The scope of work also includes reconfiguration of air flows and the addition of a new dust collector to collect airborne dust generated during truck unloading operations.

Project J5D OPGW Upgrade Project

  • Location (Windsor, Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 80736
  • Last Modified: 2020-05-29
  • Hydro One Network Inc. (Hydro One) proposes to replace the two existing shield wires on its existing International Power Line (IPL) J5D with two new optical ground wires (OPGW), as well as replace and upgrade the circuit's telecom and protection equipment. The existing telecom and protection systems of IPL J5D and associated control equipment are reaching the end of their service life. IPL J5D is an international 230 kV transmission line that crosses the Canada-United States border ...

Project Installation of Beaver Baffles in Range and Training Area B2, at Canadian Forces Base Borden

  • Location (Canadian Forces Base Borden, Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 80740
  • Last Modified: 2020-05-29
  • The Department of National Defence (DND) Real Properties Operations Borden Detachment, proposes to install a beaver baffle across a range road, connecting a pond and downstream intermittent watercourse. The roadway is located between Range and Training Area B1 and B2, at CFB Borden. The installation of the beaver baffle will allow for waterflow out of the pond area and will maintain a consistent water level in the pond, improving the habitat for a Species at Risk. Furthermore, this will remove ...

Project Reconstruction of Nawash Unceded First Nation Roads and Culverts

  • Location (Neyaashiinigmiig, Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 80739
  • Last Modified: 2020-05-29
  •   The project will replace 23 culverts and reconstruct and resurface sections of roads in Chippewas of Nawash First Nation, Ontario. A total of 15 crossing culverts and 8 driveway culverts will be replaced and possibly upsized, which will also include cleaning out and regrading ditches, applying measures to prevent erosion of drainage inlets and outlets, relocating utilities, and reconstructing (2000 square metres) and resurfacing (400 square metres) sections of roads. The project will ...

Project Runoff management system optimization project at Pointe-Noire facilities

  • Location (Pointe-Noire, Quebec)
  • Assessment Type: Project on federal lands
  • Status: Completed
  • Reference Number: 80396
  • Last Modified: 2020-05-29
  • The Société ferroviaire et portuaire de Pointe-Noire(SFPPN) owns industrial, rail and port infrastructure in the Pointe-Noire sector in Sept-Îles, Quebec. In order to ensure the efficiency of its facilities and equipment in terms of surface water management, the SFPPN wishes to optimize its surface water drainage system, in particular with regard to the collection and water treatment, optimization of existing equipment or installations (pumping stations, ditches and ...

Project Atikameksheng By-Pass Road Construction

  • Location (Naughton, Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 80738
  • Last Modified: 2020-05-29
  • The Project involves the construction of approximately 5 kilometres of a new by-pass road (approximately 3 kilometres of gravel and 2 kilometres of asphalt overlay) through undisturbed rock and forest. The Project scope will include the construction of an approximately 30 metre span rip-rap stone causeway to cross a wetland area along new road. The construction of the by-pass road will be an alternative travel route for improved safety of residents and improves access to the community. It will ...

Project Reconfiguration of road access to the administrative building

  • Location (Grande-Anse, Quebec)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 80723
  • Last Modified: 2020-05-29
  • In the context of the recent use of land in the Saguenay Industrial-Port Zone for wood pellet storage, the Saguenay Port Authority plans to reconfigure a road access. The existing access is mainly used for a reduced number of personal vehicles whereas, from now on, it will be used for a frequent usage of heavy vehicles in addition to personal vehicles. The type of reconfiguration to be made is currently under study.

Project Paudash Street Reconstruction

  • Location (Hiawatha, Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 80737
  • Last Modified: 2020-05-29
  • The project will rehabilitate approximately two-kilometres of Paudash Street between Cowe Street and Lakeshore Road in Hiawatha, Ontario. More specifically the project work will consist of regrading the gravel shoulders; improving drainage by replacing 30 culverts underneath the road and installing a 200 metre perforated high-density sub-drain on the north side; and resurfacing the road with asphalt. A new, two-kilometre, multi-use pathway will also be installed along the north side of the ...

Project Tilbury Phase 2 LNG Expansion Project

  • Location (Tilbury Island, Delta, British Columbia)
  • Assessment Type: Planning Phase for Impact Assessment
  • Status: In progress
  • Reference Number: 80496
  • Last Modified: 2020-05-29
  • FortisBC Holdings Inc. is proposing to expand its existing Tilbury LNG Project, a liquefied natural gas (LNG) storage and production facility located on Tilbury Island, in Delta, British Columbia. As proposed, the Tilbury Phase 2 LNG Expansion Project would increase the facility's LNG production capacity by more than 50%, up to 13 700 tonnes of LNG per day for an operational life of at least 40 years. The expansion would allow for a total storage capacity of up to 208 000 cubic metres of ...

Project Sanitary Lift Station Upgrades at Royal Military College of Canada

  • Location (Royal Military College of Canada, 20 General Crerar Crescent, Kingston, Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 80734
  • Last Modified: 2020-05-29
  • The Sanitary Lift Station at RMCC is in need of replacement to ensure continued function, and to improve the safety of workers that maintain the stations, associated pumps and wells. The proposed project involves removal and replacement of the pump station and wet well, associated underground utility infrastructure, along with upgrades to lift station electrical controls at the RMCC Boathouse building located at 20 General Crerar Crescent. The construction work is planned to begin in autumn ...

Project Cavendish Campground Lunchroom Construction

  • Location (Prince Edward Island National Park, Prince Edward Island)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 80735
  • Last Modified: 2020-05-29
  • The previous Cavendish Campground lunchroom experienced a devastating fire last fall and, as such, burned beyond repair. National park staff now require a lunchroom, wash up area and bathroom for their daily personal needs. Site design and drawings have been completed and the new site for the staff room has been designated within the rehabilitated dumping station for Cavendish Campground. The new lunch room will be situated in the northeast corner of the former dumping station site. It will ...

Project Shoal Lake 40 New K-8 School

  • Location (Shoal Lake 40, Ontario)
  • Assessment Type: Project on federal lands
  • Status: Completed
  • Reference Number: 80619
  • Last Modified: 2020-05-29
  • To construct a new 1,704 sq. m K-8 school building with classrooms, library, cafeteria, multi-purpose rooms, a large gymnasium, staff offices, meeting rooms and support spaces. The school grounds will also include a soccer field, basketball court, playgrounds, outdoor cooking area and outdoor educational areas, as well as support infrastructure such as garbage collection, snow storage areas, parking lot and a septic tank and field. The school site covers an area of approximately 3.5 ha.

Project Waskonaman Hill Gravel Project (Amendment)

  • Location (Frog Lake First Nation, Alberta)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 80391
  • Last Modified: 2020-05-29
  • Waskonaman Askih Construction GP LTD. is proposing to amend the original project submission for the gravel pit to include additional areas. Aggregate was identified over a 15 ha area, the proponnt is proposing to amend their 3 ha pit to a 15 ha pit, including a 1.5 ha laydown area. The proposed project would consist of 5 Phases (3 ha in size). Each phase will extract approximately 100,000 m3 of aggregate, for a total of ~500,000 m3. Based on Alberta Transportation criteria (1 m3 = 1.632 ...

Project Trans Northern Pipeline Integrity Digs

  • Location (Rouge National Urban Park, Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 80729
  • Last Modified: 2020-05-28
  • Maintenance of 40 year old pipeline owned by Trans-Northern Pipeline (TNPI) is required at four locations within Rouge National Urban Park. This pipeline delivers refined petroleum products, including gasoline, diesel and aviation fuel to service airports and businesses throughout Ontario. The maintenance required, known as integrity digs, involve exposing an area of compromised pipe via open cut (excavation) and conducting in-situ detailed inspection and repairs. The temporary work space ...

Project Lower Nicola Indian Band Community Solar Gardens

  • Location (Lower Nicola Reserve Lands - Nicola Mameet No. 1, Joeyaska No. 2, and Zoht No. 4, British Columbia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 80727
  • Last Modified: 2020-05-28
  • The Proponent (Lower Nicola Indian Band, LNIB) intends to install solar photovoltaic (PV) panels on key First Nation community and residential buildings in Lower Nicola, BC. The Lower Nicola Indian Band Community Solar Gardens Project (the Project) will involve the installation of solar panels on or near 16 buildings across three reserve lands, including the Shulus Arena, LNIB Health Building, LNIB Fire Hall, LNIB Social Housing Rentals, Rocky Pines Community Centre, Administration Building, ...

Project DFO-SCH Boat Launchway Construction, Jenkins Cove (Twillingate), NL

  • Location (Jenkins Cove, Newfoundland and Labrador)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 80726
  • Last Modified: 2020-05-28
  • DFO, Small Craft Harbours are proposing to construct a new launchway in Jenkins Cove (Twillingate), Newfoundland. The project will require demolition of the existing native timber slipway and storage area. A new launchway will be constructed in the footprint of the former slipway. The launchway will be concrete slab construction measuring approximately 4.8m wide by 21m long, utilizing 9 precast concrete slabs. The storage area will be backfilled and topped with Class A material. Riprap ...

Project North Caribou Lake First Nation School

  • Location (North Caribou Lake First Nation, Ontario)
  • Assessment Type: Project on federal lands
  • Status: Completed
  • Reference Number: 80608
  • Last Modified: 2020-05-28
  • The construction of a new Kindergarten to Grade 12 school. The school site will be approximately 7.2 hectares in size with the school itself approximately 4,830 m2 . The school is designed for 35 service years with opportunities for expansion of up to 500 students. The enrolment is projected to be 384 students by 2026. The project will involve the construction of the new school, extension of infrastructure and associated landscaping. The new school location is on the existing community baseball ...

Project Mountaineer Lodge Staff Accommodation - 221 Hector Road

  • Location (Banff National Park, Alberta)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 80634
  • Last Modified: 2020-05-28
  • This project encompasses the full scope of work for construction of a new staff accommodation building on the undisturbed lot, 221 Hector Road, in the Village of Lake Louise Alberta. Activities will include tree and vegetation removal, geotechnical investigation, building construction and lot landscaping. This project will be assessed with a basic impact analysis. This assessment will be supported by the Geotechnical and Environmental Investigations pre-approved impact assessment, and the ...

Project Upgrading of Roadways in Beausoleil First Nation

  • Location (Beausoleil First Nation Reserve, Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 80721
  • Last Modified: 2020-05-27
  • The project will upgrade approximately 17.2 kilometres of roadway in Beausoleil, Ontario. The upgrades will involve the installation of sidewalks and a ditching system, rehabilitation of the sub-grade, and asphalt surfacing of the roadway and shoulders from O-Gema Road to Kate Kegwin Road (0.35 kilometres), with the remaining roads and shoulders (16.85 kilometres) paved with a double surface treatment. The project will improve road safety and reliability for drivers, cyclists and pedestrians, ...

Project West Path Delivery 2022 and 2023 Projects

  • Location (Turner Valley, Alberta)
  • Assessment Type: Assessment not applicable
  • Status: Completed
  • Reference Number: 80548
  • Last Modified: 2020-05-27
  • Foothills Pipe Lines (South B.C) Ltd. (Foothills) and NOVA Gas Transmission Ltd. (NGTL) are proposing the construction and operation of several pipeline segments and associated facilities between southwest Alberta and southeast British Columbia, as part of a broader West Path Delivery Program, which is made up of four distinct projects (the West Path Delivery 2022 and 2023 Projects). The projects would include a total of approximately 108 kilometres of natural gas pipeline, and associated ...

Project Rideau River Eastern Pathway "Stanley Avenue Missing Link" - Proposed Multi-use Pathway

  • Location (Ottawa, Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 80724
  • Last Modified: 2020-05-27
  • Project summary, including how the NCC is involved : The City of Ottawa is proposing to close the pre-existing gap in the multi-use pathway between the south limit of Stanley Avenue and the north side of the New Edinburgh Park playground (where the pathway transitions to/from mixed traffic) with the addition of a new segment of multi-use pathway. The proposed design considers land ownership and land use, the existing corridor esthetics, safety and affordability in providing an enhanced ...

Project Demolition of aged Royal Canadian Dragoon facilities at Garrison Petawawa

  • Location (Garrison Petawawa, Ontario)
  • Assessment Type: Project on federal lands
  • Status: Completed
  • Reference Number: 80306
  • Last Modified: 2020-05-27
  • There are total of 11 existing aged buildings on federal property, Garrison Petawawa, Ontario, that have been identified to be demolished.   Buildings C-039 (2,084m2), C-040 (2,210m2) and C-103 (2,080m2) will be demolished down to the concrete slab. The slab and foundations will remain below grade. Existing concrete pavement will be used for a parking lot.   Buildings B-101 (383m2), B-102 (708m2), B-104 (1,410m2) and G-022 (131m2) will be completely demolished including ...

Project Drainage infrastructure improvements - Weirs, siphons and ditch

  • Location (Chambly Canal National Historic Site, Quebec)
  • Assessment Type: Project on federal lands
  • Status: Completed
  • Reference Number: 80518
  • Last Modified: 2020-05-27
  • Parks Canada wishes to make improvements to the drainage infrastructure in various sectors of the Chambly Canal. Work is planned on siphons 1, 2 and 3, weirs 1, 2 and 3, and the ditch by the workshop. For some structures, it will be necessary to dry the work sites. The work will be completed in the fall, following the navigation season, when the canal's water level is lowered for the winter. Siphon 1 The work planned includes completely demolishing and rebuilding Siphon 1, ...

Project SaskPower Pole Replacement in Prince Albert National Park - east of Sandy Lake

  • Location (Prince Albert National Park, Saskatchewan)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 80722
  • Last Modified: 2020-05-27
  • SaskPower is proposing to salvage a two-pole structure that is severely decayed and replace it with a new single-pole double deadend structure. Once replaced, guy-wires and screw-style anchors will be installed to support the poles. To access the project location, SaskPower requires that the vegetation and regenerating trees/shrubs along the existing easement be cleared. The vegetation clearing will take place along the existing overhead power easement for a distance of approximately 950 metres ...

Project Miscou Fish Products Inc. Construction of Seafood Plant Addition

  • Location (Miscou Small Craft Harbour, New Brunswick)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 80720
  • Last Modified: 2020-05-27
  • The proposed project involves the construction of an addition to the existing Miscou Fish Products Inc. seafood processing plant, located at the Miscou Harbour Fisheries and Oceans Canada (DFO) - Small Craft Harbour (SCH) facility.  The proposed expansion will consist of a two-storey, (±218m2 per storey) wooden structure on a concrete foundation and will be attached to the existing seafood plant.  The new addition will house offices and employee break/lunch rooms, and will not ...

Project Kasabonika Lake New 7 - 12 school

  • Location (Kasabonika Lake First Nation, Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 80628
  • Last Modified: 2020-05-27
  • The project is a new school for Grade 7-12 with a floor area of 3,000 square meters.  The building will include a gym, stage/cafeteria, music/MPR, library, classrooms, and administration and support spaces.  The site will include a multi-purpose athletic field, granular pathways, parking lot and access roads off the main road as well as from the road leading to the dump.  Approximately 22,170 square meters of the site area will be seeded with grass mixes. 

Project Wastewater System Upgrades - Acadia First Nation

  • Location (Acadia First Nation, Nova Scotia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 80718
  • Last Modified: 2020-05-26
  • The Project includes wastewater system upgrades located on the Acadia First Nation property. This  includes the replacement and construction of sanitary sewers and lift stations within existing rights-of-ways.  The proposed project intends to provide for full community servicing to the Town of Yarmouth municipal wastewater system, including planned future developments.

Project Maple Creek Irrigation Project- Decommissioning of Dry Side

  • Location (near Maple Creek, Saskatchewan)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 80687
  • Last Modified: 2020-05-26
  • A portion of the irrigation system at Maple Creek was rendered unfeasible after flooding in 2010. This portion has been dry since 2010, and is set to be decommissioned this year.  The project involves removal of small-scale water control structures, which include such things as culverts and weirs, decommissioning drainage ditches previously used to supply and drain water to and from the irrigation system, backfilling ditches and other areas, and revegetating ...

Last UpdatedDisplay Filters