Project Maintenance of the dams at Lac à la Pêche and Lac Wapizagonke, La Clairière area

  • Location (La Mauricie National Park of Canada, Quebec) (La Mauricie National Park of Canada, Quebec)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 90495
  • Last Modified: 2026-08-18
  • Relevance: 414.96
  • The dams at Lac à la Pêche and Lac Wapizagonke (La Clairière sector) require maintenance to ensure their safety and extend their service life. The work includes repairing the caissons and wooden abutments, stabilizing the riprap downstream of the dams and at the shore supports, and controlling vegetation adjacent to and above the abutments and supports. 

Project Wharf 401 Reconstruction - Millerand Harbour - Magdalen Islands

  • Location (Millerand Harbour, Magdalen Islands, Quebec)
  • Assessment Type: Project on federal lands
  • Status: Completed
  • Reference Number: 90306
  • Last Modified: 2026-08-18
  • Relevance: 414.95
  • A recent underwater inspection revealed extensive deterioration of exposed wooden com-ponents and bolted assemblies. New cladding or ladders can no longer be safely installed due to the advanced degradation of the existing wood. Built in 1974, the structure has exceeded its intended lifespan, and partial repairs are no longer viable. A full reconstruction of Wharf 401 is required to ensure the safety of vessels and fishermans.   The project includes the following ...

Project Fredericton Farm Services Building Replacement Project

  • Location (Fredericton, New Brunswick)
  • Assessment Type: Project on federal lands
  • Status: Completed
  • Reference Number: 90480
  • Last Modified: 2026-08-18
  • Relevance: 414.95
  • Project Description: Agriculture and Agri-Food Canada intends to build a new 1,326 m2 farm services building and demolish an old 2,060 m2 building at the Fredericton Research and Development Center. The development work will also include: 1. road and parking lot improvements, 2. utility hookups, and 3. building landscaping.

Project Shell Beach Erosion Control Project, Portland Island

  • Location (Gulf Islands National Park Reserve, British Columbia)
  • Assessment Type: Project on federal lands
  • Status: Completed
  • Reference Number: 90283
  • Last Modified: 2026-08-18
  • Relevance: 414.94
  • Ongoing monitoring by Parks Canada and First Nations has shown severe erosion at Shell Beach on Portland Island. Parks Canada is proposing a shoreline restoration project to reduce the levels of erosion. The work will involve a soft-armouring approach to dissipate wave action and the revegetation of native plants to further stabilize the shoreline. Parks Canada will complete a basic impact assessment to assess the proposed project's potential impacts to natural and cultural resources. The ...

Project Crown Mountain Coking Coal Project

  • Location (Sparwood, British Columbia)
  • Assessment Type: Impact Assessment by the Agency
  • Status: In progress
  • Reference Number: 80087
  • Last Modified: 2026-08-18
  • Relevance: 414.94
  • Crown Mountain Resources Ltd. is proposing to construct and operate an open-pit metallurgical coal mine in the Elk Valley, approximately 12 kilometres from the District of Sparwood in southeastern British Columbia. As proposed, the production capacity of the project would be approximately 2.0 million tonnes per year, over a mine-life of about 15 years.   Please note that the proponent for this project was previously NWP Coal Canada Ltd.

Project YYG GSE Area Expansion

  • Location (Charlottetown, Prince Edward Island)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 90711
  • Last Modified: 2026-08-18
  • Relevance: 414.94
  • The proposed project consists of constructing a paved Ground Support Equipment (GSE) parking and staging area on previously developed airport lands adjacent to the terminal building and existing apron. The work includes pavement construction, grading, stormwater management infrastructure, subdrain installation, utility servicing for future electric GSE charging infrastructure, lighting modifications, and associated site works. The project will support airport ground operations, improve ...

Project Proposed 2026 Retail Petroleum Outlet

  • Location (Charlottetown, Prince Edward Island)
  • Assessment Type: Project on federal lands
  • Status: Completed
  • Reference Number: 90644
  • Last Modified: 2026-08-18
  • Relevance: 414.94
  • Construction The construction of a single storey 477 m2 (5,134 ft2) wood framed commercial building with slab-on-grade foundation. The new commercial building will house two (2) tenants including the Retail Petroleum Outlet with Convenience Store and a quick-service restaurant with drive-thru. Bio-Physical Environment: A site reconnaissance was conducted on June 10, 2026. The construction and operation are not projected to have any adverse environmental effect. Human Environment: The ...

Project ATCO Pipeline 1165 - Ext (60 PE) Kainai Administration Building

  • Location (Blood Tribe, Alberta)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 90710
  • Last Modified: 2026-08-18
  • Relevance: 414.94
  • ATCO Gas and Pipelines Ltd. is planning to install 100 meters of 60 millimeter diameter polyethylene gas main and 65 meters of 42 millimeter gas service line at Blood Tribe. The new distribution gas main will accommodate a proposed new administration building in Standoff adjacent to the Kainai Wellness Center. The proposed gas line will be installed at a depth of 0.8 to 1.2 meters and will be tied into the existing gas main. The proposed methods of installation will include trenching, as well ...

Project ATCO Pipeline 1165 - Ext (6c) Kainai Community Subdivision

  • Location (Blood Tribe, Alberta)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 90708
  • Last Modified: 2026-08-18
  • Relevance: 414.93
  • ATCO Gas and Pipelines Ltd. is planning to install 830 meters of 60 millimeter diameter polyethylene gas main and six short 42 millimeter gas services at Blood Tribe on previously cleared lands. The new distribution gas main will accommodate a proposed commercial subdivision on the eastern edge of Standoff. The proposed gas line will be installed at a depth of 0.8 to 1.2 meters and will be tied into the existing gas main. The proposed methods of installation will include trenching, as well as ...

Project Sanitary Lift Station Upgrades at Royal Military College of Canada

  • Location (Royal Military College of Canada, 20 General Crerar Crescent, Kingston, Ontario)
  • Assessment Type: Project on federal lands
  • Status: Completed
  • Reference Number: 80734
  • Last Modified: 2026-08-18
  • Relevance: 414.93
  • The Sanitary Lift Station at RMCC is in need of replacement to ensure continued function, and to improve the safety of workers that maintain the stations, associated pumps and wells. The proposed project involves removal and replacement of the pump station and wet well, associated underground utility infrastructure, along with upgrades to lift station electrical controls at the RMCC Boathouse building located at 20 General Crerar Crescent. The construction work is planned to begin in autumn ...

Project Laydown and Logistics areas

  • Location (Toronto Pearson International Airport, Ontario)
  • Assessment Type: Project on federal lands
  • Status: Completed
  • Reference Number: 90304
  • Last Modified: 2026-08-18
  • Relevance: 414.93
  • The Proposed Project: Laydown and Logistics areas As part of the Greater Toronto Airports Authority's (GTAA's) Toronto Pearson Airport Longterm Investment in Facilities & Terminals (LIFT) Program, logistics and laydown areas will be constructed on Airport Lands, to facilitate construction needs. The sites will consist of temporary construction trailers, worker parking lot, material laydown, equipment storage, and associated infrastructure to support Airport construction ...

Project Temporary Laydown and Logistics Area

  • Location (Toronto Pearson International Airport, Ontario)
  • Assessment Type: Project on federal lands
  • Status: Completed
  • Reference Number: 90415
  • Last Modified: 2026-08-18
  • Relevance: 414.93
  • The Proposed Project: Laydown and Logistics areas  As part of the Greater Toronto Airports Authority's (GTAA's) Toronto Pearson Airport Longterm Investment in Facilities & Terminals (LIFT) Program, logistics and laydown areas will be constructed on Airport Lands, to facilitate construction needs. These sites will be developed on unmaintained vegetated areas located both airside and ...

Project Warkworth Institution – Fuel Storage Tank System Replacements and Removals (8)

  • Location (Warkworth Institution, Ontario)
  • Assessment Type: Project on federal lands
  • Status: Completed
  • Reference Number: 90455
  • Last Modified: 2026-08-18
  • Relevance: 414.93
  • Correctional Service Canada requires the removal and replacement of five (5) fuel storage tanks at the Warkworth Institution site as well as three (3) additional fuel tank systems require removal with no replacements contemplated. The tanks are all greater than 20 years old and deteriorating. The existing tanks on-site are concrete encased petroleum fuel storage tanks. The project will entail decommissioning and removal of the existing tanks, design of tanks and product transfer areas, and ...

Project Yellowhead Copper Project

  • Location (150 kilometres northeast of Kamloops, British Columbia)
  • Assessment Type: Impact assessment by substitution
  • Status: In progress
  • Reference Number: 89694
  • Last Modified: 2026-08-18
  • Relevance: 414.93
  • Trekor Metals Limited is proposing the construction, operation, and closure of a new open-pit copper mine located about 150 kilometres northeast of Kamloops, British Columbia. The Yellowhead Copper Project has been designed with a production capacity of 90,000 tonnes of ore per day (up to 32 million tonnes per year) over a 25-year mine life. The project, which would also produce gold and silver, includes a new mill, an approximately 110 kilometre transmission line that would connect to an ...

Project Fort Frontenac Storm Drainage and Parking Lot Reconstruction Project

  • Location (Fort Frontenac, in Kingston, Ontario)
  • Assessment Type: Project on federal lands
  • Status: Completed
  • Reference Number: 81548
  • Last Modified: 2026-08-18
  • Relevance: 414.93
  • The Fort Frontenac Storm Drainage and Parking Lot Reconstruction project involves replacing and repairing site infrastructure to manage the stormwater within Fort Frontenac, in Kingston, Ontario. The work includes replacement/upsizing of existing portions of the storm sewers, installing new storm systems, new outfall, abandoning existing service connections and reconstructing the parking lot to address site drainage issues. The project also includes spot repairs to the sanitary sewer prior to ...

Project Heating, Ventilation, and Air Conditioning (HVAC) and Roof Refit - CFB Kingston

  • Location (CFB Kingston, 6 Red Patch Avenue, Kingston, Ontario)
  • Assessment Type: Project on federal lands
  • Status: Completed
  • Reference Number: 80756
  • Last Modified: 2026-08-18
  • Relevance: 414.92
  • The project involves retrofitting the roof and relocating the HVAC units. Building MC39 is a pre-engineered, single storey steel building constructed circa 1990 with a with a gross floor area of 3,406 m2. There are currently nine (9) rooftop HVAC units and associated condensers on a standing seam metal roof. The condensers are supported by the platform structure that runs the length of the building, while the HVAC units sit on roof curbs. There are roof leaks around the roof penetrations for ...

Project Canadian Forces Base Kingston McNaughton Building A21 Solar Panel Demolition

  • Location (Canadian Forces Base Kingston. It is located directly west of the Central Heating Plant, building MA21, located at 15 Craftsman Blvd., Ontario)
  • Assessment Type: Project on federal lands
  • Status: Completed
  • Reference Number: 80281
  • Last Modified: 2026-08-18
  • Relevance: 414.92
  • This is a project to demolish the solar panels and associated piping planned for the fall/winter 2019. The project involves removing the six sections of ground mounted solar panels and all associated piping, valves, fittings and related mechanical items, removing the concrete piers, removing the chain link fence around the site, removing a set of stairs and landing, and removing a glycol tank and piping within the Central Heating Plant. The existing pipe bridge connecting the solar panel ...

Project Pikangikum First Nation - Short Term Water and Wastewater Upgrades

  • Location (Pikangikum First Nation - Water, Ontario) (Pikangikum First Nation - Wastewater, Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 90629
  • Last Modified: 2026-08-18
  • Relevance: 414.88
  • Pikangikum First Nation requires upgrades and repairs to existing water and wastewater infrastructure with short-term work being conducted in a two-phased approach. The Water Treatment Plant is over 30 years old, in poor condition, and under capacity to meet community demands. Similarily, the Wastewater Treatment System is older and in poor condition. Phase 1: Immediate upgrades to the Water Treatment Plant will include replacement of existing mechanical and electrical components to ensure ...

Project Saskatoon Airport Authority - Firehall Renovation and Expansion

  • Location (Saskatoon Airport Fire Department, Saskatchewan)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 90707
  • Last Modified: 2026-08-17
  • Relevance: 414.84
  • The Proposed Project  This project involves the of the renovation and expansion of the Airport Firehall. Site preparation activities will include geo-technical studies, surveys, and environmental studies. The Saskatoon Airport Authority is the leaseholder for this development on its property and is therefore the lead authority on this project.  Environmental description includes greenfield surrounded by industrial/commercial land. 

Project CFB Kingston Energy Conservation Project

  • Location (Canadian Forces Base Kingston, Ontario) (Kingston Armoury, 100 Montreal St. Kingston, Ontario) (Brockville Armoury 144 King St. East Brockville, Ontario)
  • Assessment Type: Project on federal lands
  • Status: Completed
  • Reference Number: 81113
  • Last Modified: 2026-08-17
  • Relevance: 414.84
  • This project consists of work execution, labour, materials/supplies and tools needed for the improvement of the energy efficiency of the Canadian Forces Base Kingston real property, with measures to lower greenhouse gas emissions. The work includes but is not limited to: • Replacement of lighting systems with Light Emitting Diode (LED) lights, fixtures, and controls. • Upgrading controls on existing and new environmental systems. • Installation of variable frequency ...

Project Joyce Lake Direct Shipping Iron Ore Project

  • Location (Labrador (approximately 20 km northeast of Schefferville, QC), Newfoundland and Labrador)
  • Assessment Type: Planning Phase for Impact Assessment
  • Status: In progress
  • Reference Number: 80015
  • Last Modified: 2026-08-17
  • Relevance: 414.82
  • Joyce Direct Iron Inc. is proposing the construction, operation and decommissioning of an open-pit iron ore mine located in Newfoundland and Labrador, approximately 20 kilometres northeast of Schefferville, Quebec. As proposed, the mine would produce up to an estimated 2.5 million tons of ore per year over a life span of seven years. The project would consist of an open pit mine, dewatering of Joyce Lake, crushing and screening of ore (dry processing), waste rock disposal, support ...

Project DND New Gravel Parking Pad - 3701 Carling Avenue - Ottawa, Ontario

  • Location (Ottawa, Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 90604
  • Last Modified: 2026-08-17
  • Relevance: 414.77
  • The scope of work will consist of building a 43 meter by 30 meter (approximately) gravel pad. This would involve excavating 18 inches of topsoil, installing a Geotech fabric layer, placing 12 inches of granular B topped with 6 inches of granular, and then compacted.   

Project Reconstruction of a section of the Anse-à-Beaufils wharf

  • Location (Anse-à-Beaufils, Quebec)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 90680
  • Last Modified: 2026-08-16
  • Relevance: 414.71
  • The port of L'Anse-à-Beaufils is located on the south side of the Gaspé Peninsula. This harbour is the home port of 16 commercial fishing vessels and is owned by Fisheries and Oceans Canada. Pier 401, built in 1980, is affected by severe pile corrosion and deterioration of the concrete panels. As a result, Pier 410 must be rebuilt over a length of approximately 70 m. The proposed concept is the reconstruction of a Berliner wall anchored directly to the façade of the ...

Project Artillery Storage Shed, Halifax Citadel National Historic Site

  • Location (Halifax Citadel National Historic Site, Nova Scotia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 90650
  • Last Modified: 2026-08-16
  • Relevance: 414.66
  • The purpose of this project is to establish a purpose-built, on-site winter storage facility to eliminate the logistical challenges associated with the current off-site storage arrangement. The installation of a prefabricated storage structures (sea containers) within the Halifax Citadel ditch would be completed to provide a secure, winter storage for field guns, swivel guns, and related equipment. The facility would be equipped with electrical service, insulation, and heating to protect ...

Project Leveraging climate-smart shrimp aquaculture as an inclusive nature-based climate solution for small-scale farmers in coastal Indonesia

  • Location (Wringinputih Village, Muncar Sub -district, Banyuwangi Regency, Indonesia, Outside Canada)
  • Assessment Type: Project outside of Canada
  • Status: In progress
  • Reference Number: 90623
  • Last Modified: 2026-08-16
  • Relevance: 414.66
  • The activities assessed are part of a larger project which is funded by the International Development Research Centre and implemented by the World Resources Institute Indonesia (WRI Indonesia) which aims to identify the most cost-effective, gender-responsive and nature-friendly climate-smart strategies for increasing production of small-scale shrimp aquaculture while simultaneously restoring the critical mangrove ecosystems. The project will be implemented in ...

Project Water Distribution Expansion Project, Sable Island National Park Reserve

  • Location (Sable Island National Park Reserve of Canada, Nova Scotia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 90649
  • Last Modified: 2026-08-16
  • Relevance: 414.66
  • The proposed work is to expand the Main Station water distribution system to provide water to the Carpentry Shop and the Garage. The project will improve operational efficiency, provide dedicated handwashing and cleaning option within the Carpentry Shop, and re-establish water service to the Garage for vehicle washing. The proposed work includes installation of water supply lines from Visitors Quarters (Vis Q), a utility sink and on demand water heater in the Carpentry Shop, a small wastewater ...

Project ATCO pipeline 1147151 - 1550 - ALT - Tsuut'ina Medical Centre

  • Location (Tsuut'ina Nation, Alberta)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 90646
  • Last Modified: 2026-08-15
  • Relevance: 414.55
  • ATCO Gas and Pipelines Ltd. is planning to relocate approximately 500m of 60.3mm diameter polyethylene gas main at the request of Tsuut'ina Nation to accommodate a proposed Medical Centre currently in conflict with the existing gas main. The gas main will be installed at a depth of 0.8m - 1.1m below ground surface and will be installed primarily using horizontal diagonal drilling (HDD) and plow-in methods.   Construction will include removal of topsoil, installation of gas main, ...

Project 1471 Blair Road – Pine View Golf Course Clubhouse Demolition

  • Location (1471 Blair Road - Pine View Golf Course, Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 90647
  • Last Modified: 2026-08-15
  • Relevance: 414.55
  • The Pine View Golf Course proposes to demolish its clubhouse building. The building is located within the Pine View Golf Course at 1471 Blair Road in Ottawa. It has reached the end of its lifecycle and should be removed.   The clubhouse is a one-storey concrete block building, with a suspected mid 1970s construction date. The building houses a dining hall/reception hall and restaurant, locker rooms, various offices, washrooms and mechanical rooms. It has a footprint of approximately ...

Project Ermineskin Cree Nation On-Reserve Water Supply Project

  • Location (Ermineskin Cree Nation, Alberta)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 90648
  • Last Modified: 2026-08-15
  • Relevance: 414.55
  • Ermineskin Cree Nation is proposing to construct Phase I of an On-Reserve Water Supply Project. The project will include the construction of 1.3 km of waterline from the Nation boundary to a new water reservoir and pump station and the dormancy of 6 existing groundwater well. The project is largely contiguous to existing linear infrastructure and the pipeline will be installed using a trench method. The project will cross up to 4 temporary graminoid marsh wetlands. There are no known or ...

Project Sage Meadow Development Phase 1A Infrastructure Works

  • Location (Saulteaux Junction Indian Reserve No.76, Saskatchewan)
  • Assessment Type: Project on federal lands
  • Status: Completed
  • Reference Number: 90586
  • Last Modified: 2026-08-14
  • Relevance: 414.52
  • Zagime Anishinabek is proposing a mix of both large and small format commercial tenants, medium and high-density mixed-use residential areas, and additional multi-unit residential buildings on the urban reserve of Saulteaux Junction Zagime IR No. 74-6. The proposed project is called Sage Meadow Development and will cover approximately 280 acres. Sage Meadow Development will utilize the existing systems on the property and tie in new service connections. The site is currently undeveloped ...

Project Star Blanket Cree Nation, Okanese First Nation, and Little Black Bear Band Regional Waste Diversion Center

  • Location (Star Blanket Cree Nation, Saskatchewan)
  • Assessment Type: Project on federal lands
  • Status: Completed
  • Reference Number: 90585
  • Last Modified: 2026-08-14
  • Relevance: 414.52
  • Star Blanket Cree Nation, Okanese First Nation, and Little Black Bear First Nation are proposing to construct a Waste Diversion Centre to serve the three member Nations.   The development will include the construction of an attendant building with site equipment storage bays, along with an aggregate-surfaced pad area designed to accommodate diversion and storage bays for recyclable materials and household hazardous waste (including secondary containment). The site will also feature ...

Project One Arrow First Nation Subdivision Project

  • Location (One Arrow First Nation, Saskatchewan)
  • Assessment Type: Project on federal lands
  • Status: Completed
  • Reference Number: 90540
  • Last Modified: 2026-08-14
  • Relevance: 414.52
  • The proposed subdivision development project will consist of construction of 54 lots, encompassing approximately 15 ha of land. The development will require underground utility installations, site roadways and ditching, and lot grading. The proposed site is located immediately north of an existing subdivision, to which the proposed subdivision roadways would connect with. Erosion control measures will be implemented as required during construction until adequate vegetative growth has ...

Project Taza Park West Self Storage Facility

  • Location (Tsuut'ina Nation, Alberta)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 90706
  • Last Modified: 2026-08-14
  • Relevance: 414.52
  • StoreWest is proposing to construct a self-storage facility at Tsuut'ina Nation. The proposed project will be located at Taza Park West near the intersection of Glenmore Trail and Tsuut'ina Trail. The proposed project will include the construction of a three story self-storage building with a footprint of  3,959 meters squared, loading bays, a nine stall parking lot, an access road, and a landscaped amenity area. The project will be built on a pre-graded site with utilities already ...

Project Fire Hall 27 Demolition

  • Location (Calgary International Airport, Alberta)
  • Assessment Type: Project on federal lands
  • Status: Completed
  • Reference Number: 90520
  • Last Modified: 2026-08-14
  • Relevance: 414.51
  • Lot MK.13 at the Calgary International Airport currently houses a 1960's two-storey 7200 sqft. Building T042 (old Fire Hall 27) that is slated for demolition. The project will disconnect, decommission, cap, mark, and where necessary, remove all utilities including electricity, gas, sanitary, and water lines at the closest t-junction / manhole / junction box adjacent to the building within the property line and remove and dispose of the existing building, including any hazardous materials, ...

Project Jasper Park Lodge Wellness Area Development & Trail 4a Refurbishment

  • Location (Jasper National Park of Canada, Alberta)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 90705
  • Last Modified: 2026-08-14
  • Relevance: 414.51
  • The Fairmont Jasper Park Lodge is proposing to redevelop one of their Sundeck locations and complete upgrades to Trail 4a directly adjacent to Lac Beauvert and South of their Main Lodge Building. Project activities will include work within the Riparian Zone (changes to trail surface materials, grading/levelling, installation of permanent structures) as well as the introduction of a year-round sauna/cold plunge experience. This project permanently alters the purpose of the Sundeck and associated ...

Project Extension of Basile McDougall Street and preparation for housing development - Abitibiwinni

  • Location (Pikogan, Quebec)
  • Assessment Type: Project on federal lands
  • Status: Terminated
  • Reference Number: 88884
  • Last Modified: 2026-08-14
  • Relevance: 414.5
  • The project is located in the community of Pikogan. It consists of extending Basile McDougall street to allow urban development, including the addition of residential lots. The street will be extended by approximately 500 meters. The installation of underground infrastructures to manage stormwater, sanitary water and drinking water is also part of the project. Here are the main activities planned as part of the project: - Installation of typical road infrastructure (e.g. intersections, ...

Project Regional Assessment in the Ring of Fire Area

  • Location (Ring of Fire, Ontario)
  • Assessment Type: Regional Assessment
  • Status: In progress
  • Reference Number: 80468
  • Last Modified: 2026-08-14
  • Relevance: 414.5
  • The regional assessment will be conducted in the area centred on the Ring of Fire mineral deposits in northern Ontario, approximately 540 kilometres northeast of Thunder Bay. The regional assessment aims to gather information and data on the region; understand potential effects from past, existing and future development in the Ring of Fire area; and will inform and improve future impact assessments. Indigenous partners and the Impact Assessment Agency of Canada are co-leading the regional ...

Project Jacques Cartier Bridge, Sections 1 to 9, Paving and Road Maintenance Works (2027–2029)

  • Location (Jacques Cartier Bridge, Quebec)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 90704
  • Last Modified: 2026-08-14
  • Relevance: 414.49
  • The Jacques Cartier Bridge is a vital roadway and active mobility link between Montréal and Longueuil. To ensure user safety, maintain mobility in the metropolitan area, and preserve the durability of the infrastructure, The Jacques Cartier and Champlain Bridges Incorporated (JCCBI) plans to carry out road rehabilitation work across the entire Jacques Cartier Bridge in 2027 and 2028. The project includes work on the Jacques Cartier Bridge, its approaches, and certain access ramps, ...

Project St. Mary's Subdivision Development Parcel C

  • Location (St. Mary's First Nation, New Brunswick)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 90703
  • Last Modified: 2026-08-14
  • Relevance: 414.48
  • Sitansisk is experience a housing shortage and have conducted a feasibility study examining potential properties suitable for future housing development. Sitansisk is proceeding with plans to construct a housing development for up to 30 lots on approximately 3 hectares of land.  Activities include clearing, grubbing, and grading of the development area, new roadways, ditches, water and wastewater services and stormwater ponds to manage storm water.  

Project Settlers Road Widening

  • Location (Kootenay National Park of Canada, British Columbia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 90641
  • Last Modified: 2026-08-14
  • Relevance: 414.44
  • The proposed project will widen the single-lane section to accommodate two-lane traffic. As well, widen two nearby sections of road to improve the line of site and road safety. The project location is between kilometre five and six and begins at approximately 50°40'6.72"N 115°51'14.87"W. The scope of work includes tree and vegetation removal, slope excavation, and debris removal.

Project Moosomin First Nation Landfill Decommissioning

  • Location (Moosomin First Nation, Saskatchewan)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 90640
  • Last Modified: 2026-08-14
  • Relevance: 414.44
  • Moosomin First Nation is proposing to conduct landfill decommissioning and reclamation of the historical dumpsite located in SW-32-47-16-W3M. Decommissioning activities will start with removing contaminated soil from mixed waste dioxins and furans from the impacted borehole site and deliver contaminated soil to appropriate facility. Following the removal of the contaminated material,  site preparation will include removing any metal, oil cans, shingles and other non-inert waste and moving ...

Project Ochapowace Nation Landfill Decommissioning

  • Location (Ochapowace Nation, Saskatchewan)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 90639
  • Last Modified: 2026-08-14
  • Relevance: 414.44
  • Ochapowace Nation is proposing to conduct landfill decommissioning and reclamation of the historical dumpsite located in NW 32-17-03-W2M. Decommissioning activities will start with site preparation which includes removing any metal, oil cans, shingles and other non-inert waste and moving any inert waste into the existing cells. Site will then be graded and contoured to ensure 3:1 slope of the material in each of the cells.  A 500 mm layer of clay will be placed and compacted over each of ...

Project North Corridor Expansion Project

  • Location (Chin Inn Open Camp, Alberta) (Bear Canyon, Alberta) (Range Road 131A, Alberta) (Highway 741, Alberta) (Township Road 940, Alberta) (Highway 88, Alberta) (Peerless Lake, Alberta)
  • Assessment Type: Environmental assessment under CEAA 2012
  • Status: Completed
  • Reference Number: 80176
  • Last Modified: 2026-08-13
  • Relevance: 414.41
  • NOVA Gas Transmission Ltd. (NGTL) is applying to the National Energy Board under section 52 of the National Energy Board Act for approval to construct and operate the North Corridor Expansion Project (the Project) in Alberta.  The Project consists of three natural gas pipelines: two sections of 1,219 mm (nominal pipe size 48 inch), including the 24 km long North Star Section 2 and the 32 km long Red Earth Section 3, and a third section of 1,219 mm (nominal pipe size 36 inch) which is 25 km ...

Project Edson Mainline Expansion Project

  • Location (Drayton Valley, Alberta) (Drayton Valley, Alberta) (Rocky Mountain House, Alberta) (Rocky Mountain House, Alberta)
  • Assessment Type: Environmental assessment under CEAA 2012
  • Status: Completed
  • Reference Number: 80173
  • Last Modified: 2026-08-13
  • Relevance: 414.41
  • NOVA Gas Transmission Ltd. (NGTL) is applying to the National Energy Board under section 52 of the National Energy Board Act for approval to construct and operate the Edson Mainline Expansion Project (the Project) in Alberta.  The Project consists of two sections of 1,219 mm (nominal pipe size 48) natural gas pipeline, including the 40.2 km long Elk River Section and the 44.7 km long Alford Creek Section, and associated facilities.  The associated facilities include three mainline ...

Project NOVA Gas Transmission Ltd. - 2021 NGTL System Expansion Project

  • Location (Grande Prairie, Alberta) (Rocky Mountain House, Alberta)
  • Assessment Type: Environmental assessment under CEAA 2012
  • Status: Completed
  • Reference Number: 80153
  • Last Modified: 2026-08-13
  • Relevance: 414.41
  • NOVA Gas Transmission Limited (NGTL), a wholly owned subsidiary of Trans Canada, has filed an application for the 2021 NGTL System Expansion Project. NGTL proposes to build and operate approximately 344 km of 1,219 mm (NPS 48) outside diameter natural gas pipeline and associated facilities in northwestern Alberta. If approved, the project would "loop" or add new pipeline parallel or adjacent to, the existing NGTL System. The Project includes three main areas: Grande Prairie West ...

Project Cold Lake First Nation: CUZ46 Wastewater System Expansion

  • Location (Cold Lake First Nation, Alberta)
  • Assessment Type: Project on federal lands
  • Status: Completed
  • Reference Number: 86061
  • Last Modified: 2026-08-13
  • Relevance: 414.4
  •      The existing capacity of the Cold Lake First Nation wastewater collection and treatment system has been deemed insufficient to meet current and projected future demand. As such, Cold Lake First Nation proposes the expansion of its wastewater collection infrastructure to include an expansion of the collection system, and construction of a new lift station, 4.4 km of wastewater forcemain and gravity wastewater main, connection to the City of Cold Lake wastewater collection and ...

Project Heart Lake First Nation: CU370 Wastewater System Emergency Repairs

  • Location (Heart Lake First Nation, Alberta)
  • Assessment Type: Project on federal lands
  • Status: Completed
  • Reference Number: 85696
  • Last Modified: 2026-08-13
  • Relevance: 414.4
  • Heart Lake First Nation is completing emergency repairs to its wastewater systems infrastructure associated with the band administration offices and community center. Repairs to the system include construction of upgraded sanitary lines (214.6 m of 200 mm PVC pipe, 79.0 m of 150 mm PVC pipe, and 27.24 m of 50 mm HDPE low pressure sanitary main), construction of three new 1200 mm manholes, and upgrades to the water treatment plant filter and analyzer components. The intended repairs will be ...

Project Cold Lake First Nation: CUZD3 Phase II and III Water Distribution System

  • Location (Cold Lake First Nation, Alberta)
  • Assessment Type: Project on federal lands
  • Status: Completed
  • Reference Number: 86062
  • Last Modified: 2026-08-13
  • Relevance: 414.4
  • Cold Lake First Nation proposes to construct and operate Phase II and Phase III of its water distribution system on its lands at Cold Lake IR No. 149B. Phase II and III will consist of approximately 16 km water distribution main with service to approximately 50 homes. The water system will extend from existing service provided by the City of Cold Lake with line diameter ranging from 250 mm at the connection point to 100 mm at the branch extensions. The watermain network will cross several ...

Project CU472: Tthebatthi De¨ne´suline´ Nation Band Administration & CFS Community Building

  • Location (Thabacha Nare IR No. 196A, Alberta)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 90702
  • Last Modified: 2026-08-13
  • Relevance: 414.4
  • Tthebatthi De¨ne´suline´ Nation proposes the construction and operation of a new Band Administration & Child & Family Services Community Building on its lands at Thabacha Nare IR No. 196A. The proposed location consists of a cleared lot which was recently added to reserve and was previously used for as a wildland wildfire rapid attack base of operations. The building design includes a 1,783 square meter structure and a total building site footprint of 15,575 square ...

Project YUL Montréal-Trudeau International Airport - Addition of Above-Ground Fuel Storage Tanks at the YUL Garage

  • Location (YUL Montréal-Trudeau, Quebec)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 90701
  • Last Modified: 2026-08-13
  • Relevance: 414.4
  • The project involves installing three 45,000-litre storage tanks at the YUL Montréal-Trudeau Airport site for the storage of diesel, renewable diesel, and gasoline. These tanks will be used to fuel the heavy vehicles and maintenance equipment required for daily airport operations. The above-ground tanks will be located within the airport's secured area, near the maintenance garage.   By establishing on-site fuel storage capacity, ADM will enhance its ability to use ...

Last ModifiedDisplay Filters

Filters

Authorities Display Filters

Key Document Display Filters

Date modified: